New York / Town of Hempstead

Shed Permit in Town of Hempstead, New York

Permit required

Yes, a permit is required

Before installing or building a shed, including a prefabricated shed delivered assembled.

Confirmed on official page Verified Town of Hempstead Department of Buildings

By Mario Bailey, verified against official sources

Quick answer

A shed is filed as a building permit with the Department of Buildings, and the Department publishes a shed instruction sheet listing the required Affidavit of Property Owner, unaltered survey, plot plan showing the shed dimensions and distance to the property line, construction drawings or the manufacturer's specifications for a prefabricated shed, and a notarized Affidavit of No Plumbing or Electrical. The Town publishes no small shed exemption: the 144 square foot figure in its instructions is the largest shed allowed as of right, not a size below which no permit is needed. Placement rules are strict: rear yard only, at least 45 feet from any front property line and at least two feet from the rear and side lines, with corner lots fixed at exactly two feet and a plan examiner consultation recommended.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?

When a permit is usually needed

Before installing or building a shed, including a prefabricated shed delivered assembled.

What a shed permit costs in Town of Hempstead

Line item
shed permitBy formulaCharged as a building permit under Town Code 86-11C(1) as amended by Local Law No. 20-2024 (effective 4-2-2024): $200 for residential work with an estimated cost up to $1,000, then $200 plus $18 for each additional $1,000 or fraction thereof. A shed already standing without a permit is charged under 86-11C(2) at $400 plus $36 per additional $1,000. Local Law No. 20-2024 also carries 86-11C(4) from Local Law No. 93-2022: multiple accessory structures filed under one application are charged $200 residential for each separate accessory structure. A Building Department record search, needed when the application is going to the Board of Zoning Appeals, is $40.
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Town of Hempstead compares in New York

JurisdictionPermit needed?Threshold
BuffaloIt dependsgross floor area of a one story detached tool or storage shed, playhouse or similar accessory building at a one- or two-family dwelling or townhouse
New York CityIt dependstemporary portable freestanding sheds accessory to a one- or two-family dwelling that are also no more than 7 feet 6 inches high, at least 3 feet from every lot line, used for household storage, do not obstruct a required window, and are the only such shed on the tax lot
RochesterIt dependsgross floor area of a one-story detached storage shed accessory to a one- or two-family dwelling
Town of BrookhavenIt dependsdetached one-story storage shed larger than 144 square feet, or any shed not located in the rear yard
Town of Hempsteadthis pagePermit requiredNot specified

How to apply in Town of Hempstead

A residential shed permit application, once the shed is large enough to require one, is a set of construction documents that show what will be built and prove it meets the adopted residential code. In practice that means a written permit application, a scaled site plan locating the shed and its distances to the property lines, and construction documents covering the shed's foundation or anchoring system and its framing.

What most shed permit applications include:

  • A written permit application identifying the proposed work and describing the property by its address or legal description, filed with the building department before construction begins (IRC R105.3).
  • A scaled site plan showing the shed's size and location and its dimensioned distances to all property lines so required setbacks can be verified before the permit is issued (IRC R106.2).
  • Construction documents showing the shed's foundation: freestanding accessory structures at or under the code's small-structure size and eave-height limits (600 square feet and a 10 foot eave height in the model code) are exempt from continuous footings but must still be shown supported on undisturbed soil or engineered fill and anchored to resist wind-induced uplift and overturning (IRC R403.1).
  • Where the shed does sit on a continuous foundation with a wood sill plate, anchor bolt or approved strap details tying the sill plate to the foundation (IRC R403.1.6).
  • Roof framing details showing the rafter-to-wall or truss-to-wall connections, since even a shed exempt from continuous footings must be anchored to resist wind-induced uplift and overturning (IRC R403.1; R802.11).

General submittal guidance from IRC R105.3 (permit application), R106.2 (site plan), R403.1 (footings and anchorage for accessory structures), and R403.1.6 (sill anchorage), 2021 IRC. Source. Town of Hempstead Department of Buildings sets the exact checklist for Town of Hempstead.

Where to apply in Town of Hempstead:

Town of Hempstead Department of Buildings

Inspections and closing out your permit

A permitted shed is inspected in stages as it goes up: the foundation or the anchors that hold it down before they are covered, the framing before it is enclosed, and a final inspection once the shed is finished. Each stage checks the items that would be hidden or unsafe if skipped.

  1. Foundation or anchor inspection: called after any required footings, piers, or ground anchors are set and any forms or reinforcing steel are in place, but before concrete is placed, so the foundation or anchoring system can be verified before it is covered (IRC R109.1.1).
  2. Frame inspection: after the shed is framed, sheathed, and braced, the inspector checks the framing, bracing, fasteners, and the roof connections that resist wind uplift, before those elements are covered (IRC R109.1.4 frame inspection; R403.1 anchorage).
  3. Final inspection: made after the permitted work is complete and before the shed is used; work may not proceed past any inspection stage without the building official's approval (IRC R109.1.6 final inspection; R109.4 approval required).
  4. For a pre-fabricated or kit shed, the manufacturer's installation instructions must be on site at the time of inspection so the inspector can confirm the anchoring and assembly match the design (IRC R106.1.2).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Town of Hempstead permit portal or by phone at 516-538-8500.

