New York

Building permits in New York City, New York

Of the 9 common home projects we have verified in New York City, 1 needs a permit outright and 8 depend on size or scope. Click any project for the full rule, fee, and how to apply.

Project types verified
9of 10 we cover in New York City

New York City Department of Buildings (DOB)

Look up a permit in New York City

New York City runs an online permit portal. We have not confirmed what its record search covers.

Open the New York City permit portal

What needs a permit in New York City

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredAny sizeSee schedule
Electrical PermitIt dependsBefore any new installation, alteration or repair of electric wires, wiring apparatus...See schedule
Fence PermitIt dependsfences accessory to one- and two-family dwellings, measured from the higher of the two adjoining gradesSee schedule
HVAC PermitIt dependspackaged air-conditioning units installed in an existing one- or two-family dwelling that are not part of an alteration otherwise requiring a permit; the same exemption is capped at 3 tons in all other buildingsSee schedule
Patio PermitNot confirmedNot confirmedNot published
Plumbing PermitIt dependsdirect replacement of an existing fixture or faucet that does not alter the hot and cold shutoff valves or the fixture trapTable 28-112.2 item 11 sets the one-, two- or three-family LAA minimum filing fee at $130.00; the schedule has the rest
Pool PermitIt dependsoutdoor in-ground or above-ground pools accessory to a one- or two-family dwelling, where the distance from the edge of an in-ground pool to any building or lot line exceeds the depth of the deepest part of the pool and a slop sink for indirect waste already exists or is installed under a plumbing permitSee schedule
Roof Replacement PermitIt dependsthe permit requirement turns on whether the roof deck or sheathing is replaced, and on whether the NYC Energy Conservation Code calls for additional thermal insulationSee schedule
Shed PermitIt dependstemporary portable freestanding sheds accessory to a one- or two-family dwelling that are also no more than 7 feet 6 inches high, at least 3 feet from every lot line, used for household storage, do not obstruct a required window, and are the only such shed on the tax lotSee schedule
Solar PermitIt dependssolar landscape lights are the only solar work DOB exempts from permitSee schedule

What you can build in New York City

Planning a project in New York City?

Hire it out

Sponsored

Licensed contractors usually pull the permit as part of the job. Comparing a few local quotes before you commit is the useful next step.

Compare local contractor quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

Planning several things at once? Check your whole project

New York City permit fees compared with nearby New York localities

New York locality Deck PermitHVAC PermitElectrical Permit
New York City See schedule See schedule See schedule
Buffalo See schedule Heating permit application: $50.00 application fee; the schedule has the rest Electrical permit application: $50.00 application fee for all permits; the schedule has the rest
Rochester Deck Fees, published on the city's building permit fees page: "Deck up to 144 sq. ft." $75.00; the schedule has the rest See schedule See schedule
Town of Brookhaven Town of Brookhaven Building Division Fee Schedule 2026, Construction table: "Deck Fee $0.50/SF" See schedule It does list an "Electrical Transfer Switch Fee" of $90 for the first $1,000 of construction costs; the schedule has the rest

Each cell is taken from that New York jurisdiction's own fee schedule; the full wording and source sit on each permit page.

New York City penalty for work started without a permit

New York City publishes what it charges when work begins before the permit, quoted here from the schedule or permit page we verified.

The New York statute, the after-the-fact permit path and who may pull the permit: building without a permit in New York.

New York City permit questions, answered from the data

Do you need a permit in New York City?
It depends on the project. Of the 10 permit types we cover in New York City, 1 always requires a permit (for example a deck permit) and 8 depend on size or scope (an electrical permit, for instance), and 1 is not confirmed. Each New York City permit type's page states the exact rule and its source.
How much does a permit cost in New York City?
New York City publishes a fee for 9 of the 10 permit types we cover, each quoted on its page from the jurisdiction's own schedule (linked on every page that carries one). Fees are set by New York City Department of Buildings (DOB); we do not estimate or mark them up.
Where do you apply for a permit in New York City?
New York City Department of Buildings (DOB) issues permits in New York City and has an online permit portal, and takes questions at (212) 566-5000. The New York City official page and portal are linked in the office section above.
What is the penalty for building without a permit in New York City?
New York City publishes its own charge for work started before the permit: The matching 1 and 2 family penalty for filing after the fact starts at $780.00. That is the local bill; the New York statute, the after-the-fact permit path and who may pull the permit are on the New York building-without-a-permit page.

How the New York City pages were verified. 10 permit types, 6 distinct official sources, most recently checked . Every rule is read from New York City Department of Buildings (DOB) or the applicable code and cited on its page; anything we could not confirm for New York City is marked rather than estimated. How we verify.

From the Library

Other permit offices in New York