It depends

Sometimes, depending on the project

Before building, demolishing, or moving a shed, garage, or other detached accessory structure that is more than 200 square feet in area or more than 15 feet tall.

Confirmed on official page Verified Portland Permitting & Development

By Mario Bailey, verified against official sources

Quick answer

Portland requires a building permit to build, tear down, or change a detached accessory structure over 200 square feet measured from the interior of exterior walls, or one taller than 15 feet measured from the grade plane to the average height of the highest roof surface. Non-habitable structures of 200 square feet or smaller do not need a building permit. On lots over 2 acres the exemption widens: no building permit if the structure is under 400 square feet and at least 20 feet from property lines and other structures. A building permit is required for habitable structures regardless of size.

Typical threshold: in area, or a height over 15 feet from the grade plane to the average height of the highest roof surface; on lots over 2 acres the area trigger rises to 400 square feet when the structure is at least 20 feet from property lines and other structures.

Diagram of the 200 sq ft footprint area threshold for a shed permit in Portland, Oregon
Threshold illustrated: 200 sq ft. Whether Portland requires a permit above or below this measurement is stated in the verdict on this page, verified 2026-08-16.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?

When a permit is usually needed

Before building, demolishing, or moving a shed, garage, or other detached accessory structure that is more than 200 square feet in area or more than 15 feet tall.

What a shed permit costs in Portland

Line item
shed permitBy formulaBuilding and Other Permits Fee Schedule for the City of Portland, effective July 10, 2026: Building Permit Fee is valuation based, with a $167.00 minimum fee for total value of construction work of $1 to $500. A Development Services Fee - Residential applies on top, minimum $21.19 in the same value band. The fee schedule notes the permit valuation methodology is mandated by the State of Oregon in OAR 918-050-0100, and the fee schedule page adds a 12% State of Oregon surcharge on building, plumbing, electrical, and mechanical permits.
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Portland compares in Oregon

Closest shed permit thresholds outside Oregon

Jurisdictions we cover whose limit sits nearest Portland's 200 sq ft.

  • Austin, Texas, one-story detached accessory structures used as tool or storage sheds with floor area no greater than 200 sq ft and no more than 15 ft in height and no plumbing and not in a floodplain are exempt
  • Baton Rouge, Louisiana, floor area of a detached accessory structure
  • Bellevue, Washington, detached storage sheds playhouses or gazebos with a floor area of 200 square feet or less do not require a building permit; structures over 200 square feet require a permit
  • Clark County, Nevada, sheds over 200 sq ft require a building permit; storage sheds 200 sq ft or under may be exempt under Building Administrative Code Section 22.02.190

How to apply in Portland

A residential shed permit application, once the shed is large enough to require one, is a set of construction documents that show what will be built and prove it meets the adopted residential code. In practice that means a written permit application, a scaled site plan locating the shed and its distances to the property lines, and construction documents covering the shed's foundation or anchoring system and its framing.

What most shed permit applications include:

  • A written permit application identifying the proposed work and describing the property by its address or legal description, filed with the building department before construction begins (IRC R105.3).
  • A scaled site plan showing the shed's size and location and its dimensioned distances to all property lines so required setbacks can be verified before the permit is issued (IRC R106.2).
  • Construction documents showing the shed's foundation: freestanding accessory structures at or under the code's small-structure size and eave-height limits (600 square feet and a 10 foot eave height in the model code) are exempt from continuous footings but must still be shown supported on undisturbed soil or engineered fill and anchored to resist wind-induced uplift and overturning (IRC R403.1).
  • Where the shed does sit on a continuous foundation with a wood sill plate, anchor bolt or approved strap details tying the sill plate to the foundation (IRC R403.1.6).
  • Roof framing details showing the rafter-to-wall or truss-to-wall connections, since even a shed exempt from continuous footings must be anchored to resist wind-induced uplift and overturning (IRC R403.1; R802.11).

General submittal guidance from IRC R105.3 (permit application), R106.2 (site plan), R403.1 (footings and anchorage for accessory structures), and R403.1.6 (sill anchorage), 2021 IRC. Source. Portland Permitting & Development sets the exact checklist for Portland.

Where to apply in Portland:

Portland Permitting & Development

Inspections and closing out your permit

A permitted shed is inspected in stages as it goes up: the foundation or the anchors that hold it down before they are covered, the framing before it is enclosed, and a final inspection once the shed is finished. Each stage checks the items that would be hidden or unsafe if skipped.

