New York / Town of Brookhaven

Shed Permit in Town of Brookhaven, New York

It depends

Sometimes, depending on the project

Before building or installing a shed larger than 144 square feet, or any shed placed outside the rear yard.

Confirmed on official page Verified Town of Brookhaven Division of Building (Building Division), Department of Planning, Environment and Land Management

By Mario Bailey, verified against official sources

Quick answer

A detached one-story storage shed of 144 square feet or less sitting in the rear yard needs no building permit in Brookhaven. Anything larger, or any shed placed in a side or front yard, does need one. The exemption appears twice in the town code: Sec. 16-3.A(1) exempts one-story detached tool and storage sheds up to 144 square feet in a conforming location, and Zoning Sec. 85-12.B(1) repeats the 144 square foot cap for sheds accessory to one- and two-family dwellings.

Typical threshold: detached one-story storage shed larger than 144 square feet, or any shed not located in the rear yard.

Diagram of the 144 sq ft footprint area threshold for a shed permit in Town of Brookhaven, New York
Threshold illustrated: 144 sq ft. Whether Town of Brookhaven requires a permit above or below this measurement is stated in the verdict on this page, verified 2026-08-15.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?

When a permit is usually needed

Before building or installing a shed larger than 144 square feet, or any shed placed outside the rear yard.

What a shed permit costs in Town of Brookhaven

Line item
shed permitBy formulaNo Building Division fee schedule is published. Town Code Sec. 16-7 provides that the fee schedule is set by Town Board resolution. Permit fees are payable by check or money order only to the Town of Brookhaven.

How Town of Brookhaven compares in New York

Across the New York jurisdictions we have verified, the same threshold runs from 120 to 144, so a project that is exempt here may still need a permit one county over.

JurisdictionPermit needed?Threshold
BuffaloIt dependsgross floor area of a one story detached tool or storage shed, playhouse or similar accessory building at a one- or two-family dwelling or townhouse
New York CityIt dependstemporary portable freestanding sheds accessory to a one- or two-family dwelling that are also no more than 7 feet 6 inches high, at least 3 feet from every lot line, used for household storage, do not obstruct a required window, and are the only such shed on the tax lot
RochesterIt dependsgross floor area of a one-story detached storage shed accessory to a one- or two-family dwelling
Town of Brookhaventhis pageIt dependsdetached one-story storage shed larger than 144 square feet, or any shed not located in the rear yard
Town of HempsteadPermit requiredNot specified

Closest shed permit thresholds outside New York

Jurisdictions we cover whose limit sits nearest Town of Brookhaven's 144 sq ft.

  • Alachua County, Florida, area of a single storage shed, exemption available once per property
  • Chicago, Illinois, single-story detached tool or storage shed under 150 sq ft and not more than 15 ft tall with no plumbing does not require a permit
  • Hillsborough County, Florida, sheds under 150 sq ft are exempt; 150 sq ft or larger require a building permit
  • Madison, Wisconsin, shed or accessory building floor area; heated sheds and sheds within ten feet of dwelling units on the property need a permit at any size

How to apply in Town of Brookhaven

A residential shed permit application, once the shed is large enough to require one, is a set of construction documents that show what will be built and prove it meets the adopted residential code. In practice that means a written permit application, a scaled site plan locating the shed and its distances to the property lines, and construction documents covering the shed's foundation or anchoring system and its framing.

What most shed permit applications include:

  • A written permit application identifying the proposed work and describing the property by its address or legal description, filed with the building department before construction begins (IRC R105.3).
  • A scaled site plan showing the shed's size and location and its dimensioned distances to all property lines so required setbacks can be verified before the permit is issued (IRC R106.2).
  • Construction documents showing the shed's foundation: freestanding accessory structures at or under the code's small-structure size and eave-height limits (600 square feet and a 10 foot eave height in the model code) are exempt from continuous footings but must still be shown supported on undisturbed soil or engineered fill and anchored to resist wind-induced uplift and overturning (IRC R403.1).
  • Where the shed does sit on a continuous foundation with a wood sill plate, anchor bolt or approved strap details tying the sill plate to the foundation (IRC R403.1.6).
  • Roof framing details showing the rafter-to-wall or truss-to-wall connections, since even a shed exempt from continuous footings must be anchored to resist wind-induced uplift and overturning (IRC R403.1; R802.11).

General submittal guidance from IRC R105.3 (permit application), R106.2 (site plan), R403.1 (footings and anchorage for accessory structures), and R403.1.6 (sill anchorage), 2021 IRC. Source. Town of Brookhaven Division of Building (Building Division), Department of Planning, Environment and Land Management sets the exact checklist for Town of Brookhaven.

Where to apply in Town of Brookhaven:

Town of Brookhaven Division of Building (Building Division), Department of Planning, Environment and Land Management

  • 1 Independence Hill, Farmingville, NY 11738
  • Phone: 631-451-6333

Inspections and closing out your permit

A permitted shed is inspected in stages as it goes up: the foundation or the anchors that hold it down before they are covered, the framing before it is enclosed, and a final inspection once the shed is finished. Each stage checks the items that would be hidden or unsafe if skipped.

