New York / New York City

Fence Permit in New York City, New York

It depends

Sometimes, depending on the project

Before erecting or altering a permanent fence taller than 6 feet at a one- or two-family dwelling, any permanent fence at other property types, or any temporary construction-site fence.

Confirmed on official page Verified New York City Department of Buildings (DOB)

By Mario Bailey, verified against official sources

Quick answer

These rules are New York City's own. The city is exempt from the New York State Uniform Fire Prevention and Building Code and enforces the NYC Construction Codes (Title 28 of the Administrative Code plus the NYC Building Code) across all five boroughs, so the same DOB rules apply in Manhattan, the Bronx, Brooklyn, Queens and Staten Island with no separate municipal building departments inside the city. For fences, 1 RCNY 101-14 Table 1 exempts fences 6 feet or less in height at one- and two-family dwellings, and NYC311 adds that homeowners may install that fencing themselves. For other property types or greater heights you must file a Plan/Work Approval Application (PW1), which under DOB's permit process must be submitted by a licensed Professional Engineer or Registered Architect. Zoning separately caps fence height (4 feet in R1 through R5 districts), and a fence exempt from a DOB permit still has to comply with zoning and with any Landmarks Preservation Commission requirement.

Typical threshold: fences accessory to one- and two-family dwellings, measured from the higher of the two adjoining grades.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?

When a permit is usually needed

Before erecting or altering a permanent fence taller than 6 feet at a one- or two-family dwelling, any permanent fence at other property types, or any temporary construction-site fence.

What a fence permit costs in New York City

Line item
fence permitBy formulaNo DOB filing fee where the fence is exempt. A fence that needs a permit is filed as an alteration on form PW1: Table 28-112.2 item 11 (Alteration work permit: One-, two- or three-family dwelling) sets an Alteration Type 2 or Type 3 minimum filing fee of $130.00 and an Alteration Type 1 minimum of $170.00, being the "Minimum filing fee for the first $5,000, or fraction thereof, of the cost of alteration; plus $2.60 for each $1,000, or fraction thereof, of cost of alterations in excess of $5,000." A temporary construction-site fence has its own line item: Table 28-112.2 item 36, "Construction Fence," $160.00 filing fee and $130.00 renewal.
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How New York City compares in New York

JurisdictionPermit needed?Threshold
BuffaloIt dependsfence forms part of an enclosure surrounding a swimming pool, or a pond over two feet deep
New York Citythis pageIt dependsfences accessory to one- and two-family dwellings, measured from the higher of the two adjoining grades
RochesterIt dependsheight of a fence, wall or retaining wall above average grade
Town of BrookhavenIt dependsfence taller than four feet in a secondary front yard on a corner lot or through lot
Town of HempsteadPermit requiredNot specified

Closest fence permit thresholds outside New York

Jurisdictions we cover whose limit sits nearest New York City's 6 feet in height.

How to apply in New York City

Most residential fences fall under the model code's 7-foot building-permit exemption, so the real approval step is a lightweight zoning or land-use permit built around a simple site plan showing the fence's location, height, and material, checked against setbacks and any corner-lot sight-triangle rule. A fence that will serve as a required swimming-pool barrier is the exception, since barrier fences carry life-safety requirements of their own.

What most fence permit applications include:

  • A fence 7 feet or under is exempt from the model code's building permit, the same threshold the IRC uses for other small projects (IRC 2021 R105.2).
  • That exemption only removes the building-code permit. It does not authorize skipping a jurisdiction's own zoning approval, which is why an exempt fence can still need its own land-use or zoning permit rather than a building permit (IRC 2021 R105.2).
  • Whatever your jurisdiction calls that approval, the application centers on a basic site plan: a drawing of the property showing the fence's location, height, and material, and how it relates to the property lines (common local zoning practice).
  • The same plan is checked against required setbacks and, on corner lots or near intersections, a sight-triangle rule that caps fence height so it does not block sightlines for drivers (common local zoning practice).
  • A fence that will serve as a required swimming-pool barrier is handled as life-safety work rather than the light zoning process, and at least one state's adopted residential code requires a building permit for barrier fences regardless of the general fence exemption (Oregon Residential Specialty Code 2021, R101.2.2).

