Pool Permit in Town of Brookhaven, New York

It depends

Sometimes, depending on the project

Before any excavation or construction starts on an in-ground pool. An in-ground pool may not be used until a certificate of compliance is issued.

Quick answer

Zoning Sec. 85-891.K states that construction may not commence on an in-ground swimming pool until a building permit has been obtained, and that the pool may not be used until the Building Division issues a certificate of compliance. The same section draws the line at 18 inches: a pool extending more than 18 inches below grade is an in-ground pool and is a structure for zoning purposes, while an aboveground pool, which at no point is more than 18 inches below grade, is not a structure for purposes of the chapter. 'In-ground Pool' is the wording the town uses in its published list of residential permit types.

Typical threshold
pool structure extending more than 18 inches below grade, measuring how far the pool sits below grade and not the depth of the water, which is the code's test for an in-ground pool
Issued by
Town of Brookhaven Division of Building (Building Division), Department of Planning, Environment and Land Management
From an official source Verified

Who is pulling this permit?

Hire it out

Sponsored

Pool builders handle the permit and its safety requirements as part of the job. Comparing a few bids before you sign is the useful next step.

Compare pool builder quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

Pool size, height and setback rules in Town of Brookhaven

Placement
No outdoor swimming pool or hot tub spa may be placed in the primary front yard. ecode360.com document
Setback
An outdoor swimming pool must be at least 10 feet from any side or rear lot line and 15 feet from any secondary front yard lot line; for an aboveground pool, the distance is measured from the outer edge of any deck or platform attached to the pool wall. ecode360.com document
Setback
A hot tub spa must be at least 5 feet from any side or rear lot line and 15 feet from any secondary front yard lot line. ecode360.com document
Setback
No swimming pool or hot tub spa may be within 10 feet of the ground directly beneath an overhead electrical transmission line, and a pool within 25 feet of it needs a utility clearance inspection or a utility letter before a building permit is issued. ecode360.com document
Setback
In the A Residence district and the districts that take its accessory uses, pool equipment such as filters, heaters and pumps may go in a side or rear yard or a secondary front yard, but no closer than 5 feet to the lot line of that yard. ecode360.com document
Also required
No water may be put in a swimming pool or hot tub spa until the required wall, fence or barrier has been put up, and an in-ground pool under construction must be surrounded by a temporary fence as the Building Division requires. ecode360.com document
Also required
In the A Residence district and the districts that take its accessory uses, a pool house or cabana may be no larger than 400 square feet and no taller than 16 feet, must sit in the rear or required side yard and meet accessory structure setbacks, and may not have a kitchen, heat or sleeping use. ecode360.com document

What a pool permit costs in Town of Brookhaven

Fee schedule in force
Official scheduleRead .
Published in
Town of Brookhaven Building Division Fee Schedule 2026, Construction table:
  • "Inground Pool Fee $260" and "Above Ground Pool / Hot Tub Fee $135".
  • The same table opens with "Application Fee $100";
  • the schedule does not say whether it is added to each permit.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Town of Brookhaven compares in New York

JurisdictionPermit needed?Threshold
BuffaloIt dependspool designed for that water depth or more, or installed other than entirely above ground, at a one- or two-family dwelling or townhouse
New York CityIt dependsoutdoor in-ground or above-ground pools accessory to a one- or two-family dwelling, where the distance from the edge of an in-ground pool to any building or lot line exceeds the depth of the deepest part of the pool and a slop sink for indirect waste already exists or is installed under a plumbing permit
RochesterIt dependspool accessory to a one- or two-family dwelling and installed entirely above ground
Town of Brookhaventhis pageIt dependspool structure extending more than 18 inches below grade, measuring how far the pool sits below grade and not the depth of the water, which is the code's test for an in-ground pool
Town of HempsteadPermit requiredAny size

How to apply in Town of Brookhaven

General guide, not specific to this office

What a pool permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a pool permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

Town of Brookhaven Division of Building (Building Division), Department of Planning, Environment and Land Management

  • 1 Independence Hill, Farmingville, NY 11738
  • Phone: 631-451-8696

Permitting activity in Town of Brookhaven

In 2025, Town of Brookhaven authorized permits for 286 new residential housing units (266 single-family, 20 in multi-family buildings), valued at $94M, down from 514 the year before. That works out to about 0.6 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 479,883.

