Plumbing Permit in Charleston, South Carolina
It depends
Sometimes, depending on the project
Before new service for a new building, adding new fixtures, adding new system piping, repairing existing system piping, a water heater, a backflow preventer, a grease trap or an NFPA 13D residential sprinkler system. Those are the work-type checkboxes on Charleston's Plumbing Trade Permit Application (Form 6.1), which can be filed stand-alone or as a sub-permit under a building master permit.
Quick answer
Charleston requires a plumbing trade permit for residential plumbing work and applies the 2021 South Carolina Plumbing Code. The carve-out is the statewide one at S.C. Code 40-59-265, and it is narrower than it first looks: stopping a leak and clearing a stoppage are exempt, and so is removing and reinstalling a water closet, but only where the repair does not involve replacing or rearranging valves, pipes or fixtures, and the statute says outright that if a concealed trap or pipe must be removed and replaced with new material "such work must be considered as new work and a permit must be obtained." Charleston's form also routes several items away from the city: a well or a private septic system needs DHEC permits, a grease trap or backflow preventer needs a sizing inspection from Charleston Water System or the James Island Public Service District, and a water heater pulls an electrical or gas permit alongside the plumbing one.
- Issued by
- City of Charleston Permit Center, Development and Construction Services (Building Inspections Division)
- Phone
- 843-577-5550
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
Plumbing permits are usually pulled by the plumber doing the job. If you are still choosing one, compare a few quotes first.
Compare plumber quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What a plumbing permit costs in Charleston
- Fee schedule in force
- Official scheduleRead .
A $40.00 non-refundable application fee, which the schedule says "is in addition to the Plumbing Permit Fee," plus the Plumbing Permit Fee Table rates: "Each Plumbing Fixture $3.50," "Building Water Supply - New, Replacement or Repair $10.00," and "Building Sewer - New, Replacement or Repair $10.00."
Building and Trade Permit Fee Schedule approved by Ordinance Nos. 2017-131, 2019-064 and 2019-072, effective October 1, 2019.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How Charleston compares in South Carolina
| Jurisdiction | Permit needed? | Threshold |
|---|---|---|
| Charlestonthis page | It depends | Before new service for a new building, adding new fixtures, adding new system piping... |
| Columbia | It depends | Before a repipe, fixture addition, water heater replacement, sewer work or any... |
| Greenville County | It depends | Before adding or relocating plumbing fixtures, replacing concealed pipe, or connecting... |
How to apply in Charleston
General guide, not specific to this office
What a plumbing permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a plumbing permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
City of Charleston Permit Center, Development and Construction Services (Building Inspections Division)
- 2 George Street, Ground Floor, Charleston, SC 29401
- Phone: 843-577-5550
- Email: permits@charleston-sc.gov
Your Plumbing Permit checklist for Charleston
- Confirm the requirement. Sometimes, depending on the project. Read the rule where we read it: charleston-sc.gov: Permit Center.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Charleston permit portal.
- Keep the office details handy. City of Charleston Permit Center, Development and Construction Services (Building Inspections Division). Phone: 843-577-5550. Email: permits@charleston-sc.gov. Address: 2 George Street, Ground Floor, Charleston, SC 29401.
Compiled from the official sources on this page. Last checked .
Permitting activity in Charleston
In 2025, Charleston authorized permits for 1,311 new residential housing units (819 single-family, 492 in multi-family buildings), valued at $210M, up from 1,144 the year before. That works out to about 10.1 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 129,814.
What else needs a permit in Charleston
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | Permit required | Any size | A $40.00 non-refundable application fee plus a valuation-based building permit fee; the schedule has the rest |
| Electrical Permit | It depends | Before new service for a new building, complete wiring or a complete re-wire, a service... | A $40.00 non-refundable application fee; the schedule has the rest |
| Fence Permit | Permit required | Any size | See schedule |
| HVAC Permit | It depends | Before a new HVAC system for a new building, a new or upgraded system for an existing... | A $40.00 non-refundable application fee; the schedule has the rest |
| Pool Permit | It depends | prefabricated swimming pools | See schedule |
| Roof Replacement Permit | Permit required | Any size | See schedule |
| Shed Permit | Permit required | Any size | A $40.00 non-refundable application fee plus a valuation-based building permit fee; the schedule has the rest |
| Solar Permit | Permit required | Any size | See schedule |
Frequently asked questions
- Do you need a plumbing permit in Charleston?
- Sometimes: before new service for a new building, adding new fixtures, adding new system piping, repairing existing system piping, a water heater, a backflow preventer, a grease trap or an NFPA 13D residential sprinkler system. Those are the work-type checkboxes on Charleston's Plumbing Trade Permit Application (Form 6.1), which can be filed stand-alone or as a sub-permit under a building master permit. If you are unsure how that applies to your project, call the permit office at 843-577-5550 before you start.
- How much does a plumbing permit cost in Charleston?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Aug 2026. For the figure on your own project, call the permit office at 843-577-5550.
- How long does a plumbing permit take in Charleston?
- Possible same-visit approval. "Standalone Trades (Residential & Commercial)" appear on the Permit Center's "Menu of 'Express' Permits (In Person Only)," with the caveat "Repairs and in-kind replacements only for Commercial," and approval "is never a guarantee.". Times can vary by workload and project scope, so confirm with the office.
- Where do you apply for a plumbing permit in Charleston?
- You can apply through the Charleston permit portal or contact the City of Charleston Permit Center, Development and Construction Services (Building Inspections Division) directly. The links are listed on this page.
- Can a homeowner pull a plumbing permit themselves in Charleston?
- Under South Carolina law (S.C. Code Ann. 40-59-260(A), (B), (C), (E), (F); 40-59-265; 40-59-280; 40-59-20(6), (7); 40-59-30(A)): South Carolina licenses residential builders and residential specialty contractors under S.C. Code Title 40 Chapter 59, and 40-59-260 exempts the owner of record who builds for himself. The exemption applies only if the owner does the work himself, with his own employees, or with licensed contractors or registered entities, if the structure is intended for the owner's sole occupancy or occupancy by the owner's family and is not intended for sale or rent, and if the general public does not have access to it. The owner must personally appear and sign the building permit application, and the local permitting agency must hand over a disclosure statement whose statutory text reads in part: You must supervise the construction yourself. You may build or improve a one-family or two-family residence. The building must be for your own use and occupancy. It may not be built for sale or rent. The sale restriction is two years and is a presumption rather than a flat bar: 40-59-260(B) makes proof of sale or rent, or of offering for sale or rent, within two years after completion or issuance of a certificate of occupancy prima facie evidence that the project was undertaken for sale or rent, which forfeits the exemption and exposes the owner to the chapter's penalties. South Carolina then adds a step no other state in this wave has: 40-59-260(E) requires the owner to promptly record a notice with the register of deeds, indexed under the owner's name in the grantor index, stating that the building was constructed by the owner as an unlicensed builder, and failure to record revokes the statutory exemption. The exemption is from the licensing chapter, not from the permit, and 40-59-280 requires the building official to refuse a permit unless the applicant furnishes evidence of licensure, registration, or exemption. Confirm how Charleston applies this before you apply.
From the Library
Plumbing Permit in other South Carolina localities
Everything above, sourced
How this plumbing permit page for Charleston was verified. 2 official sources: charleston-sc.gov, scstatehouse.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Charleston Permit Center, Development and Construction Services (Building Inspections Division). Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page