Inspection sequence from IRC R109.1.1 (foundation inspection), R109.1.4 (frame inspection), R109.1.6 (final inspection), and R106.1.2 (manufacturer's instructions on site), 2021 IRC. Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need a shed permit in Town of Hempstead?
A shed is filed as a building permit with the Department of Buildings, and the Department publishes a shed instruction sheet listing the required Affidavit of Property Owner, unaltered survey, plot plan showing the shed dimensions and distance to the property line, construction drawings or the manufacturer's specifications for a prefabricated shed, and a notarized Affidavit of No Plumbing or Electrical. The Town publishes no small shed exemption: the 144 square foot figure in its instructions is the largest shed allowed as of right, not a size below which no permit is needed. Placement rules are strict: rear yard only, at least 45 feet from any front property line and at least two feet from the rear and side lines, with corner lots fixed at exactly two feet and a plan examiner consultation recommended. Always confirm with the Town of Hempstead Department of Buildings before starting.
How much does a shed permit cost in Town of Hempstead?
Charged as a building permit under Town Code 86-11C(1) as amended by Local Law No. 20-2024 (effective 4-2-2024): $200 for residential work with an estimated cost up to $1,000, then $200 plus $18 for each additional $1,000 or fraction thereof. A shed already standing without a permit is charged under 86-11C(2) at $400 plus $36 per additional $1,000. Local Law No. 20-2024 also carries 86-11C(4) from Local Law No. 93-2022: multiple accessory structures filed under one application are charged $200 residential for each separate accessory structure. A Building Department record search, needed when the application is going to the Board of Zoning Appeals, is $40. See the official fee schedule for current amounts.
Where do you apply for a shed permit in Town of Hempstead?
You can apply through the Town of Hempstead permit portal or contact the Town of Hempstead Department of Buildings directly. The links are listed on this page.
Can a homeowner pull a shed permit themselves in Town of Hempstead?
Under New York law (Inside New York City: NYC Admin. Code 28-104.1, 28-105.1, 28-105.4, 28-105.5.1, 28-401.3 (definition of "general contractor"). Outside New York City: N.Y. Exec. Law 381(2); 19 NYCRR 1203.3(a)(1).): New York State sets no owner-builder rule at all outside New York City. Executive Law 381(2) puts administration and enforcement in the hands of each local government, and 19 NYCRR 1203.3(a)(1) only requires each authority having jurisdiction to make building permits mandatory for work that must conform to the codes, leaving who may apply to local law. The state licenses no general contractors and imposes no owner-builder affidavit, disclosure form or post-permit sale restriction of the kind Florida uses, so whether a homeowner may pull the permit is a question for the specific city, town, village or county. New York City is the genuine outlier. Administrative Code 28-105.1 makes the work itself unlawful without a written permit, and Administrative Code 28-104.1 bars the department from issuing that permit until it approves the required construction documents, which must be prepared by or under the supervision of a registered design professional, meaning a licensed architect or engineer, as required by the code. A homeowner therefore cannot self-prepare and file the plans for permit-requiring work in New York City even though Administrative Code 28-105.5.1 defines the permit applicant as the person who performs the work or retains a subcontractor, and even though the general contractor registration definition in Administrative Code 28-401.3 expressly excludes an individual who constructs a residential structure of no more than three dwelling units for his or her own occupancy. Note that Administrative Code 28-105.4 exempts minor alterations and ordinary repairs from the permit requirement entirely, so the design professional bottleneck applies only to work that needs a permit in the first place. Confirm how Town of Hempstead applies this before you apply.

From the Library

What else needs a permit in Town of Hempstead

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredNot specifiedCharged as a building permit under Town Code 86-11C(1) as amended by Local Law No.
Electrical PermitPermit requiredNot specifiedThe Town charges no electrical permit fee.
Fence PermitPermit requiredNot specifiedCharged as a building permit under Town Code 86-11C(1) as amended by Local Law No.
HVAC PermitPermit requiredNot specifiedTown Code 86-11I(2), as adopted by Local Law No.
Plumbing PermitPermit requiredNot specifiedTown Code 86-11N, as adopted by Local Law No.
Pool PermitPermit requiredNot specifiedCharged as a building permit under Town Code 86-11C(1) as amended by Local Law No.
Solar PermitPermit requiredNot specifiedThe flat solar fee is gone.

Shed Permit in other New York localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not Town of Hempstead documents; the office above sets the local rules.

Verified by a person against the sources above on , not confirmed with Town of Hempstead Department of Buildings. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Compare Shed Permit requirements across New York localities

Permit required
Get quotes