Fence Permit in Detroit, Michigan
It depends
Sometimes, depending on the project
Before erecting a fence more than 7 feet high, or any fence in a Special Review District, and before any exterior fence work on a property inside a local historic district.
Quick answer
Detroit assumed responsibility for administering and enforcing the state construction codes on March 13, 2000 under the Stille-DeRossett-Hale Single State Construction Code Act, so BSEED and not the state Bureau of Construction Codes issues permits inside the city (2019 Detroit City Code Sec. 8-7-2). BSEED's own guide exempts fences 7 feet high or less from the building permit requirement, provided they are not in a Special Review District. The department's Residential and Commercial Ownership page states the same exemption as "A fence that is not more than 7 feet (2 134 mm) high." A permit is required for all exterior work, fences included, on property in a local historic district.
- Typical threshold
- fence height, for a fence outside a Special Review District
- Issued by
- City of Detroit Buildings, Safety Engineering and Environmental Department (BSEED)
- Phone
- (313) 224-2372
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
Fence installers usually handle any required permit as part of the job. Compare a few bids before you commit.
Compare fence installer quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What a fence permit costs in Detroit
- Fee schedule in force
- Official scheduleRead .
Fence work is priced as a building permit on project cost under the BSEED Fee Schedule effective January 1, 2024, modified 7/18/2025: A: BUILDING and RESIDENTIAL PERMITS, New Buildings, Alterations, Repairs, And Additions, $2,000 or less, Flat $271.43.
The same schedule carries a separate Special Permits line, "Permits because of historical district requirement (Exterior Painting of Building, fences, etc.)", Flat $106.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How Detroit compares in Michigan
No Michigan jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.
| Jurisdiction | Permit needed? | Typical fee |
|---|---|---|
| Ann Arbor | Permit required | The Planning Services Fence Guidelines handout (revised 3/3/2025) states a flat Fence Permit Fee of $75.00 |
| Detroitthis page | It depends | See schedule |
| Grand Rapids | Permit required | FY 2027 Planning, Design and Development Fee Schedule, Planning Fees effective July 1, 2026, ZONING PERMITS: "Level I $25.00" covering "Fence, Paving" |
| Sterling Heights | Permit required | Fence Permit Application 2026-2027 (revised 8/12/2026) fee box: WOOD $46, METAL $46, WIRE $46, PVC $46, MASONRY $134, SEPARATION $134 |
How to apply in Detroit
General guide, not specific to this office
What a fence permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a fence permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
City of Detroit Buildings, Safety Engineering and Environmental Department (BSEED)
- Development Resource Center, Coleman A. Young Municipal Center, 2 Woodward Avenue, Room 434, Detroit, MI 48226
- Phone: (313) 224-2372
- Email: DRC@detroitmi.gov
Your Fence Permit checklist for Detroit
- Confirm the requirement. Sometimes, depending on the project. Typical threshold: fence height, for a fence outside a Special Review District. Read the rule where we read it: detroitmi.gov: buildings safety engineering and environmental department....
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Detroit permit portal.
- Keep the office details handy. City of Detroit Buildings, Safety Engineering and Environmental Department (BSEED). Phone: (313) 224-2372. Email: DRC@detroitmi.gov. Address: Development Resource Center, Coleman A. Young Municipal Center, 2 Woodward Avenue, Room 434, Detroit, MI 48226.
Compiled from the official sources on this page. Last checked .
Permitting activity in Detroit
In 2025, Detroit authorized permits for 2,620 new residential housing units (662 single-family, 1,958 in multi-family buildings), valued at $291M, up from 1,919 the year before. That works out to about 3.9 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 665,369.
