South Carolina / Charleston

Electrical Permit in Charleston, South Carolina

It depends

Sometimes, depending on the project

Before new service for a new building, complete wiring or a complete re-wire, a service upgrade or repair, adding or replacing circuits, equipment or devices, a transfer switch, a generator, solar panels, a lightning protection system, or reactivating a disconnected service. Each of those is a work-type checkbox on Charleston's Electrical Trade Permit Application (Form 4.1), which can be filed stand-alone or as a sub-permit under a building master permit.

Confirmed on official page Verified City of Charleston Permit Center, Development and Construction Services (Building Inspections Division)

By Mario Bailey, verified against official sources

Quick answer

Charleston requires an electrical trade permit for residential electrical work, stand-alone or as a sub-permit, and the city works to the 2020 National Electrical Code. The exemptions are the statewide ones at S.C. Code 40-59-265: listed cord-and-plug connected temporary decorative lighting, reinstalling attachment plug receptacles but not the outlets, replacing a branch circuit overcurrent device of the required capacity in the same location, wiring and equipment operating at less than 25 volts and not capable of supplying more than 50 watts, and minor repair work such as replacing lamps or plugging approved portable equipment into approved permanent receptacles. Everything a homeowner would recognise as an electrical project falls outside that list. The city adds a utility handoff of its own: a Pre-Power inspection is required before a meter is set or reactivated, and net-metered solar "Requires Approval and Additional Meter from Dominion Energy."

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?

When a permit is usually needed

Before new service for a new building, complete wiring or a complete re-wire, a service upgrade or repair, adding or replacing circuits, equipment or devices, a transfer switch, a generator, solar panels, a lightning protection system, or reactivating a disconnected service. Each of those is a work-type checkbox on Charleston's Electrical Trade Permit Application (Form 4.1), which can be filed stand-alone or as a sub-permit under a building master permit.

What an electrical permit costs in Charleston

Line item
electrical permitBy formulaA $40.00 non-refundable application fee, which the schedule says "is in addition to the Electrical Permit Fee," plus the Electrical Permit Fee Table rate of "$0.25 per ampere (amp)" for "New, Replacement or Upgrade Service." Two line items carry no application fee: "Electrical Safety $30.00 (No Application Fee)" and "Temporary Power Pole $40.00 (No Application Fee)." Building and Trade Permit Fee Schedule approved by Ordinance Nos. 2017-131, 2019-064 and 2019-072, effective October 1, 2019.
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in Charleston

In most US jurisdictions, the property owner or a licensed electrician applies for an electrical permit before work starts, describing the scope of work and the property and typically attaching plans. Some minor, like-for-like electrical repairs are commonly exempt, and once issued the permit is kept on site until the job is finished.

What most electrical permit applications include:

  • Before any electrical work begins, the owner or an authorized agent must first apply to the building official and obtain the required permit (IRC R105.1).
  • The written application must identify and describe the electrical work covered by the permit and describe the property, such as by street address, well enough to locate the job (IRC R105.3).
  • The application must be accompanied by construction documents (plans) and any other information the permit office requires, and must be signed by the applicant or an authorized agent (IRC R105.3).
  • Certain minor or like-for-like electrical jobs, such as replacing a branch-circuit breaker of the required capacity in the same location, are commonly exempt from needing a separate permit (IRC R105.2).
  • Once issued, the building permit or a copy of it must be kept at the job site until the project is complete (IRC R105.7).

General submittal guidance from International Residential Code (IRC), Section R105, Permits (2015 and 2021 editions, as locally adopted). Source. City of Charleston Permit Center, Development and Construction Services (Building Inspections Division) sets the exact checklist for Charleston.

Where to apply in Charleston:

City of Charleston Permit Center, Development and Construction Services (Building Inspections Division)

Inspections and closing out your permit

Electrical work under a permit is inspected at least twice: a rough-in inspection of the wiring before it is covered by drywall or insulation, and a final inspection once all devices, panels, and labeling are complete. Inspectors also check specific safety items along the way, such as GFCI and AFCI protection, panel circuit directories, and the service disconnect location.

  1. A rough-in inspection of the electrical wiring is required before it is covered or concealed by insulation, drywall, or other finish material, and before fixtures or appliances are set (IRC R109.1.2).
  2. The framing inspection cannot proceed until the plumbing, mechanical, and electrical rough-in inspections have all been approved (IRC R109.1.4).
  3. Ground-fault circuit-interrupter (GFCI) protection is checked at receptacles in bathrooms, kitchens, garages, basements, crawl spaces, outdoors, and other damp or wet locations (NEC 210.8(A)).
  4. Arc-fault circuit-interrupter (AFCI) protection is verified on branch circuits serving bedrooms, living areas, and most other habitable rooms (NEC 210.12(A)).
  5. Panelboards must carry a circuit directory that legibly and specifically identifies the purpose of each circuit, not a vague label (NEC 408.4).
  6. The service disconnect must be installed in a readily accessible location, either outside the structure or just inside the point where the service conductors enter (NEC 230.70).
  7. A final inspection is made only after all permitted electrical work is complete, and the wiring cannot be used or the space occupied until it passes (IRC R109.1.6).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Charleston permit portal or by phone at 843-577-5550.

