Building permits in Rochester, New York
Of the 10 common home projects we have verified in Rochester, 1 needs a permit outright and 9 depend on size or scope. Click any project for the full rule, fee, and how to apply.
- Project types verified
- 10in Rochester
City of Rochester Department of Neighborhood and Business Development, Bureau of Zoning and Permitting (Building Permit Office); inspections and code enforcement by the Bureau of Buildings and Compliance
- Rochester City Hall, Room 125B, 30 Church St, Rochester, NY 14614
- Phone: 585-428-6526
- Email: planreview@cityofrochester.gov
- Official permit page
- Permit portal
- Official fee schedule
Look up a permit in Rochester
Rochester runs an online permit portal. We have not confirmed what its record search covers.
What needs a permit in Rochester
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | height of the deck surface above grade | Deck Fees, published on the city's building permit fees page: "Deck up to 144 sq. ft." $75.00, "Deck 145 to 400 sq. ft." $160.00; the schedule has the rest |
| Electrical Permit | It depends | Before replacing, repairing or altering an electrical service, before new interior or... | Residential electrical inspection fees on the city's fee page: "New dwelling unit with service" $275.00 plus $120.00 for each additional unit |
| Fence Permit | It depends | height of a fence, wall or retaining wall above average grade | The Fences (Residential and Village Center Districts) packet dated Mar 2026 states "Fee-$50.00" payable to the City Treasurer; the schedule has the rest |
| HVAC Permit | It depends | Before a new heating, ventilation or air conditioning installation, and before any... | HVAC work falls under Building Permit Fees based on the actual cost of work, which start at $75.00 for $0 to $2,000 and $110.00 for $2,001 to $4,000 |
| Patio Permit | It depends | aggregate size of a paved area or of an addition to a paved area | Exterior Paved Area Fees, published on the city's building permit fees page: "Exterior paved area or parking lot" $160.00 |
| Plumbing Permit | It depends | Before replacing, repairing or altering water service, sewer, drain, waste, vent or... | See schedule |
| Pool Permit | It depends | pool accessory to a one- or two-family dwelling and installed entirely above ground | Miscellaneous Fees on the city's building permit fees page: "Swimming pool" $85.00 |
| Roof Replacement Permit | It depends | share of the total roof area involved in the repair or covered by an added roof layer | Roofing falls under Building Permit Fees based on the actual cost of work: $75.00 for $0 to $2,000, $110.00 for $2,001 to $4,000; the schedule has the rest |
| Shed Permit | It depends | gross floor area of a one-story detached storage shed accessory to a one- or two-family dwelling | Building Permit Fees are based on the actual cost of work: $75.00 for $0 to $2,000, $110.00 for $2,001 to $4,000; the schedule has the rest |
| Solar Permit | Permit required | Any size | The Solar JULY 2026 packet states "Unified Fee $100" by check or money order payable to the City Treasurer; the schedule has the rest |
Planning a project in Rochester?
Hire it out
Sponsored
Licensed contractors usually pull the permit as part of the job. Comparing a few local quotes before you commit is the useful next step.
Compare local contractor quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
Planning several things at once? Check your whole project
Rochester permit fees compared with nearby New York localities
| New York locality | Deck Permit | HVAC Permit | Electrical Permit |
|---|---|---|---|
| Rochester | Deck Fees, published on the city's building permit fees page: "Deck up to 144 sq. ft." $75.00; the schedule has the rest | See schedule | See schedule |
| Buffalo | See schedule | Heating permit application: $50.00 application fee; the schedule has the rest | Electrical permit application: $50.00 application fee for all permits; the schedule has the rest |
| New York City | See schedule | See schedule | See schedule |
| Town of Brookhaven | Town of Brookhaven Building Division Fee Schedule 2026, Construction table: "Deck Fee $0.50/SF" | See schedule | It does list an "Electrical Transfer Switch Fee" of $90 for the first $1,000 of construction costs; the schedule has the rest |
Each cell is taken from that New York jurisdiction's own fee schedule; the full wording and source sit on each permit page.
Rochester permit questions, answered from the data
- Do you need a permit in Rochester?
- It depends on the project. Of the 10 permit types we cover in Rochester, 1 always requires a permit (for example a solar permit) and 9 depend on size or scope (a deck permit, for instance). Each Rochester permit type's page states the exact rule and its source.
- How much does a permit cost in Rochester?
- Rochester publishes a fee for 10 of the 10 permit types we cover, each quoted on its page from the jurisdiction's own schedule (linked on every page that carries one). Fees are set by City of Rochester Department of Neighborhood and Business Development, Bureau of Zoning and Permitting (Building Permit Office); inspections and code enforcement by the Bureau of Buildings and Compliance; we do not estimate or mark them up.
- Where do you apply for a permit in Rochester?
- City of Rochester Department of Neighborhood and Business Development, Bureau of Zoning and Permitting (Building Permit Office); inspections and code enforcement by the Bureau of Buildings and Compliance issues permits in Rochester and has an online permit portal, and takes questions at 585-428-6526. The Rochester official page and portal are linked in the office section above.
How the Rochester pages were verified. 10 permit types, 6 distinct official sources, most recently checked . Every rule is read from City of Rochester Department of Neighborhood and Business Development, Bureau of Zoning and Permitting (Building Permit Office); inspections and code enforcement by the Bureau of Buildings and Compliance or the applicable code and cited on its page; anything we could not confirm for Rochester is marked rather than estimated. How we verify.
Permitting activity in Rochester
In 2025, Rochester authorized permits for 104 new residential housing units (51 single-family, 53 in multi-family buildings), valued at $40M , down from 487 the year before. That works out to about 0.5 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 205,225.