  1. Foundation or anchor inspection: called after any required footings, piers, or ground anchors are set and any forms or reinforcing steel are in place, but before concrete is placed, so the foundation or anchoring system can be verified before it is covered (IRC R109.1.1).
  2. Frame inspection: after the shed is framed, sheathed, and braced, the inspector checks the framing, bracing, fasteners, and the roof connections that resist wind uplift, before those elements are covered (IRC R109.1.4 frame inspection; R403.1 anchorage).
  3. Final inspection: made after the permitted work is complete and before the shed is used; work may not proceed past any inspection stage without the building official's approval (IRC R109.1.6 final inspection; R109.4 approval required).
  4. For a pre-fabricated or kit shed, the manufacturer's installation instructions must be on site at the time of inspection so the inspector can confirm the anchoring and assembly match the design (IRC R106.1.2).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Portland permit portal or by phone at 503-823-7300.

Inspection sequence from IRC R109.1.1 (foundation inspection), R109.1.4 (frame inspection), R109.1.6 (final inspection), and R106.1.2 (manufacturer's instructions on site), 2021 IRC. Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need a shed permit in Portland?
Portland requires a building permit to build, tear down, or change a detached accessory structure over 200 square feet measured from the interior of exterior walls, or one taller than 15 feet measured from the grade plane to the average height of the highest roof surface. Non-habitable structures of 200 square feet or smaller do not need a building permit. On lots over 2 acres the exemption widens: no building permit if the structure is under 400 square feet and at least 20 feet from property lines and other structures. A building permit is required for habitable structures regardless of size. In area, or a height over 15 feet from the grade plane to the average height of the highest roof surface; on lots over 2 acres the area trigger rises to 400 square feet when the structure is at least 20 feet from property lines and other structures. Always confirm with the office before starting.
How much does a shed permit cost in Portland?
Building and Other Permits Fee Schedule for the City of Portland, effective July 10, 2026: Building Permit Fee is valuation based, with a $167.00 minimum fee for total value of construction work of $1 to $500. A Development Services Fee - Residential applies on top, minimum $21.19 in the same value band. The fee schedule notes the permit valuation methodology is mandated by the State of Oregon in OAR 918-050-0100, and the fee schedule page adds a 12% State of Oregon surcharge on building, plumbing, electrical, and mechanical permits. See the official fee schedule for current amounts.
Where do you apply for a shed permit in Portland?
You can apply through the Portland permit portal or contact the Portland Permitting & Development directly. The links are listed on this page.
Can a homeowner pull a shed permit themselves in Portland?
Under Oregon law (ORS 701.010(7); ORS 701.325(1), (2), (3)): A homeowner may pull the permit and do the work. ORS 701.010(7) exempts from Construction Contractors Board licensing a person performing work on property that person owns, or on that person's own residence whether or not they own it, so no CCB license is needed to act as your own builder. That exemption does not cover someone working in the pursuit of an independent business with intent to offer the structure for sale. Oregon does require a signed disclosure at the counter: ORS 701.325(1) makes every city, county, or state permit office collect a written statement signed by the applicant, and an applicant claiming a licensing exemption must state the basis for it. ORS 701.325(2) requires the office to give the applicant the Information Notice to Property Owners About Construction Responsibilities and withhold the residential building permit until the applicant signs a statement, one option of which is that they are performing work on property they own or a residence they live in or will live in, and that any contractors they hire will be CCB licensed and properly endorsed. The Information Notice itself is a CCB rule form under ORS 701.325(3) covering payroll tax, workers' compensation, and liability and property damage insurance responsibilities. Confirm how Portland applies this before you apply.

From the Library

What else needs a permit in Portland

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsheight of the deck walking surface above adjacent grade, taken 36 inches out from the edge of the deckBuilding and Other Permits Fee Schedule for the City of Portland, effective July 10...
Electrical PermitIt dependsNot specifiedElectrical Permit Fee Schedule for the City of Portland, effective July 10, 2026.
Fence PermitIt dependswood and similar materials; 4 feet for masonry or concrete, 8 feet for woven wire or chain link, and any barrier around a swimming poolBuilding and Other Permits Fee Schedule for the City of Portland, effective July 10...
HVAC PermitPermit requiredNot specifiedMechanical Permit Fee Schedule for the City of Portland, effective July 10, 2026, One &...
Patio PermitIt dependsarea of an attached patio cover, porch cover, carport, or other open-sided roofed structureBuilding and Other Permits Fee Schedule for the City of Portland, effective July 10...
Plumbing PermitIt dependsNot specifiedPlumbing Permit Fee Schedule for the City of Portland, effective July 10, 2026.
Pool PermitIt dependsdepth of water in a structure used for swimming or recreational bathingBuilding and Other Permits Fee Schedule for the City of Portland, effective July 10...
Roof Replacement PermitIt dependsNot specifiedBuilding and Other Permits Fee Schedule for the City of Portland, effective July 10...
Solar PermitPermit requiredNot specifiedPortland Permitting & Development publishes solar permit fee estimates, noting 'The fees...

Shed Permit in other Oregon localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not Portland documents; the office above sets the local rules.

Verified by a person against the sources above on , not confirmed with Portland Permitting & Development. Rules change; confirm before you build. How we verify.