What else needs a permit in Town of Brookhaven

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsdeck rising more than eight inches above grade at any pointTown of Brookhaven Building Division Fee Schedule 2026, Construction table: "Deck Fee $0.50/SF"
Electrical PermitPermit requiredAny sizeIt does list an "Electrical Transfer Switch Fee" of $90 for the first $1,000 of construction costs; the schedule has the rest
Fence PermitIt dependsfence taller than four feet in a secondary front yard on a corner lot or through lotTown of Brookhaven Building Division Fee Schedule 2026, Construction table: "Fence Fee $1/LF"
HVAC PermitIt dependsinstallation of listed portable heating, ventilation or cooling equipment or appliancesTown of Brookhaven Building Division Fee Schedule 2026, Construction table: "CAC/HVAC Fee $160" and "Heating Unit Replacement Fee $135"
Patio PermitIt dependspatio rising more than eight inches above grade at any pointThe same table opens with "Application Fee $100"
Plumbing PermitIt dependsminor repairs to existing plumbing systemsSee schedule
Roof Replacement PermitIt dependsrepair work that has no impact on fire and life safety, meaning no impact on the structural system, the required means of egress, or the fire protection systemIt lists a "Roof Over Fee" of $90 for the first $1,000 of construction costs, plus $10 for every additional $1,000 thereafter; the schedule has the rest
Shed PermitIt dependsdetached one-story storage shed larger than 144 square feet, or any shed not located in the rear yardTown of Brookhaven Building Division Fee Schedule 2026, Construction table: "Shed Fee $200"
Solar PermitPermit requiredAny sizeTown of Brookhaven Building Division Fee Schedule 2026, Construction table: "Solar Panel (Residential) $135"

Frequently asked questions

Do you need a pool permit in Town of Brookhaven?
It depends on the project. Pool structure extending more than 18 inches below grade, measuring how far the pool sits below grade and not the depth of the water, which is the code's test for an in-ground pool. If you are unsure how that applies to your project, call the permit office at 631-451-8696 before you start.
How much does a pool permit cost in Town of Brookhaven?
The fee wording from the official schedule is in the cost table on this page, as we read it on 11 Nov 2026. For the figure on your own project, call the permit office at 631-451-8696.
Where do you apply for a pool permit in Town of Brookhaven?
You can apply through the Town of Brookhaven permit portal or contact the Town of Brookhaven Division of Building (Building Division), Department of Planning, Environment and Land Management directly. The links are listed on this page.
Can a homeowner pull a pool permit themselves in Town of Brookhaven?
Under New York law (Inside New York City: NYC Admin. Code 28-104.1, 28-105.1, 28-105.4, 28-105.5.1, 28-401.3 (definition of "general contractor"). Outside New York City: N.Y. Exec. Law 381(2); 19 NYCRR 1203.3(a)(1).): New York State sets no owner-builder rule at all outside New York City. Executive Law 381(2) puts administration and enforcement in the hands of each local government, and 19 NYCRR 1203.3(a)(1) only requires each authority having jurisdiction to make building permits mandatory for work that must conform to the codes, leaving who may apply to local law. The state licenses no general contractors and imposes no owner-builder affidavit, disclosure form or post-permit sale restriction of the kind Florida uses, so whether a homeowner may pull the permit is a question for the specific city, town, village or county. New York City is the genuine outlier. Administrative Code 28-105.1 makes the work itself unlawful without a written permit, and Administrative Code 28-104.1 bars the department from issuing that permit until it approves the required construction documents, which must be prepared by or under the supervision of a registered design professional, meaning a licensed architect or engineer, as required by the code. A homeowner therefore cannot self-prepare and file the plans for permit-requiring work in New York City even though Administrative Code 28-105.5.1 defines the permit applicant as the person who performs the work or retains a subcontractor, and even though the general contractor registration definition in Administrative Code 28-401.3 expressly excludes an individual who constructs a residential structure of no more than three dwelling units for his or her own occupancy. Note that Administrative Code 28-105.4 exempts minor alterations and ordinary repairs from the permit requirement entirely, so the design professional bottleneck applies only to work that needs a permit in the first place. Confirm how Town of Brookhaven applies this before you apply.

From the Library

Pool Permit in other New York localities

Everything above, sourced

How this pool permit page for Town of Brookhaven was verified. 2 official sources: brookhavenny.gov, web.archive.org; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Town of Brookhaven Division of Building (Building Division), Department of Planning, Environment and Land Management. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

It depends
Check my project