Pool Permit in Detroit, Michigan
It depends
Sometimes, depending on the project
Before installing an in-ground pool, or any pool that is 24 inches or more deep, holds more than 5,000 gallons, or is not a prefabricated above-ground unit.
Quick answer
BSEED's published list of work for which building permits are not required exempts only prefabricated swimming pools accessory to a Group R-3 occupancy that are less than 24 inches deep, hold no more than 5,000 gallons and are installed entirely above ground. Anything deeper, larger or built in ground falls back on the general building permit requirement. Separately, the Property Maintenance Code at 2019 Detroit City Code Sec. 8-15-109 requires every swimming pool to be entirely enclosed by a fence at least four feet high with a self-closing and self-latching gate and to be equipped with a water filtration device, and requires in-grade pools to have underwater lighting.
- Typical threshold
- prefabricated above-ground pool accessory to a Group R-3 occupancy holding not more than 5,000 gallons
- Issued by
- City of Detroit Buildings, Safety Engineering and Environmental Department (BSEED)
- Phone
- (313) 224-2372
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
Pool builders handle the permit and its safety requirements as part of the job. Comparing a few bids before you sign is the useful next step.
Compare pool builder quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What a pool permit costs in Detroit
- Fee schedule in force
- Official scheduleRead .
- Building permit fees are based on project cost under the BSEED Fee Schedule effective January 1, 2024, modified 7/18/2025: $2,000 or less, Flat $271.43;
- Over $2,000 but not over $25,000, First $2,000 Base $271.43 plus $34.09 Per $1,000 or fraction thereof over $2,000.
- Pool wiring is charged separately on the electrical schedule, PART A Base fee $66 plus $20 for each circuit.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How Detroit compares in Michigan
| Jurisdiction | Permit needed? | Threshold |
|---|---|---|
| Ann Arbor | Permit required | Any size |
| Detroitthis page | It depends | prefabricated above-ground pool accessory to a Group R-3 occupancy holding not more than 5,000 gallons |
| Grand Rapids | It depends | water depth a pool, hot tub, spa or similar structure is capable of reaching |
| Sterling Heights | It depends | pool or hot tub side wall height above which the permit package applies |
How to apply in Detroit
General guide, not specific to this office
What a pool permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a pool permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
City of Detroit Buildings, Safety Engineering and Environmental Department (BSEED)
- Development Resource Center, Coleman A. Young Municipal Center, 2 Woodward Avenue, Room 434, Detroit, MI 48226
- Phone: (313) 224-2372
- Email: DRC@detroitmi.gov
Your Pool Permit checklist for Detroit
- Confirm the requirement. Sometimes, depending on the project. Typical threshold: prefabricated above-ground pool accessory to a Group R-3 occupancy holding not more than 5,000 gallons. Read the rule where we read it: detroitmi.gov: buildings safety engineering and environmental department....
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Detroit permit portal.
- Keep the office details handy. City of Detroit Buildings, Safety Engineering and Environmental Department (BSEED). Phone: (313) 224-2372. Email: DRC@detroitmi.gov. Address: Development Resource Center, Coleman A. Young Municipal Center, 2 Woodward Avenue, Room 434, Detroit, MI 48226.
Compiled from the official sources on this page. Last checked .
Permitting activity in Detroit
In 2025, Detroit authorized permits for 2,620 new residential housing units (662 single-family, 1,958 in multi-family buildings), valued at $291M, up from 1,919 the year before. That works out to about 3.9 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 665,369.
What else needs a permit in Detroit
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | deck area | Building permit fees are based on project cost under the BSEED Fee Schedule effective January 1, 2024, modified 7/18/2025: $2,000 or less, Flat $271.43 |
| Electrical Permit | It depends | electrical alterations beyond replacing switches or receptacles | BSEED Fee Schedule effective January 1, 2024, modified 7/18/2025, ELECTRICAL PART A: "Base fee" $66 |
| Fence Permit | It depends | fence height, for a fence outside a Special Review District | See schedule |
| HVAC Permit | It depends | Before installing or altering any heating, cooling, gas piping, air distribution or... | See schedule |
| Plumbing Permit | It depends | plumbing alterations beyond the working parts of a faucet or valve or clearance of stoppages | BSEED Fee Schedule effective January 1, 2024, modified 7/18/2025, PLUMBING INSTALLATION PERMITS: "Application Fee (Non-Refundable), Flat" $73 |
| Roof Replacement Permit | It depends | roof-work beyond replacing a few shingles | Building permit fees are based on project cost under the BSEED Fee Schedule effective January 1, 2024, modified 7/18/2025: $2,000 or less, Flat $271.43 |
| Shed Permit | It depends | floor area of a one-story detached accessory structure in residential construction | Building permit fees are based on project cost under the BSEED Fee Schedule effective January 1, 2024, modified 7/18/2025: $2,000 or less, Flat $271.43 |
| Solar Permit | Permit required | Any size | Solar Photovoltaic systems (per visit): Systems with NO connection to utility grid, Per visit $165 |
Frequently asked questions
- Do you need a pool permit in Detroit?
- It depends on the project. Prefabricated above-ground pool accessory to a Group R-3 occupancy holding not more than 5,000 gallons. If you are unsure how that applies to your project, call the permit office at (313) 224-2372 before you start.
- How much does a pool permit cost in Detroit?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 15 Aug 2026. For the figure on your own project, call the permit office at (313) 224-2372.
- How long does a pool permit take in Detroit?
- In Detroit, a pool permit typically takes about 5 days for a residential building permit after the application is submitted. Times can vary by workload and project scope, so confirm with the office.
- Where do you apply for a pool permit in Detroit?
- You can apply through the Detroit permit portal or contact the City of Detroit Buildings, Safety Engineering and Environmental Department (BSEED) directly. The links are listed on this page.
- Can a homeowner pull a pool permit themselves in Detroit?
- Under Michigan law (MCL 339.2403(b), (c); MCL 339.2401(a)(iii), (b)(ii)(A); MCL 339.5737(3)(g); MCL 339.6107(2)(d); MCL 339.5819): Yes. A Michigan homeowner may pull the building permit and do the work on their own home without a residential builder license, because the licensing article both defines the trade to exclude them and exempts them outright. MCL 339.2401(a)(iii) says a residential builder is a person that erects a residential structure except for the person's own use and occupancy on the person's property, and MCL 339.2403(b) exempts an owner of property with reference to a structure on the property for the owner's own use and occupancy. Own use and occupancy is the condition, so the exemption does not cover building to sell, and MCL 339.2403(c) limits owners of rental property to maintenance and alteration of that property. The statute sets no cap on how many times a homeowner may use the exemption; the only frequency rule in the article catches purchase, substantial rehabilitation, and resale of the same structure more than twice in 1 calendar year, and MCL 339.2401(b)(ii)(A) exempts work for the person's own use and occupancy from even that. Homeowners can also pull their own trade permits: electrical work in a single family home and accompanying outbuildings owned and occupied or to be occupied by the person doing the work (MCL 339.5737(3)(g)), their own plumbing, building sewer, or private sewer in their single-family dwelling if a permit is secured (MCL 339.6107(2)(d)), and a heating or refrigerating system if the owner affirms in the permit application that they are or will become the owner and occupant (MCL 339.5819). Confirm how Detroit applies this before you apply.
From the Library
Pool Permit in other Michigan localities
Everything above, sourced
How this pool permit page for Detroit was verified. 2 official sources: detroitmi.gov, detroitmi.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Detroit Buildings, Safety Engineering and Environmental Department (BSEED). Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page