Oregon / Portland

Fence Permit in Portland, Oregon

It depends

Sometimes, depending on the project

Before building a wood fence taller than 7 feet, a masonry or concrete fence taller than 4 feet, a woven wire or chain link fence taller than 8 feet, or any fence that encloses a swimming pool.

Quick answer

Portland Permitting & Development sets the fence permit trigger by material rather than a single height. A building permit is needed for a wood fence over 7 feet, a masonry or concrete fence over 4 feet, or a woven wire or chain link fence over 8 feet. Every barrier enclosing a swimming pool needs a permit regardless of height. Height is measured from the ground where the posts enter the ground to the top of the fence, including any lattice or other material added to the top.

Typical threshold
wood and similar materials; 4 feet for masonry or concrete, 8 feet for woven wire or chain link, and any barrier around a swimming pool
Issued by
Portland Permitting & Development
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

Fence installers usually handle any required permit as part of the job. Compare a few bids before you commit.

Compare fence installer quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What a fence permit costs in Portland

Fee basis
Project valuation
Fee schedule in force
Official scheduleRead .
Published in
Building and Other Permits Fee Schedule for the City of Portland, effective July 10, 2026:
  • Building Permit Fee is valuation based, with a $167.00 minimum fee for total value of construction work of $1 to $500.
  • A separate Development Services Fee - Residential applies to all building permits, minimum $21.19 in the same value band.
  • The fee schedule page adds that for all building, plumbing, electrical, and mechanical permits a 12% surcharge is applied by the State of Oregon.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in Portland

General guide, not specific to this office

What a fence permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a fence permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

Portland Permitting & Development

Fence Permit in Portland compared with nearby Oregon localities

LocalityPermit needed?ThresholdWhat each Oregon schedule saysVerified
PortlandIt dependswood and similar materials; 4 feet for masonry or concrete, 8 feet for woven wire or chain link, and any barrier around a swimming poolBuilding and Other Permits Fee Schedule for the City of Portland, effective July 10, 2026: Building Permit Fee is valuation based; the schedule has the rest
EugeneIt dependsfences of wood, wire mesh, chain link or other material weighing 5 pounds per square foot or less, with a 6 foot limit for materials heavier than 5 pounds per square footSee schedule

Permitting activity in Portland

In 2025, Portland authorized permits for 1,223 new residential housing units (703 single-family, 520 in multi-family buildings), valued at $319M, down from 1,700 the year before. That works out to about 1.9 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 654,033.

What else needs a permit in Portland

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsheight of the deck walking surface above adjacent grade, taken 36 inches out from the edge of the deckBuilding and Other Permits Fee Schedule for the City of Portland, effective July 10, 2026: Building Permit Fee is valuation based; the schedule has the rest
Electrical PermitIt dependsBefore adding a light fixture or outlet, changing a fuse box to circuit breakers...See schedule
HVAC PermitPermit requiredAny sizeMechanical Permit Fee Schedule for the City of Portland, effective July 10, 2026, One & Two Family Dwelling Fees: minimum fee $167.00
Patio PermitIt dependsarea of an attached patio cover, porch cover, carport, or other open-sided roofed structureBuilding and Other Permits Fee Schedule for the City of Portland, effective July 10, 2026: Building Permit Fee is valuation based; the schedule has the rest
Plumbing PermitIt dependsBefore repairing, replacing, or moving plumbing pipes, adding new piping, capping pipes...Per fixture or item: water heater $63.00, water closet $63.00, tubs, shower or shower pan $63.00, sinks, basins or lavatories $63.00; the schedule has the rest
Pool PermitIt dependsdepth of water in a structure used for swimming or recreational bathingBuilding and Other Permits Fee Schedule for the City of Portland, effective July 10, 2026: Building Permit Fee is valuation based; the schedule has the rest
Roof Replacement PermitIt dependsBefore reroofing a dwelling in a Wildfire Zone, reroofing a townhouse, installing...See schedule
Shed PermitIt dependsin area, or a height over 15 feet from the grade plane to the average height of the highest roof surface; on lots over 2 acres the area trigger rises to 400 square feet when the structure is at least 20 feet from property lines and other structuresBuilding and Other Permits Fee Schedule for the City of Portland, effective July 10, 2026: Building Permit Fee is valuation based; the schedule has the rest
Solar PermitPermit requiredAny sizeSee schedule

Frequently asked questions

Do you need a fence permit in Portland?
It depends on the project. Wood and similar materials; 4 feet for masonry or concrete, 8 feet for woven wire or chain link, and any barrier around a swimming pool. If you are unsure how that applies to your project, call the Portland Permitting & Development at 503-823-7300 before you start.
How much does a fence permit cost in Portland?
The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Aug 2026. For the figure on your own project, call the Portland Permitting & Development at 503-823-7300.
Where do you apply for a fence permit in Portland?
You can apply through the Portland permit portal or contact the Portland Permitting & Development directly. The links are listed on this page.
Can a homeowner pull a fence permit themselves in Portland?
Under Oregon law (ORS 701.010(7); ORS 701.325(1), (2), (3)): A homeowner may pull the permit and do the work. ORS 701.010(7) exempts from Construction Contractors Board licensing a person performing work on property that person owns, or on that person's own residence whether or not they own it, so no CCB license is needed to act as your own builder. That exemption does not cover someone working in the pursuit of an independent business with intent to offer the structure for sale. Oregon does require a signed disclosure at the counter: ORS 701.325(1) makes every city, county, or state permit office collect a written statement signed by the applicant, and an applicant claiming a licensing exemption must state the basis for it. ORS 701.325(2) requires the office to give the applicant the Information Notice to Property Owners About Construction Responsibilities and withhold the residential building permit until the applicant signs a statement, one option of which is that they are performing work on property they own or a residence they live in or will live in, and that any contractors they hire will be CCB licensed and properly endorsed. The Information Notice itself is a CCB rule form under ORS 701.325(3) covering payroll tax, workers' compensation, and liability and property damage insurance responsibilities. Confirm how Portland applies this before you apply.

From the Library

Fence Permit in other Oregon localities

Everything above, sourced

How this fence permit page for Portland was verified. 2 official sources: portland.gov, portland.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Portland Permitting & Development. Rules change; confirm before you build. How we verify.