General submittal guidance from International Residential Code (IRC), 2021 edition, Section R105.2. Source. New York City Department of Buildings (DOB) sets the exact checklist for New York City.

Where to apply in New York City:

New York City Department of Buildings (DOB)

  • 280 Broadway, New York, NY 10007
  • Phone: (212) 566-5000

Inspections and closing out your permit

Inspection follows the permit: a fence that never needed one gets no inspection at all under the model code, and a permitted fence typically gets a single final check rather than the staged inspections used for a house. The exception is a fence serving as a swimming-pool barrier, which gets its own dedicated barrier inspection covering height, gaps, and gate hardware.

  1. Inspection duty attaches only to work for which a permit is required, so a fence that qualified for the permit exemption carries no inspection obligation under the model code (IRC 2021 R109.1).
  2. Where a fence permit was issued, the process skips the staged foundation, frame, and rough-in inspections used for buildings and goes straight to one final inspection once the fence is finished (IRC 2021 R109.1.6).
  3. That single check is typically a zoning compliance inspection rather than a structural review, confirming the fence matches the approved height and site plan (common local practice).
  4. A fence built as a swimming-pool barrier breaks that light-touch pattern: it is separately inspected for barrier compliance, commonly required before the pool itself can be signed off (ISPSC 305; local pool-barrier inspection programs).
  5. That barrier inspection checks dimensional rules from the swimming pool and spa code rather than ordinary fence rules, including the minimum 48 inch barrier height and limits on openings and gaps a young child could pass through (ISPSC 305).
  6. Gate hardware is inspected too: a self-closing, self-latching gate is part of the barrier requirement, since an unlatched gate defeats the fence's purpose as a barrier (ISPSC 305).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the New York City permit portal or by phone at (212) 566-5000.

