New York / Town of Brookhaven

Deck Permit in Town of Brookhaven, New York

It depends

Sometimes, depending on the project

Before building any deck that is more than eight inches above grade at any point.

Quick answer

The Building Division's own Zoning Setbacks sheet states that decks 8 inches or less in height above grade in a conforming location do not require a building permit. Anything that rises higher than that needs one, and the Building Division FAQ lists decks and porches among the accessory structures that need a permit. Zoning Sec. 85-12.B says the same thing in the code's words, exempting decks, patios and walkways not above grade greater than eight inches at any point, constructed of any material, when accessory to one- and two-family dwellings and in a conforming location. Deck is also named in the town's list of residential permit types accepted through the online application.

Diagram of the 8 in above grade deck height above grade threshold for a deck permit in Town of Brookhaven, New York
Threshold illustrated: 8 in above grade. Whether Town of Brookhaven requires a permit above or below this measurement is stated in the verdict on this page, verified 2026-08-15.
Typical threshold
deck rising more than eight inches above grade at any point
Issued by
Town of Brookhaven Division of Building (Building Division), Department of Planning, Environment and Land Management
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

If a contractor builds your deck, they usually handle the permit as part of the job. Compare a few bids before you commit.

Compare deck contractor quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

Deck size, height and setback rules in Town of Brookhaven

Setback
An unenclosed ground-level or first-story deck may extend into the required side or rear yard as long as it stays within the district's minimum setback from any lot line under § 85-177, and no more than 6 feet into the required front yard; it may never come closer than 24 feet to the primary front lot line or 10 feet to a secondary front lot line. ecode360.com document
Setback
Any part of a deck more than 6 feet above the surrounding ground must be at least 15 feet from a side or rear property line, or farther where the district's minimum setback from any lot line under § 85-177 is greater than 15 feet. ecode360.com document

What a deck permit costs in Town of Brookhaven

Fee schedule in force
Official scheduleRead .
Published in
Town of Brookhaven Building Division Fee Schedule 2026, Construction table:
  • "Deck Fee $0.50/SF".
  • The same table opens with "Application Fee $100";
  • the schedule does not say whether it is added to each permit.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Town of Brookhaven compares in New York

JurisdictionPermit needed?Threshold
BuffaloPermit requiredAny size
New York CityPermit requiredAny size
RochesterIt dependsheight of the deck surface above grade
Town of Brookhaventhis pageIt dependsdeck rising more than eight inches above grade at any point
Town of HempsteadPermit requiredAny size

How to apply in Town of Brookhaven

General guide, not specific to this office

What a deck permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a deck permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

Town of Brookhaven Division of Building (Building Division), Department of Planning, Environment and Land Management

  • 1 Independence Hill, Farmingville, NY 11738
  • Phone: 631-451-8696

Permitting activity in Town of Brookhaven

In 2025, Town of Brookhaven authorized permits for 286 new residential housing units (266 single-family, 20 in multi-family buildings), valued at $94M, down from 514 the year before. That works out to about 0.6 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 479,883.

What else needs a permit in Town of Brookhaven

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Electrical PermitPermit requiredAny sizeIt does list an "Electrical Transfer Switch Fee" of $90 for the first $1,000 of construction costs; the schedule has the rest
Fence PermitIt dependsfence taller than four feet in a secondary front yard on a corner lot or through lotTown of Brookhaven Building Division Fee Schedule 2026, Construction table: "Fence Fee $1/LF"
HVAC PermitIt dependsinstallation of listed portable heating, ventilation or cooling equipment or appliancesTown of Brookhaven Building Division Fee Schedule 2026, Construction table: "CAC/HVAC Fee $160" and "Heating Unit Replacement Fee $135"
Patio PermitIt dependspatio rising more than eight inches above grade at any pointThe same table opens with "Application Fee $100"
Plumbing PermitIt dependsminor repairs to existing plumbing systemsSee schedule
Pool PermitIt dependspool structure extending more than 18 inches below grade, measuring how far the pool sits below grade and not the depth of the water, which is the code's test for an in-ground poolTown of Brookhaven Building Division Fee Schedule 2026, Construction table: "Inground Pool Fee $260" and "Above Ground Pool / Hot Tub Fee $135"
Roof Replacement PermitIt dependsrepair work that has no impact on fire and life safety, meaning no impact on the structural system, the required means of egress, or the fire protection systemIt lists a "Roof Over Fee" of $90 for the first $1,000 of construction costs, plus $10 for every additional $1,000 thereafter; the schedule has the rest
Shed PermitIt dependsdetached one-story storage shed larger than 144 square feet, or any shed not located in the rear yardTown of Brookhaven Building Division Fee Schedule 2026, Construction table: "Shed Fee $200"
Solar PermitPermit requiredAny sizeTown of Brookhaven Building Division Fee Schedule 2026, Construction table: "Solar Panel (Residential) $135"

Frequently asked questions

Do you need a deck permit in Town of Brookhaven?
It depends on the project. Deck rising more than eight inches above grade at any point. If you are unsure how that applies to your project, call the permit office at 631-451-8696 before you start.
How much does a deck permit cost in Town of Brookhaven?
The fee wording from the official schedule is in the cost table on this page, as we read it on 11 Nov 2026. For the figure on your own project, call the permit office at 631-451-8696.
Where do you apply for a deck permit in Town of Brookhaven?
You can apply through the Town of Brookhaven permit portal or contact the Town of Brookhaven Division of Building (Building Division), Department of Planning, Environment and Land Management directly. The links are listed on this page.
Can a homeowner pull a deck permit themselves in Town of Brookhaven?
Under New York law (Inside New York City: NYC Admin. Code 28-104.1, 28-105.1, 28-105.4, 28-105.5.1, 28-401.3 (definition of "general contractor"). Outside New York City: N.Y. Exec. Law 381(2); 19 NYCRR 1203.3(a)(1).): New York State sets no owner-builder rule at all outside New York City. Executive Law 381(2) puts administration and enforcement in the hands of each local government, and 19 NYCRR 1203.3(a)(1) only requires each authority having jurisdiction to make building permits mandatory for work that must conform to the codes, leaving who may apply to local law. The state licenses no general contractors and imposes no owner-builder affidavit, disclosure form or post-permit sale restriction of the kind Florida uses, so whether a homeowner may pull the permit is a question for the specific city, town, village or county. New York City is the genuine outlier. Administrative Code 28-105.1 makes the work itself unlawful without a written permit, and Administrative Code 28-104.1 bars the department from issuing that permit until it approves the required construction documents, which must be prepared by or under the supervision of a registered design professional, meaning a licensed architect or engineer, as required by the code. A homeowner therefore cannot self-prepare and file the plans for permit-requiring work in New York City even though Administrative Code 28-105.5.1 defines the permit applicant as the person who performs the work or retains a subcontractor, and even though the general contractor registration definition in Administrative Code 28-401.3 expressly excludes an individual who constructs a residential structure of no more than three dwelling units for his or her own occupancy. Note that Administrative Code 28-105.4 exempts minor alterations and ordinary repairs from the permit requirement entirely, so the design professional bottleneck applies only to work that needs a permit in the first place. Confirm how Town of Brookhaven applies this before you apply.

From the Library

Deck Permit in other New York localities

Everything above, sourced

How this deck permit page for Town of Brookhaven was verified. 2 official sources: brookhavenny.gov, brookhavenny.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Town of Brookhaven Division of Building (Building Division), Department of Planning, Environment and Land Management. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page