Building permits in Town of Brookhaven, New York
Of the 10 common home projects we have verified in Town of Brookhaven, 2 need a permit outright and 8 depend on size or scope. Click any project for the full rule, fee, and how to apply.
- Project types verified
- 10in Town of Brookhaven
Look up a permit in Town of Brookhaven
Town of Brookhaven runs an online permit portal. We have not confirmed what its record search covers.
How to get a building permit in Town of Brookhaven
The Town of Brookhaven Building Division, at 1 Independence Hill in Farmingville, issues building construction permits for the town; sheds, decks, pools and fences all go through it. Its Digital Services Portal takes the application, the plans and the payment, and shows where the record stands.
Where the office is and when it is open
The Building Division is at 1 Independence Hill, Farmingville, NY 11738, open Monday to Friday, 9:00 to 3:30 pm. Call 631-451-8696, or use the Building Division assistance form linked from the Building Division page for portal and application questions.
Applying online in the Town of Brookhaven
- Create an account on the Digital Services Portal as an Individual (or a Company), then click the verification link in the email from Info@infor.com and log in to finish activating it.
- Choose “Submit an Application/Complaint” from the top menu and pick the Building Construction application.
- Upload what the town’s Application Documents and Requirements list asks for. Most jobs need the property’s existing Certificates of Occupancy, Compliance, Existing Use and Zoning Compliance; a current survey signed and stamped by a surveyor and dated within one year, with the proposed structure drawn on it (by hand is fine); and construction plans. Roof overs, gazebos and pergolas also need an itemized professional cost estimate.
- Prove insurance: as a homeowner doing the work, upload a CE-200 Exemption Certificate; a contractor uploads both workers’ compensation and disability insurance forms. If someone other than the owner applies, add the Agent Authorization Affidavit.
- After the town’s preliminary review, you get an email that fees are due; pay in the portal. The town never asks for payment by wire transfer, so treat any such request as fraud.
- Respond to review requests, obtain any other agency approvals, pay the remaining permit fees, and the permit issues. An application stays open up to 24 months; an issued permit is generally valid for 365 days.
What five common projects cost here
From the Building Division Fee Schedule 2026. The Construction table opens with a $100 Application Fee but does not say how it combines with each permit line; the portal’s fee notice lists what applies to your record.
- Shed: needed only for a shed over 144 square feet or outside a conforming location; Shed Fee $200. Read 18 Nov 2026.
- Fence: Fence Fee $1/LF (per linear foot of fence). Read 18 Nov 2026.
- Deck: Deck Fee $0.50/SF (per square foot of deck). Read 18 Nov 2026.
- Pool: Inground Pool Fee $260; Above Ground Pool / Hot Tub Fee $135. Read 18 Nov 2026.
- Roof replacement: the schedule has no line named roof replacement, but both lines that could cover one, the Roof Over Fee and the Alteration Repair Fee, use the same formula: $90 for the first $1,000 of construction costs plus $10 for every additional $1,000. Read 18 Nov 2026.
The town also lists an optional Accelerated Review Fee of $715.
How long review takes
Brookhaven sets no published review deadline; besides the $715 accelerated option, the only clock it states is the 24-month life of an unissued application. The Contact Us button on your portal record reaches the staff handling it.
Inspections, in order
Town Code Chapter 16 puts the timing on you: permitted work must stay exposed until inspected and accepted, and you must notify the town when work is ready for inspection. Work that fails stays exposed until it is fixed and reinspected; each reinspection is $50. A pool cannot be filled until its barrier is up, and the code requires a temporary fence while an in-ground pool is under construction. After the final inspection passes, the town emails the documents it still needs before the Certificate of Occupancy or Compliance, such as a final survey for exterior work and an Electrical Certificate for new wiring.
Why applications get sent back
The town warns that incomplete applications delay review and that electronic plans not meeting its standards may be returned for correction. Its plan standards ask for numbered sheets with PDF bookmarks and supporting documents uploaded separately from drawings. Projects needing a zoning variance need the BZA grant letter.
What needs no permit in the Town of Brookhaven
For one- and two-family homes, in a conforming location:
- A one-story tool or storage shed of 144 square feet or less.
- Decks, patios and walkways not above grade greater than eight inches at any point.
- Gazebos of 144 square feet or less with walls no higher than 36 inches.
- Minor repairs to existing plumbing; painting, wallpapering, tiling and carpeting; repairs that do not touch the structure, the means of egress or fire protection.
If the work already started
The fee schedule’s line for an improvement already built, the Penalty - Existing Improvement Fee, is 2x per permit fee. Chapter 16 also allows a civil penalty of up to $125 for each day a violation continues. What New York law says about building without a permit.
Checklist before you apply
- The property’s existing certificates (Occupancy, Compliance, Existing Use, Zoning Compliance).
- A Digital Services Portal account, verified by email.
- A surveyor’s survey dated within one year, with the new work drawn on it.
- A CE-200 Exemption Certificate, or your contractor’s workers’ compensation and disability insurance forms.
- Plans as bookmarked PDFs with numbered sheets.
- An Agent Authorization Affidavit if you are not the owner.
- Payment through the portal only.
