Michigan / Detroit

Shed Permit in Detroit, Michigan

It depends

Sometimes, depending on the project

Before building a detached shed or garage larger than 200 square feet or more than one story, and before any accessory structure over 100 square feet under the zoning ordinance.

Confirmed on official page Verified

Issued byCity of Detroit Buildings, Safety Engineering and Environmental Department (BSEED)

By Mario Bailey, verified against official sources

Quick answer

BSEED's Do I Need a Building or Trade Permit guide exempts detached accessory structures of no more than one story and 200 square feet for residential construction, naming garages and sheds as the example, and drops the exemption to 120 square feet for commercial construction. The department's Residential and Commercial Ownership page states the Michigan Building Code version of the same exemption at 120 square feet for tool and storage sheds and playhouses. Separately, Zoning Sec. 50-12-455 requires a permit for any accessory structure exceeding 100 square feet of gross floor area, so a shed between 100 and 200 square feet can be exempt from the building permit and still need zoning approval.

Typical threshold: floor area of a one-story detached accessory structure in residential construction.

Diagram of the 200 sq ft footprint area threshold for a shed permit in Detroit, Michigan
Threshold illustrated: 200 sq ft. Whether Detroit requires a permit above or below this measurement is stated in the verdict on this page, verified 2026-08-15.

Who is pulling this permit?

Hire it out

Sponsored

If a contractor builds or places your shed, they usually handle any required permit. Compare a few bids before you commit.

Compare contractor quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

When a permit is usually needed

Before building a detached shed or garage larger than 200 square feet or more than one story, and before any accessory structure over 100 square feet under the zoning ordinance.

What a shed permit costs in Detroit

Line item
shed permitBy formulaBuilding permit fees are based on project cost under the BSEED Fee Schedule effective January 1, 2024, modified 7/18/2025: $2,000 or less, Flat $271.43; Over $2,000 but not over $25,000, First $2,000 Base $271.43 plus $34.09 Per $1,000 or fraction thereof over $2,000.
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Detroit compares in Michigan

JurisdictionPermit needed?Threshold
Ann ArborPermit requiredAny size
Detroitthis pageIt dependsfloor area of a one-story detached accessory structure in residential construction
Grand RapidsPermit requiredAny size
Sterling HeightsIt dependsshed floor area above which a building permit is required

Closest shed permit thresholds outside Michigan

Jurisdictions we cover whose limit sits nearest Detroit's 200 sq ft.

  • Austin, Texas, one-story detached accessory structures used as tool or storage sheds with floor area no greater than 200 sq ft and no more than 15 ft in height and no plumbing and not in a floodplain are exempt
  • Baton Rouge, Louisiana, floor area of a detached accessory structure
  • Bellevue, Washington, detached storage sheds playhouses or gazebos with a floor area of 200 square feet or less do not require a building permit; structures over 200 square feet require a permit
  • Boise, Idaho, floor area of a one-story detached accessory structure

How to apply in Detroit

In Detroit, a residential shed permit application, once the shed is large enough to require one, is a set of construction documents that show what will be built and prove it meets the adopted residential code. In practice that means a written permit application, a scaled site plan locating the shed and its distances to the property lines, and construction documents covering the shed's foundation or anchoring system and its framing.

What most shed permit applications include:

  • For Detroit, a written permit application identifying the proposed work and describing the property by its address or legal description, filed with the building department before construction begins (IRC R105.3).
  • For Detroit, a scaled site plan showing the shed's size and location and its dimensioned distances to all property lines so required setbacks can be verified before the permit is issued (IRC R106.2).
  • Construction documents showing the shed's foundation: freestanding accessory structures at or under the code's small-structure size and eave-height limits (600 square feet and a 10 foot eave height in the model code) are exempt from continuous footings but must still be shown supported on undisturbed soil or engineered fill and anchored to resist wind-induced uplift and overturning (IRC R403.1).
  • Where the shed does sit on a continuous foundation with a wood sill plate, anchor bolt or approved strap details tying the sill plate to the foundation (IRC R403.1.6).
  • Roof framing details showing the rafter-to-wall or truss-to-wall connections, since even a shed exempt from continuous footings must be anchored to resist wind-induced uplift and overturning (IRC R403.1; R802.11).