  1. Foundation or anchor inspection: called after any required footings, piers, or ground anchors are set and any forms or reinforcing steel are in place, but before concrete is placed, so the foundation or anchoring system can be verified before it is covered (IRC R109.1.1).
  2. Frame inspection: after the shed is framed, sheathed, and braced, the inspector checks the framing, bracing, fasteners, and the roof connections that resist wind uplift, before those elements are covered (IRC R109.1.4 frame inspection; R403.1 anchorage).
  3. Final inspection: made after the permitted work is complete and before the shed is used; work may not proceed past any inspection stage without the building official's approval (IRC R109.1.6 final inspection; R109.4 approval required).
  4. For a pre-fabricated or kit shed, the manufacturer's installation instructions must be on site at the time of inspection so the inspector can confirm the anchoring and assembly match the design (IRC R106.1.2).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Town of Brookhaven permit portal or by phone at 631-451-6333.

Inspection sequence from IRC R109.1.1 (foundation inspection), R109.1.4 (frame inspection), R109.1.6 (final inspection), and R106.1.2 (manufacturer's instructions on site), 2021 IRC. Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need a shed permit in Town of Brookhaven?
A detached one-story storage shed of 144 square feet or less sitting in the rear yard needs no building permit in Brookhaven. Anything larger, or any shed placed in a side or front yard, does need one. The exemption appears twice in the town code: Sec. 16-3.A(1) exempts one-story detached tool and storage sheds up to 144 square feet in a conforming location, and Zoning Sec. 85-12.B(1) repeats the 144 square foot cap for sheds accessory to one- and two-family dwellings. Detached one-story storage shed larger than 144 square feet, or any shed not located in the rear yard. Always confirm with the office before starting.
How much does a shed permit cost in Town of Brookhaven?
No Building Division fee schedule is published. Town Code Sec. 16-7 provides that the fee schedule is set by Town Board resolution. Permit fees are payable by check or money order only to the Town of Brookhaven. Contact the office for current amounts.
Where do you apply for a shed permit in Town of Brookhaven?
You can apply through the Town of Brookhaven permit portal or contact the Town of Brookhaven Division of Building (Building Division), Department of Planning, Environment and Land Management directly. The links are listed on this page.
Can a homeowner pull a shed permit themselves in Town of Brookhaven?
Under New York law (Inside New York City: NYC Admin. Code 28-104.1, 28-105.1, 28-105.4, 28-105.5.1, 28-401.3 (definition of "general contractor"). Outside New York City: N.Y. Exec. Law 381(2); 19 NYCRR 1203.3(a)(1).): New York State sets no owner-builder rule at all outside New York City. Executive Law 381(2) puts administration and enforcement in the hands of each local government, and 19 NYCRR 1203.3(a)(1) only requires each authority having jurisdiction to make building permits mandatory for work that must conform to the codes, leaving who may apply to local law. The state licenses no general contractors and imposes no owner-builder affidavit, disclosure form or post-permit sale restriction of the kind Florida uses, so whether a homeowner may pull the permit is a question for the specific city, town, village or county. New York City is the genuine outlier. Administrative Code 28-105.1 makes the work itself unlawful without a written permit, and Administrative Code 28-104.1 bars the department from issuing that permit until it approves the required construction documents, which must be prepared by or under the supervision of a registered design professional, meaning a licensed architect or engineer, as required by the code. A homeowner therefore cannot self-prepare and file the plans for permit-requiring work in New York City even though Administrative Code 28-105.5.1 defines the permit applicant as the person who performs the work or retains a subcontractor, and even though the general contractor registration definition in Administrative Code 28-401.3 expressly excludes an individual who constructs a residential structure of no more than three dwelling units for his or her own occupancy. Note that Administrative Code 28-105.4 exempts minor alterations and ordinary repairs from the permit requirement entirely, so the design professional bottleneck applies only to work that needs a permit in the first place. Confirm how Town of Brookhaven applies this before you apply.

From the Library

What else needs a permit in Town of Brookhaven

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsdeck rising more than eight inches above grade at any pointNo Building Division fee schedule is published.
Electrical PermitPermit requiredNot specifiedThe Town of Brookhaven does not charge a separate electrical permit fee
Fence PermitIt dependsfence taller than four feet in a secondary front yard on a corner lot or through lotBrookhaven publishes no Building Division fee schedule.
HVAC PermitIt dependsinstallation of listed portable heating, ventilation or cooling equipment or appliancesNo Building Division fee schedule is published.
Patio PermitIt dependspatio rising more than eight inches above grade at any pointNo Building Division fee schedule is published.
Plumbing PermitIt dependsminor repairs to existing plumbing systemsNo Building Division fee schedule is published.
Pool PermitIt dependspool structure extending more than 18 inches below grade, measuring how far the pool sits below grade and not the depth of the water, which is the code's test for an in-ground poolNo Building Division fee schedule is published.
Roof Replacement PermitIt dependsrepair work that has no impact on fire and life safety, meaning no impact on the structural system, the required means of egress, or the fire protection systemNo Building Division fee schedule is published.
Solar PermitPermit requiredNot specifiedNo Building Division fee schedule is published.

Shed Permit in other New York localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not Town of Brookhaven documents; the office above sets the local rules.

Verified by a person against the sources above on , not confirmed with Town of Brookhaven Division of Building (Building Division), Department of Planning, Environment and Land Management. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Compare Shed Permit requirements across New York localities

It depends
Get quotes