Inspection sequence from International Residential Code (IRC), Section R109, Required Inspections, and NFPA 70 National Electrical Code (NEC), 2020 and 2023 editions. Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need an electrical permit in Charleston?
Charleston requires an electrical trade permit for residential electrical work, stand-alone or as a sub-permit, and the city works to the 2020 National Electrical Code. The exemptions are the statewide ones at S.C. Code 40-59-265: listed cord-and-plug connected temporary decorative lighting, reinstalling attachment plug receptacles but not the outlets, replacing a branch circuit overcurrent device of the required capacity in the same location, wiring and equipment operating at less than 25 volts and not capable of supplying more than 50 watts, and minor repair work such as replacing lamps or plugging approved portable equipment into approved permanent receptacles. Everything a homeowner would recognise as an electrical project falls outside that list. The city adds a utility handoff of its own: a Pre-Power inspection is required before a meter is set or reactivated, and net-metered solar "Requires Approval and Additional Meter from Dominion Energy." Always confirm with the City of Charleston Permit Center, Development and Construction Services (Building Inspections Division) before starting.
How much does an electrical permit cost in Charleston?
A $40.00 non-refundable application fee, which the schedule says "is in addition to the Electrical Permit Fee," plus the Electrical Permit Fee Table rate of "$0.25 per ampere (amp)" for "New, Replacement or Upgrade Service." Two line items carry no application fee: "Electrical Safety $30.00 (No Application Fee)" and "Temporary Power Pole $40.00 (No Application Fee)." Building and Trade Permit Fee Schedule approved by Ordinance Nos. 2017-131, 2019-064 and 2019-072, effective October 1, 2019. See the official fee schedule for current amounts.
How long does an electrical permit take in Charleston?
Possible same-visit approval. "Standalone Trades (Residential & Commercial)" appear on the Permit Center's "Menu of 'Express' Permits (In Person Only)," with the caveat "Repairs and in-kind replacements only for Commercial," and approval "is never a guarantee.". Times can vary by workload and project scope, so confirm with the office.
Where do you apply for an electrical permit in Charleston?
You can apply through the Charleston permit portal or contact the City of Charleston Permit Center, Development and Construction Services (Building Inspections Division) directly. The links are listed on this page.
Can a homeowner pull an electrical permit themselves in Charleston?
Under South Carolina law (S.C. Code Ann. 40-59-260(A), (B), (C), (E), (F); 40-59-265; 40-59-280; 40-59-20(6), (7); 40-59-30(A)): South Carolina licenses residential builders and residential specialty contractors under S.C. Code Title 40 Chapter 59, and 40-59-260 exempts the owner of record who builds for himself. The exemption applies only if the owner does the work himself, with his own employees, or with licensed contractors or registered entities, if the structure is intended for the owner's sole occupancy or occupancy by the owner's family and is not intended for sale or rent, and if the general public does not have access to it. The owner must personally appear and sign the building permit application, and the local permitting agency must hand over a disclosure statement whose statutory text reads in part: You must supervise the construction yourself. You may build or improve a one-family or two-family residence. The building must be for your own use and occupancy. It may not be built for sale or rent. The sale restriction is two years and is a presumption rather than a flat bar: 40-59-260(B) makes proof of sale or rent, or of offering for sale or rent, within two years after completion or issuance of a certificate of occupancy prima facie evidence that the project was undertaken for sale or rent, which forfeits the exemption and exposes the owner to the chapter's penalties. South Carolina then adds a step no other state in this wave has: 40-59-260(E) requires the owner to promptly record a notice with the register of deeds, indexed under the owner's name in the grantor index, stating that the building was constructed by the owner as an unlicensed builder, and failure to record revokes the statutory exemption. The exemption is from the licensing chapter, not from the permit, and 40-59-280 requires the building official to refuse a permit unless the applicant furnishes evidence of licensure, registration, or exemption. Confirm how Charleston applies this before you apply.

From the Library

What else needs a permit in Charleston

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredNot specifiedA $40.00 non-refundable application fee plus a valuation-based building permit fee...
Fence PermitPermit requiredNot specifiedNo fence line item exists.
HVAC PermitIt dependsNot specifiedA $40.00 non-refundable application fee, which the schedule states "is in addition to...
Plumbing PermitIt dependsNot specifiedA $40.00 non-refundable application fee, which the schedule says "is in addition to the...
Pool PermitIt dependsprefabricated swimming poolsThe pool guideline says the Application Fee, Plan Review Fee and Building Permit Fee all...
Roof Replacement PermitPermit requiredNot specifiedThe roofing guideline sends all three fees to page 4 of the Building and Trade Permit...
Shed PermitPermit requiredNot specifiedA $40.00 non-refundable application fee plus a valuation-based building permit fee...
Solar PermitPermit requiredNot specifiedTwo permits, two fees.

Electrical Permit in other South Carolina localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not Charleston documents; the office above sets the local rules.

Verified by a person against the sources above on , not confirmed with City of Charleston Permit Center, Development and Construction Services (Building Inspections Division). Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page