Town of Brookhaven documents read for this guide
- Office page: Building Division, read
- Office page: Building Construction, read
- Application: Forms: Application Documents and Requirements, read
- Permit portal: Digital Services Portal Training Guide, read
- Fee schedule: Building Division Fee Schedule 2026, read
- Office page: Town Code Chapter 16: Building Construction Administration, read
- Office page: Town Code Chapter 85, Article II: Building Permits and Certificates of Occupancy, read
What needs a permit in Town of Brookhaven
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | deck rising more than eight inches above grade at any point | Town of Brookhaven Building Division Fee Schedule 2026, Construction table: "Deck Fee $0.50/SF" |
| Electrical Permit | Permit required | Any size | It does list an "Electrical Transfer Switch Fee" of $90 for the first $1,000 of construction costs; the schedule has the rest |
| Fence Permit | It depends | fence taller than four feet in a secondary front yard on a corner lot or through lot | Town of Brookhaven Building Division Fee Schedule 2026, Construction table: "Fence Fee $1/LF" |
| HVAC Permit | It depends | installation of listed portable heating, ventilation or cooling equipment or appliances | Town of Brookhaven Building Division Fee Schedule 2026, Construction table: "CAC/HVAC Fee $160" and "Heating Unit Replacement Fee $135" |
| Patio Permit | It depends | patio rising more than eight inches above grade at any point | The same table opens with "Application Fee $100" |
| Plumbing Permit | It depends | minor repairs to existing plumbing systems | See schedule |
| Pool Permit | It depends | pool structure extending more than 18 inches below grade, measuring how far the pool sits below grade and not the depth of the water, which is the code's test for an in-ground pool | Town of Brookhaven Building Division Fee Schedule 2026, Construction table: "Inground Pool Fee $260" and "Above Ground Pool / Hot Tub Fee $135" |
| Roof Replacement Permit | It depends | repair work that has no impact on fire and life safety, meaning no impact on the structural system, the required means of egress, or the fire protection system | It lists a "Roof Over Fee" of $90 for the first $1,000 of construction costs, plus $10 for every additional $1,000 thereafter; the schedule has the rest |
| Shed Permit | It depends | detached one-story storage shed larger than 144 square feet, or any shed not located in the rear yard | Town of Brookhaven Building Division Fee Schedule 2026, Construction table: "Shed Fee $200" |
| Solar Permit | Permit required | Any size | Town of Brookhaven Building Division Fee Schedule 2026, Construction table: "Solar Panel (Residential) $135" |
What you can build in Town of Brookhaven
- Shed size, height and setback rules in Town of Brookhaven (8 rules, each quoted from an official Town of Brookhaven source)
- Fence size, height and setback rules in Town of Brookhaven (6 rules, each quoted from an official Town of Brookhaven source)
- Deck size, height and setback rules in Town of Brookhaven (2 rules, each quoted from an official Town of Brookhaven source)
- Pool size, height and setback rules in Town of Brookhaven (7 rules, each quoted from an official Town of Brookhaven source)
Planning a project in Town of Brookhaven?
Hire it out
Sponsored
Licensed contractors usually pull the permit as part of the job. Comparing a few local quotes before you commit is the useful next step.
Compare local contractor quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
Planning several things at once? Check your whole project
Town of Brookhaven permit fees compared with nearby New York localities
| New York locality | Deck Permit | HVAC Permit | Electrical Permit |
|---|---|---|---|
| Town of Brookhaven | Town of Brookhaven Building Division Fee Schedule 2026, Construction table: "Deck Fee $0.50/SF" | See schedule | It does list an "Electrical Transfer Switch Fee" of $90 for the first $1,000 of construction costs; the schedule has the rest |
| Buffalo | See schedule | Heating permit application: $50.00 application fee; the schedule has the rest | Electrical permit application: $50.00 application fee for all permits; the schedule has the rest |
| New York City | See schedule | See schedule | See schedule |
| Rochester | Deck Fees, published on the city's building permit fees page: "Deck up to 144 sq. ft." $75.00; the schedule has the rest | See schedule | See schedule |
Each cell is taken from that New York jurisdiction's own fee schedule; the full wording and source sit on each permit page.
Town of Brookhaven permit questions, answered from the data
- Do you need a permit in Town of Brookhaven?
- It depends on the project. Of the 10 permit types we cover in Town of Brookhaven, 2 always require a permit (for example an electrical permit) and 8 depend on size or scope (a deck permit, for instance). Each Town of Brookhaven permit type's page states the exact rule and its source.
- How much does a permit cost in Town of Brookhaven?
- Town of Brookhaven publishes a fee for 10 of the 10 permit types we cover, each quoted on its page from the jurisdiction's own schedule (linked on every page that carries one). Fees are set by Town of Brookhaven Division of Building (Building Division), Department of Planning, Environment and Land Management; we do not estimate or mark them up.
- Where do you apply for a permit in Town of Brookhaven?
- Town of Brookhaven Division of Building (Building Division), Department of Planning, Environment and Land Management issues permits in Town of Brookhaven and has an online permit portal, and takes questions at 631-451-8696. The Town of Brookhaven official page and portal are linked in the office section above.
How the Town of Brookhaven pages were verified. 10 permit types, 9 distinct official sources, most recently checked . Every rule is read from Town of Brookhaven Division of Building (Building Division), Department of Planning, Environment and Land Management or the applicable code and cited on its page; anything we could not confirm for Town of Brookhaven is marked rather than estimated. How we verify.
Permitting activity in Town of Brookhaven
In 2025, Town of Brookhaven authorized permits for 286 new residential housing units (266 single-family, 20 in multi-family buildings), valued at $94M , down from 514 the year before. That works out to about 0.6 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 479,883.