Inspection sequence from International Residential Code (IRC), 2021 edition, Section R109, and ISPSC 2021 Section 305 (barriers). Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need a fence permit in New York City?
These rules are New York City's own. The city is exempt from the New York State Uniform Fire Prevention and Building Code and enforces the NYC Construction Codes (Title 28 of the Administrative Code plus the NYC Building Code) across all five boroughs, so the same DOB rules apply in Manhattan, the Bronx, Brooklyn, Queens and Staten Island with no separate municipal building departments inside the city. For fences, 1 RCNY 101-14 Table 1 exempts fences 6 feet or less in height at one- and two-family dwellings, and NYC311 adds that homeowners may install that fencing themselves. For other property types or greater heights you must file a Plan/Work Approval Application (PW1), which under DOB's permit process must be submitted by a licensed Professional Engineer or Registered Architect. Zoning separately caps fence height (4 feet in R1 through R5 districts), and a fence exempt from a DOB permit still has to comply with zoning and with any Landmarks Preservation Commission requirement. Fences accessory to one- and two-family dwellings, measured from the higher of the two adjoining grades. Always confirm with the office before starting.
How much does a fence permit cost in New York City?
No DOB filing fee where the fence is exempt. A fence that needs a permit is filed as an alteration on form PW1: Table 28-112.2 item 11 (Alteration work permit: One-, two- or three-family dwelling) sets an Alteration Type 2 or Type 3 minimum filing fee of $130.00 and an Alteration Type 1 minimum of $170.00, being the "Minimum filing fee for the first $5,000, or fraction thereof, of the cost of alteration; plus $2.60 for each $1,000, or fraction thereof, of cost of alterations in excess of $5,000." A temporary construction-site fence has its own line item: Table 28-112.2 item 36, "Construction Fence," $160.00 filing fee and $130.00 renewal. See the official fee schedule for current amounts.
Where do you apply for a fence permit in New York City?
You can apply through the New York City permit portal or contact the New York City Department of Buildings (DOB) directly. The links are listed on this page.
Can a homeowner pull a fence permit themselves in New York City?
Under New York law (Inside New York City: NYC Admin. Code 28-104.1, 28-105.1, 28-105.4, 28-105.5.1, 28-401.3 (definition of "general contractor"). Outside New York City: N.Y. Exec. Law 381(2); 19 NYCRR 1203.3(a)(1).): New York State sets no owner-builder rule at all outside New York City. Executive Law 381(2) puts administration and enforcement in the hands of each local government, and 19 NYCRR 1203.3(a)(1) only requires each authority having jurisdiction to make building permits mandatory for work that must conform to the codes, leaving who may apply to local law. The state licenses no general contractors and imposes no owner-builder affidavit, disclosure form or post-permit sale restriction of the kind Florida uses, so whether a homeowner may pull the permit is a question for the specific city, town, village or county. New York City is the genuine outlier. Administrative Code 28-105.1 makes the work itself unlawful without a written permit, and Administrative Code 28-104.1 bars the department from issuing that permit until it approves the required construction documents, which must be prepared by or under the supervision of a registered design professional, meaning a licensed architect or engineer, as required by the code. A homeowner therefore cannot self-prepare and file the plans for permit-requiring work in New York City even though Administrative Code 28-105.5.1 defines the permit applicant as the person who performs the work or retains a subcontractor, and even though the general contractor registration definition in Administrative Code 28-401.3 expressly excludes an individual who constructs a residential structure of no more than three dwelling units for his or her own occupancy. Note that Administrative Code 28-105.4 exempts minor alterations and ordinary repairs from the permit requirement entirely, so the design professional bottleneck applies only to work that needs a permit in the first place. Confirm how New York City applies this before you apply.

From the Library

What else needs a permit in New York City

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredNot specifiedFiled as an alteration on form PW1.
Electrical PermitIt dependsNot specifiedTable 28-112.2 item 16, "Permit for electrical work," is "As provided by department...
HVAC PermitIt dependspackaged air-conditioning units installed in an existing one- or two-family dwelling that are not part of an alteration otherwise requiring a permit; the same exemption is capped at 3 tons in all other buildingsNo DOB filing fee where the unit fits the 1 RCNY 101-14 exemption.
Plumbing PermitIt dependsdirect replacement of an existing fixture or faucet that does not alter the hot and cold shutoff valves or the fixture trapLimited Alteration Application is the usual homeowner-scale route.
Pool PermitIt dependsoutdoor in-ground or above-ground pools accessory to a one- or two-family dwelling, where the distance from the edge of an in-ground pool to any building or lot line exceeds the depth of the deepest part of the pool and a slop sink for indirect waste already exists or is installed under a plumbing permitNo DOB filing fee for a pool that meets the 1 RCNY 101-14 Table 1 exemption, though a...
Roof Replacement PermitIt dependsthe permit requirement turns on whether the roof deck or sheathing is replaced, and on whether the NYC Energy Conservation Code calls for additional thermal insulationNo DOB filing fee for reroofing that stays above the deck.
Shed PermitIt dependstemporary portable freestanding sheds accessory to a one- or two-family dwelling that are also no more than 7 feet 6 inches high, at least 3 feet from every lot line, used for household storage, do not obstruct a required window, and are the only such shed on the tax lotNo DOB filing fee where the shed meets every condition in 1 RCNY 101-14 Table 1.
Solar PermitIt dependssolar landscape lights are the only solar work DOB exempts from permitSolar Panels is work type SL, an alteration priced on construction cost and requiring a...

Fence Permit in other New York localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not New York City documents; the office above sets the local rules.

Verified by a person against the sources above on , not confirmed with New York City Department of Buildings (DOB). Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Compare Fence Permit requirements across New York localities

It depends
Get quotes