South Carolina / Charleston

Deck Permit in Charleston, South Carolina

Permit required

Yes, a permit is required

Before building a residential deck. Decks sit under residential accessory structures on the city's Applications and Guidelines page, and the application and construction documents are emailed to permits@charleston-sc.gov. A deck with a roof is not an express permit and is handled as an addition.

Confirmed on official page Verified City of Charleston Permit Center, Development and Construction Services (Building Inspections Division)

By Mario Bailey, verified against official sources

Quick answer

Charleston requires a permit for a residential deck, at any size and any height. Decks are a published residential permit type on the Applications and Guidelines page and appear as "Deck (Residential) - No roof" on the Permit Center's express walk-through menu, and the zoning ordinance requires a building permit in advance of constructing any structure, a structure being defined as "Anything constructed or erected, the use of which demands its permanent location on the land." The city publishes no deck size or height carve-out anywhere; the deck entry on the Applications and Guidelines page still reads "Guidelines - Coming soon." Charleston does publish a Typical Deck Details package drawn from the 2018 South Carolina Residential Building Code that a permitted deck may be built to without separate engineering, but it applies only outside Flood Zone V and only to single-span, single-level decks, and a copy must be on the job site for every inspection.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?

When a permit is usually needed

Before building a residential deck. Decks sit under residential accessory structures on the city's Applications and Guidelines page, and the application and construction documents are emailed to permits@charleston-sc.gov. A deck with a roof is not an express permit and is handled as an addition.

What a deck permit costs in Charleston

Line item
deck permitBy formulaA $40.00 non-refundable application fee plus a valuation-based building permit fee, under the Building and Trade Permit Fee Schedule approved by Ordinance Nos. 2017-131, 2019-064 and 2019-072, effective October 1, 2019. The New Residential Valuation Table prices "Porches, decks, Patios" at "$45.92/ft2" of construction cost, which then runs through the Building Permit Fee Table: "Application Fee Only" at $1,000 or less, otherwise "$15.00 for the first $1,000 construction valuation, plus $5.00 for each additional thousand or fraction thereof, to and including $50,000." Plan review is 50% of the building permit fee.
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in Charleston

A residential deck permit application is a set of construction documents that show what will be built and prove it meets the IRC deck provisions. In practice that means a scaled site plan locating the deck and its setbacks, plus deck plans and structural details covering the footings, posts, beams, joists, ledger, guards, and stairs.

What most deck permit applications include:

  • A permit application identifying the work, the deck's size (square footage), and whether electrical work such as lights or receptacles is included, submitted for plan review before construction begins (IRC R106).
  • A scaled site plan (for example 1/4 inch to 1 foot) showing the new deck's location relative to the house, its overall length and width, and dimensioned distances from the deck to all property lines and other structures so required setbacks can be verified (IRC R106.1.1).
  • A deck plan drawn to scale showing overall dimensions and the framing layout: joist size, spacing, span, and species; beam size and span; post size and height; and footing or pier size and depth (IRC R507.4 posts, R507.5 beams, R507.6 joists, R507.3 footings).
  • A section or side elevation with connection details showing the ledger attachment to the house band joist with flashing, the fastener or bolt schedule, joist hangers, post-to-beam and post-to-footing connections, and the required lateral load connection (IRC R507.9 ledger connection, R507.9.2 lateral connection, R507.2.4 flashing).
  • Footing sizing derived from tributary area, the soil bearing value, and design loads per IRC Table R507.3.1, with footings shown bearing on undisturbed soil at the frost depth required by the jurisdiction (IRC R507.3).
  • Details for the guards required where the walking surface is more than 30 inches above grade, and for the stairs and handrails, showing guard height and opening limits, stair riser and tread dimensions, and handrail location (IRC R312 guards, R311.7 stairs and handrails).
  • For designs that fall outside the prescriptive R507 tables (for example multi-story or stacked decks, or a ledger attached to a cantilever), engineered and stamped structural plans are submitted in place of the prescriptive details (IRC R507.1 and R301).

General submittal guidance from IRC R106.1.1 (construction documents) and IRC R507 (exterior decks), 2021 IRC. Source. City of Charleston Permit Center, Development and Construction Services (Building Inspections Division) sets the exact checklist for Charleston.

Where to apply in Charleston:

City of Charleston Permit Center, Development and Construction Services (Building Inspections Division)

Inspections and closing out your permit

Deck work is inspected in sequence as it is built: the footings before concrete is placed, the framing before the decking boards go down, and a final inspection once the deck is complete. Each stage checks the items that would be hidden or unsafe if missed.

  1. Footing or pier inspection: after the holes are dug and any forms or reinforcing are set but before concrete is placed, the inspector checks footing depth and diameter, a flat undisturbed bearing surface, and that the holes are free of water (IRC R109.1.1 foundation inspection; R507.3 footings).
  2. Framing inspection: after the deck is framed but before the decking conceals it, the inspector verifies the ledger attachment and its flashing, the fastener and bolt schedule, joist hangers and metal connectors, post-to-beam and post-to-footing connections, and the lateral load connection; call it before decking is installed (IRC R109.1.4 frame inspection; R507.9 ledger and flashing).
  3. Final inspection: after the deck is complete and before it is used, the inspector confirms guard height and opening limits (a 4 inch sphere must not pass, 4 3/8 inch at stairs), stair riser and tread dimensions, handrail height and graspability where there are 4 or more risers, stair landings, and required stair lighting (IRC R109.1.6 final inspection; R312 guards, R311.7 stairs and handrails).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Charleston permit portal or by phone at 843-577-5550.