What else needs a permit in Detroit
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | deck area | Building permit fees are based on project cost under the BSEED Fee Schedule effective January 1, 2024, modified 7/18/2025: $2,000 or less, Flat $271.43 |
| Electrical Permit | It depends | electrical alterations beyond replacing switches or receptacles | BSEED Fee Schedule effective January 1, 2024, modified 7/18/2025, ELECTRICAL PART A: "Base fee" $66 |
| HVAC Permit | It depends | Before installing or altering any heating, cooling, gas piping, air distribution or... | See schedule |
| Plumbing Permit | It depends | plumbing alterations beyond the working parts of a faucet or valve or clearance of stoppages | BSEED Fee Schedule effective January 1, 2024, modified 7/18/2025, PLUMBING INSTALLATION PERMITS: "Application Fee (Non-Refundable), Flat" $73 |
| Pool Permit | It depends | prefabricated above-ground pool accessory to a Group R-3 occupancy holding not more than 5,000 gallons | Building permit fees are based on project cost under the BSEED Fee Schedule effective January 1, 2024, modified 7/18/2025: $2,000 or less, Flat $271.43 |
| Roof Replacement Permit | It depends | roof-work beyond replacing a few shingles | Building permit fees are based on project cost under the BSEED Fee Schedule effective January 1, 2024, modified 7/18/2025: $2,000 or less, Flat $271.43 |
| Shed Permit | It depends | floor area of a one-story detached accessory structure in residential construction | Building permit fees are based on project cost under the BSEED Fee Schedule effective January 1, 2024, modified 7/18/2025: $2,000 or less, Flat $271.43 |
| Solar Permit | Permit required | Any size | Solar Photovoltaic systems (per visit): Systems with NO connection to utility grid, Per visit $165 |
Frequently asked questions
- Do you need a fence permit in Detroit?
- It depends on the project. Fence height, for a fence outside a Special Review District. If you are unsure how that applies to your project, call the permit office at (313) 224-2372 before you start.
- How much does a fence permit cost in Detroit?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 15 Aug 2026. For the figure on your own project, call the permit office at (313) 224-2372.
- How long does a fence permit take in Detroit?
- In Detroit, a fence permit typically takes about 5 days for a residential building permit after the application is submitted. Times can vary by workload and project scope, so confirm with the office.
- Where do you apply for a fence permit in Detroit?
- You can apply through the Detroit permit portal or contact the City of Detroit Buildings, Safety Engineering and Environmental Department (BSEED) directly. The links are listed on this page.
- Can a homeowner pull a fence permit themselves in Detroit?
- Under Michigan law (MCL 339.2403(b), (c); MCL 339.2401(a)(iii), (b)(ii)(A); MCL 339.5737(3)(g); MCL 339.6107(2)(d); MCL 339.5819): Yes. A Michigan homeowner may pull the building permit and do the work on their own home without a residential builder license, because the licensing article both defines the trade to exclude them and exempts them outright. MCL 339.2401(a)(iii) says a residential builder is a person that erects a residential structure except for the person's own use and occupancy on the person's property, and MCL 339.2403(b) exempts an owner of property with reference to a structure on the property for the owner's own use and occupancy. Own use and occupancy is the condition, so the exemption does not cover building to sell, and MCL 339.2403(c) limits owners of rental property to maintenance and alteration of that property. The statute sets no cap on how many times a homeowner may use the exemption; the only frequency rule in the article catches purchase, substantial rehabilitation, and resale of the same structure more than twice in 1 calendar year, and MCL 339.2401(b)(ii)(A) exempts work for the person's own use and occupancy from even that. Homeowners can also pull their own trade permits: electrical work in a single family home and accompanying outbuildings owned and occupied or to be occupied by the person doing the work (MCL 339.5737(3)(g)), their own plumbing, building sewer, or private sewer in their single-family dwelling if a permit is secured (MCL 339.6107(2)(d)), and a heating or refrigerating system if the owner affirms in the permit application that they are or will become the owner and occupant (MCL 339.5819). Confirm how Detroit applies this before you apply.
From the Library
Fence Permit in other Michigan localities
Everything above, sourced
How this fence permit page for Detroit was verified. 2 official sources: detroitmi.gov, detroitmi.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Detroit Buildings, Safety Engineering and Environmental Department (BSEED). Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page