Fence Permit in Portland, Oregon
It depends
Sometimes, depending on the project
Before building a wood fence taller than 7 feet, a masonry or concrete fence taller than 4 feet, a woven wire or chain link fence taller than 8 feet, or any fence that encloses a swimming pool.
Quick answer
Portland Permitting & Development sets the fence permit trigger by material rather than a single height. A building permit is needed for a wood fence over 7 feet, a masonry or concrete fence over 4 feet, or a woven wire or chain link fence over 8 feet. Every barrier enclosing a swimming pool needs a permit regardless of height. Height is measured from the ground where the posts enter the ground to the top of the fence, including any lattice or other material added to the top.
- Typical threshold
- wood and similar materials; 4 feet for masonry or concrete, 8 feet for woven wire or chain link, and any barrier around a swimming pool
- Issued by
- Portland Permitting & Development
- Phone
- 503-823-7300
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
Fence installers usually handle any required permit as part of the job. Compare a few bids before you commit.
Compare fence installer quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What a fence permit costs in Portland
- Fee basis
- Project valuation
- Fee schedule in force
- Official scheduleRead .
- Published in
- Building and Other Permits Fee Schedule for the City of Portland, effective July 10, 2026:
- Building Permit Fee is valuation based, with a $167.00 minimum fee for total value of construction work of $1 to $500.
- A separate Development Services Fee - Residential applies to all building permits, minimum $21.19 in the same value band.
- The fee schedule page adds that for all building, plumbing, electrical, and mechanical permits a 12% surcharge is applied by the State of Oregon.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How to apply in Portland
General guide, not specific to this office
What a fence permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a fence permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
Portland Permitting & Development
- Development Services Center, 1900 SW Fourth Avenue, First floor lobby, Portland, OR 97201
- Phone: 503-823-7300
- Email: permittingservices@portlandoregon.gov
Fence Permit in Portland compared with nearby Oregon localities
| Locality | Permit needed? | Threshold | What each Oregon schedule says | Verified |
|---|---|---|---|---|
| Portland | It depends | wood and similar materials; 4 feet for masonry or concrete, 8 feet for woven wire or chain link, and any barrier around a swimming pool | Building and Other Permits Fee Schedule for the City of Portland, effective July 10, 2026: Building Permit Fee is valuation based; the schedule has the rest | |
| Eugene | It depends | fences of wood, wire mesh, chain link or other material weighing 5 pounds per square foot or less, with a 6 foot limit for materials heavier than 5 pounds per square foot | See schedule |
Your Fence Permit checklist for Portland
- Confirm the requirement. Sometimes, depending on the project. Typical threshold: wood and similar materials; 4 feet for masonry or concrete, 8 feet for woven wire or chain link, and any barrier around a swimming pool. Read the rule where we read it: portland.gov: residential permits.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Portland permit portal.
- Keep the office details handy. Portland Permitting & Development. Phone: 503-823-7300. Email: permittingservices@portlandoregon.gov. Address: Development Services Center, 1900 SW Fourth Avenue, First floor lobby, Portland, OR 97201.
Compiled from the official sources on this page. Last checked .
Permitting activity in Portland
In 2025, Portland authorized permits for 1,223 new residential housing units (703 single-family, 520 in multi-family buildings), valued at $319M, down from 1,700 the year before. That works out to about 1.9 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 654,033.
What else needs a permit in Portland
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | height of the deck walking surface above adjacent grade, taken 36 inches out from the edge of the deck | Building and Other Permits Fee Schedule for the City of Portland, effective July 10, 2026: Building Permit Fee is valuation based; the schedule has the rest |
| Electrical Permit | It depends | Before adding a light fixture or outlet, changing a fuse box to circuit breakers... | See schedule |
| HVAC Permit | Permit required | Any size | Mechanical Permit Fee Schedule for the City of Portland, effective July 10, 2026, One & Two Family Dwelling Fees: minimum fee $167.00 |
| Patio Permit | It depends | area of an attached patio cover, porch cover, carport, or other open-sided roofed structure | Building and Other Permits Fee Schedule for the City of Portland, effective July 10, 2026: Building Permit Fee is valuation based; the schedule has the rest |
| Plumbing Permit | It depends | Before repairing, replacing, or moving plumbing pipes, adding new piping, capping pipes... | Per fixture or item: water heater $63.00, water closet $63.00, tubs, shower or shower pan $63.00, sinks, basins or lavatories $63.00; the schedule has the rest |
| Pool Permit | It depends | depth of water in a structure used for swimming or recreational bathing | Building and Other Permits Fee Schedule for the City of Portland, effective July 10, 2026: Building Permit Fee is valuation based; the schedule has the rest |
| Roof Replacement Permit | It depends | Before reroofing a dwelling in a Wildfire Zone, reroofing a townhouse, installing... | See schedule |
| Shed Permit | It depends | in area, or a height over 15 feet from the grade plane to the average height of the highest roof surface; on lots over 2 acres the area trigger rises to 400 square feet when the structure is at least 20 feet from property lines and other structures | Building and Other Permits Fee Schedule for the City of Portland, effective July 10, 2026: Building Permit Fee is valuation based; the schedule has the rest |
| Solar Permit | Permit required | Any size | See schedule |
Frequently asked questions
- Do you need a fence permit in Portland?
- It depends on the project. Wood and similar materials; 4 feet for masonry or concrete, 8 feet for woven wire or chain link, and any barrier around a swimming pool. If you are unsure how that applies to your project, call the Portland Permitting & Development at 503-823-7300 before you start.
- How much does a fence permit cost in Portland?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Aug 2026. For the figure on your own project, call the Portland Permitting & Development at 503-823-7300.
- Where do you apply for a fence permit in Portland?
- You can apply through the Portland permit portal or contact the Portland Permitting & Development directly. The links are listed on this page.
- Can a homeowner pull a fence permit themselves in Portland?
- Under Oregon law (ORS 701.010(7); ORS 701.325(1), (2), (3)): A homeowner may pull the permit and do the work. ORS 701.010(7) exempts from Construction Contractors Board licensing a person performing work on property that person owns, or on that person's own residence whether or not they own it, so no CCB license is needed to act as your own builder. That exemption does not cover someone working in the pursuit of an independent business with intent to offer the structure for sale. Oregon does require a signed disclosure at the counter: ORS 701.325(1) makes every city, county, or state permit office collect a written statement signed by the applicant, and an applicant claiming a licensing exemption must state the basis for it. ORS 701.325(2) requires the office to give the applicant the Information Notice to Property Owners About Construction Responsibilities and withhold the residential building permit until the applicant signs a statement, one option of which is that they are performing work on property they own or a residence they live in or will live in, and that any contractors they hire will be CCB licensed and properly endorsed. The Information Notice itself is a CCB rule form under ORS 701.325(3) covering payroll tax, workers' compensation, and liability and property damage insurance responsibilities. Confirm how Portland applies this before you apply.
From the Library
Fence Permit in other Oregon localities
Everything above, sourced
How this fence permit page for Portland was verified. 2 official sources: portland.gov, portland.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Portland Permitting & Development. Rules change; confirm before you build. How we verify.