Inspection sequence from IRC R109 (inspections: R109.1.1 footing before concrete, R109.1.4 frame, R109.1.6 final), 2021 IRC. Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need a deck permit in Charleston?
Charleston requires a permit for a residential deck, at any size and any height. Decks are a published residential permit type on the Applications and Guidelines page and appear as "Deck (Residential) - No roof" on the Permit Center's express walk-through menu, and the zoning ordinance requires a building permit in advance of constructing any structure, a structure being defined as "Anything constructed or erected, the use of which demands its permanent location on the land." The city publishes no deck size or height carve-out anywhere; the deck entry on the Applications and Guidelines page still reads "Guidelines - Coming soon." Charleston does publish a Typical Deck Details package drawn from the 2018 South Carolina Residential Building Code that a permitted deck may be built to without separate engineering, but it applies only outside Flood Zone V and only to single-span, single-level decks, and a copy must be on the job site for every inspection. Always confirm with the City of Charleston Permit Center, Development and Construction Services (Building Inspections Division) before starting.
How much does a deck permit cost in Charleston?
A $40.00 non-refundable application fee plus a valuation-based building permit fee, under the Building and Trade Permit Fee Schedule approved by Ordinance Nos. 2017-131, 2019-064 and 2019-072, effective October 1, 2019. The New Residential Valuation Table prices "Porches, decks, Patios" at "$45.92/ft2" of construction cost, which then runs through the Building Permit Fee Table: "Application Fee Only" at $1,000 or less, otherwise "$15.00 for the first $1,000 construction valuation, plus $5.00 for each additional thousand or fraction thereof, to and including $50,000." Plan review is 50% of the building permit fee. See the official fee schedule for current amounts.
How long does a deck permit take in Charleston?
Possible same-visit approval. "Deck (Residential) - No roof" is on the Permit Center's "Menu of 'Express' Permits (In Person Only)," which "have the possibility of receiving over-the-counter in-person approval if submitted and walked through the Permit Center from 9 a.m. to 4:30 p.m., however approval is never a guarantee.". Times can vary by workload and project scope, so confirm with the office.
Where do you apply for a deck permit in Charleston?
You can apply through the Charleston permit portal or contact the City of Charleston Permit Center, Development and Construction Services (Building Inspections Division) directly. The links are listed on this page.
Can a homeowner pull a deck permit themselves in Charleston?
Under South Carolina law (S.C. Code Ann. 40-59-260(A), (B), (C), (E), (F); 40-59-265; 40-59-280; 40-59-20(6), (7); 40-59-30(A)): South Carolina licenses residential builders and residential specialty contractors under S.C. Code Title 40 Chapter 59, and 40-59-260 exempts the owner of record who builds for himself. The exemption applies only if the owner does the work himself, with his own employees, or with licensed contractors or registered entities, if the structure is intended for the owner's sole occupancy or occupancy by the owner's family and is not intended for sale or rent, and if the general public does not have access to it. The owner must personally appear and sign the building permit application, and the local permitting agency must hand over a disclosure statement whose statutory text reads in part: You must supervise the construction yourself. You may build or improve a one-family or two-family residence. The building must be for your own use and occupancy. It may not be built for sale or rent. The sale restriction is two years and is a presumption rather than a flat bar: 40-59-260(B) makes proof of sale or rent, or of offering for sale or rent, within two years after completion or issuance of a certificate of occupancy prima facie evidence that the project was undertaken for sale or rent, which forfeits the exemption and exposes the owner to the chapter's penalties. South Carolina then adds a step no other state in this wave has: 40-59-260(E) requires the owner to promptly record a notice with the register of deeds, indexed under the owner's name in the grantor index, stating that the building was constructed by the owner as an unlicensed builder, and failure to record revokes the statutory exemption. The exemption is from the licensing chapter, not from the permit, and 40-59-280 requires the building official to refuse a permit unless the applicant furnishes evidence of licensure, registration, or exemption. Confirm how Charleston applies this before you apply.

From the Library

What else needs a permit in Charleston

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Electrical PermitIt dependsNot specifiedA $40.00 non-refundable application fee, which the schedule says "is in addition to the...
Fence PermitPermit requiredNot specifiedNo fence line item exists.
HVAC PermitIt dependsNot specifiedA $40.00 non-refundable application fee, which the schedule states "is in addition to...
Plumbing PermitIt dependsNot specifiedA $40.00 non-refundable application fee, which the schedule says "is in addition to the...
Pool PermitIt dependsprefabricated swimming poolsThe pool guideline says the Application Fee, Plan Review Fee and Building Permit Fee all...
Roof Replacement PermitPermit requiredNot specifiedThe roofing guideline sends all three fees to page 4 of the Building and Trade Permit...
Shed PermitPermit requiredNot specifiedA $40.00 non-refundable application fee plus a valuation-based building permit fee...
Solar PermitPermit requiredNot specifiedTwo permits, two fees.

Deck Permit in other South Carolina localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not Charleston documents; the office above sets the local rules.

Verified by a person against the sources above on , not confirmed with City of Charleston Permit Center, Development and Construction Services (Building Inspections Division). Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page