New York / Town of Hempstead

HVAC Permit in Town of Hempstead, New York

Permit required

Yes, a permit is required

Before installing or altering a heating system, air conditioning system, ventilation or exhaust system, refrigeration or water cooling system, or a standby generator.

Quick answer

The Town of Hempstead charges and therefore issues a permit for the installation or alteration of major heating, air conditioning, ventilation, exhaust, refrigeration and water cooling systems, and the Department of Buildings publishes a filing instruction sheet for residential air conditioning and generators. That sheet requires a notarized Affidavit of Property Owner, a recent unaltered survey and a professionally drawn plot plan highlighting the condenser or generator location and its setback to the property line, plus manufacturer specifications and workers compensation. Construction drawings are additionally required where the air handler goes in the attic or the condenser or generator sits on a raised platform for flood zone compliance. If the system is part of a new building or a larger alteration that already has a permit, no separate HVAC fee is charged.

Issued by
Town of Hempstead Department of Buildings
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

HVAC contractors usually pull this permit as part of the job. If you have not picked one yet, compare a few quotes before you commit.

Compare HVAC contractor quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What an HVAC permit costs in Town of Hempstead

Fee schedule in force
Official scheduleRead .
Published in
Town Code § 86-11I(2) (section last amended by Local Law No. 93-2022, adopted 12-6-2022, effective 12-22-2022):

$300 for an estimated cost of up to $1,000, plus $15 for each additional $1,000 or part thereof of estimated cost, with no separate fee where the system is part of a new building or alteration for which a permit has been issued.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Town of Hempstead compares in New York

JurisdictionPermit needed?Threshold
BuffaloPermit requiredAny size
New York CityIt dependspackaged air-conditioning units installed in an existing one- or two-family dwelling that are not part of an alteration otherwise requiring a permit; the same exemption is capped at 3 tons in all other buildings
RochesterIt dependsBefore a new heating, ventilation or air conditioning installation, and before any...
Town of BrookhavenIt dependsinstallation of listed portable heating, ventilation or cooling equipment or appliances
Town of Hempsteadthis pagePermit requiredAny size

How to apply in Town of Hempstead

General guide, not specific to this office

What an HVAC permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how an HVAC permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

Town of Hempstead Department of Buildings

Permitting activity in Town of Hempstead

In 2025, Town of Hempstead authorized permits for 270 new residential housing units (250 single-family, 20 in multi-family buildings), valued at $98M, up from 269 the year before. That works out to about 0.4 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 764,055.

What else needs a permit in Town of Hempstead

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

None of the 7 project types verified for Town of Hempstead carry a size or scope threshold. See the Permit needed column for each project's own answer, since there is no threshold to compare here.

ProjectPermit needed?Typical fee
Deck PermitPermit requiredSee schedule
Electrical PermitPermit requiredThe building permit fee by estimated cost under § 86-11C(1) is $200 for residential work with an estimated cost up to $1,000; the schedule has the rest
Fence PermitPermit requiredSee schedule
Plumbing PermitPermit requiredSee schedule
Pool PermitPermit requiredSee schedule
Shed PermitPermit requiredSee schedule
Solar PermitPermit requiredSee schedule

Frequently asked questions

Do you need an HVAC permit in Town of Hempstead?
Yes, before installing or altering a heating system, air conditioning system, ventilation or exhaust system, refrigeration or water cooling system, or a standby generator. If you are unsure how that applies to your project, call the Town of Hempstead Department of Buildings at 516-538-8500 before you start.
How much does an HVAC permit cost in Town of Hempstead?
The fee wording from the official schedule is in the cost table on this page, as we read it on 11 Nov 2026. For the figure on your own project, call the Town of Hempstead Department of Buildings at 516-538-8500.
Where do you apply for an HVAC permit in Town of Hempstead?
You can apply through the Town of Hempstead permit portal or contact the Town of Hempstead Department of Buildings directly. The links are listed on this page.
Can a homeowner pull an HVAC permit themselves in Town of Hempstead?
Under New York law (Inside New York City: NYC Admin. Code 28-104.1, 28-105.1, 28-105.4, 28-105.5.1, 28-401.3 (definition of "general contractor"). Outside New York City: N.Y. Exec. Law 381(2); 19 NYCRR 1203.3(a)(1).): New York State sets no owner-builder rule at all outside New York City. Executive Law 381(2) puts administration and enforcement in the hands of each local government, and 19 NYCRR 1203.3(a)(1) only requires each authority having jurisdiction to make building permits mandatory for work that must conform to the codes, leaving who may apply to local law. The state licenses no general contractors and imposes no owner-builder affidavit, disclosure form or post-permit sale restriction of the kind Florida uses, so whether a homeowner may pull the permit is a question for the specific city, town, village or county. New York City is the genuine outlier. Administrative Code 28-105.1 makes the work itself unlawful without a written permit, and Administrative Code 28-104.1 bars the department from issuing that permit until it approves the required construction documents, which must be prepared by or under the supervision of a registered design professional, meaning a licensed architect or engineer, as required by the code. A homeowner therefore cannot self-prepare and file the plans for permit-requiring work in New York City even though Administrative Code 28-105.5.1 defines the permit applicant as the person who performs the work or retains a subcontractor, and even though the general contractor registration definition in Administrative Code 28-401.3 expressly excludes an individual who constructs a residential structure of no more than three dwelling units for his or her own occupancy. Note that Administrative Code 28-105.4 exempts minor alterations and ordinary repairs from the permit requirement entirely, so the design professional bottleneck applies only to work that needs a permit in the first place. Confirm how Town of Hempstead applies this before you apply.

From the Library

HVAC Permit in other New York localities

Everything above, sourced

How this HVAC permit page for Town of Hempstead was verified. 2 official sources: hempsteadny.gov, ecode360.com; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Town of Hempstead Department of Buildings. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Permit required
Check my project