General submittal guidance from IRC R105.3 (permit application), R106.2 (site plan), R403.1 (footings and anchorage for accessory structures), and R403.1.6 (sill anchorage), 2021 IRC. Source. City of Detroit Buildings, Safety Engineering and Environmental Department (BSEED) sets the exact checklist for Detroit.

Where to apply in Detroit:

City of Detroit Buildings, Safety Engineering and Environmental Department (BSEED)

  • Development Resource Center, Coleman A. Young Municipal Center, 2 Woodward Avenue, Room 434, Detroit, MI 48226
  • Phone: (313) 224-2372
  • Email: DRC@detroitmi.gov

Shed Permit in Detroit compared with nearby Michigan localities

LocalityPermit needed?ThresholdWhat each Michigan schedule saysVerified
DetroitIt dependsfloor area of a one-story detached accessory structure in residential construction...under the BSEED Fee Schedule effective January 1, 2024, modified 7/18/2025: $2,000...
Ann ArborPermit requiredAny size$75"
Grand RapidsPermit requiredAny sizeUnder Planning Fees, ZONING PERMITS "Level I $25.00" lists "Accessory Structure / Over...
Sterling HeightsIt dependsshed floor area above which a building permit is required...Permit Application 26-27 fee chart: 'Sheds (Between 50 - 200 sq. ft)' $78.00, plus...

Inspections and closing out your permit

In Detroit, a permitted shed is inspected in stages as it goes up: the foundation or the anchors that hold it down before they are covered, the framing before it is enclosed, and a final inspection once the shed is finished. Each stage checks the items that would be hidden or unsafe if skipped.

  1. Foundation or anchor inspection in Detroit: called after any required footings, piers, or ground anchors are set and any forms or reinforcing steel are in place, but before concrete is placed, so the foundation or anchoring system can be verified before it is covered (IRC R109.1.1).
  2. Frame inspection in Detroit: after the shed is framed, sheathed, and braced, the inspector checks the framing, bracing, fasteners, and the roof connections that resist wind uplift, before those elements are covered (IRC R109.1.4 frame inspection; R403.1 anchorage).
  3. Final inspection in Detroit: made after the permitted work is complete and before the shed is used; work may not proceed past any inspection stage without the building official's approval (IRC R109.1.6 final inspection; R109.4 approval required).
  4. In Detroit: for a pre-fabricated or kit shed, the manufacturer's installation instructions must be on site at the time of inspection so the inspector can confirm the anchoring and assembly match the design (IRC R106.1.2).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Detroit permit portal or by phone at (313) 224-2372.

Inspection sequence from IRC R109.1.1 (foundation inspection), R109.1.4 (frame inspection), R109.1.6 (final inspection), and R106.1.2 (manufacturer's instructions on site), 2021 IRC. Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need a shed permit in Detroit?
BSEED's Do I Need a Building or Trade Permit guide exempts detached accessory structures of no more than one story and 200 square feet for residential construction, naming garages and sheds as the example, and drops the exemption to 120 square feet for commercial construction. The department's Residential and Commercial Ownership page states the Michigan Building Code version of the same exemption at 120 square feet for tool and storage sheds and playhouses. Separately, Zoning Sec. 50-12-455 requires a permit for any accessory structure exceeding 100 square feet of gross floor area, so a shed between 100 and 200 square feet can be exempt from the building permit and still need zoning approval. Floor area of a one-story detached accessory structure in residential construction. Always confirm with the office before starting.
How much does a shed permit cost in Detroit?
Building permit fees are based on project cost under the BSEED Fee Schedule effective January 1, 2024, modified 7/18/2025: $2,000 or less, Flat $271.43; Over $2,000 but not over $25,000, First $2,000 Base $271.43 plus $34.09 Per $1,000 or fraction thereof over $2,000. See the official fee schedule for current amounts.
How long does a shed permit take in Detroit?
In Detroit, a shed permit typically takes about 5 days for a residential building permit after the application is submitted. Times can vary by workload and project scope, so confirm with the office.
Where do you apply for a shed permit in Detroit?
You can apply through the Detroit permit portal or contact the City of Detroit Buildings, Safety Engineering and Environmental Department (BSEED) directly. The links are listed on this page.
Can a homeowner pull a shed permit themselves in Detroit?
Under Michigan law (MCL 339.2403(b), (c); MCL 339.2401(a)(iii), (b)(ii)(A); MCL 339.5737(3)(g); MCL 339.6107(2)(d); MCL 339.5819): Yes. A Michigan homeowner may pull the building permit and do the work on their own home without a residential builder license, because the licensing article both defines the trade to exclude them and exempts them outright. MCL 339.2401(a)(iii) says a residential builder is a person that erects a residential structure except for the person's own use and occupancy on the person's property, and MCL 339.2403(b) exempts an owner of property with reference to a structure on the property for the owner's own use and occupancy. Own use and occupancy is the condition, so the exemption does not cover building to sell, and MCL 339.2403(c) limits owners of rental property to maintenance and alteration of that property. The statute sets no cap on how many times a homeowner may use the exemption; the only frequency rule in the article catches purchase, substantial rehabilitation, and resale of the same structure more than twice in 1 calendar year, and MCL 339.2401(b)(ii)(A) exempts work for the person's own use and occupancy from even that. Homeowners can also pull their own trade permits: electrical work in a single family home and accompanying outbuildings owned and occupied or to be occupied by the person doing the work (MCL 339.5737(3)(g)), their own plumbing, building sewer, or private sewer in their single-family dwelling if a permit is secured (MCL 339.6107(2)(d)), and a heating or refrigerating system if the owner affirms in the permit application that they are or will become the owner and occupant (MCL 339.5819). Confirm how Detroit applies this before you apply.

From the Library

What else needs a permit in Detroit

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsdeck area...under the BSEED Fee Schedule effective January 1, 2024, modified 7/18/2025: $2,000...
Electrical PermitIt dependselectrical alterations beyond replacing switches or receptacles...effective January 1, 2024, modified 7/18/2025, ELECTRICAL PART A: "Base fee"...
Fence PermitIt dependsfence height, for a fence outside a Special Review District...and RESIDENTIAL PERMITS, New Buildings, Alterations, Repairs, And Additions, $2,000...
HVAC PermitIt dependsBefore installing or altering any heating, cooling, gas piping, air distribution or......HOMEOWNER, "Central heating units, conversion burner, floor furnace, Each"...
Plumbing PermitIt dependsplumbing alterations beyond the working parts of a faucet or valve or clearance of stoppages...PLUMBING INSTALLATION PERMITS: "Application Fee (Non-Refundable), Flat"...
Pool PermitIt dependsprefabricated above-ground pool accessory to a Group R-3 occupancy holding not more than 5,000 gallons...under the BSEED Fee Schedule effective January 1, 2024, modified 7/18/2025: $2,000...
Roof Replacement PermitIt dependsroof-work beyond replacing a few shingles...under the BSEED Fee Schedule effective January 1, 2024, modified 7/18/2025: $2,000...
Solar PermitPermit requiredAny size...systems (per visit): Systems with NO connection to utility grid, Per visit...

Shed Permit in other Michigan localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not Detroit documents; the office above sets the local rules.

How this shed permit page for Detroit was verified. 2 official sources: detroitmi.gov, detroitmi.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Detroit Buildings, Safety Engineering and Environmental Department (BSEED). Rules change; confirm before you build. How we verify.