Pool Permit in Detroit, Michigan
It depends
Sometimes, depending on the project
Before installing an in-ground pool, or any pool that is 24 inches or more deep, holds more than 5,000 gallons, or is not a prefabricated above-ground unit.
By Mario Bailey, verified against official sources
Quick answer
BSEED's published list of work for which building permits are not required exempts only prefabricated swimming pools accessory to a Group R-3 occupancy that are less than 24 inches deep, hold no more than 5,000 gallons and are installed entirely above ground. Anything deeper, larger or built in ground falls back on the general building permit requirement. Separately, the Property Maintenance Code at 2019 Detroit City Code Sec. 8-15-109 requires every swimming pool to be entirely enclosed by a fence at least four feet high with a self-closing and self-latching gate and to be equipped with a water filtration device, and requires in-grade pools to have underwater lighting.
Typical threshold: prefabricated above-ground pool accessory to a Group R-3 occupancy holding not more than 5,000 gallons.
Who is pulling this permit?
Apply yourself
Hire it out
Before you sign, ask the contractor:
- Who pulls the permit, you or me, and is the permit fee included in the bid?
- Which inspections will this job need, and who meets the inspector on site?
- Is your contractor license active in this locality, and under which business name?
When a permit is usually needed
Before installing an in-ground pool, or any pool that is 24 inches or more deep, holds more than 5,000 gallons, or is not a prefabricated above-ground unit.
What a pool permit costs in Detroit
How Detroit compares in Michigan
| Jurisdiction | Permit needed? | Threshold |
|---|---|---|
| Ann Arbor | Permit required | Not specified |
| Detroitthis page | It depends | prefabricated above-ground pool accessory to a Group R-3 occupancy holding not more than 5,000 gallons |
| Grand Rapids | It depends | water depth a pool, hot tub, spa or similar structure is capable of reaching |
| Sterling Heights | It depends | pool or hot tub side wall height above which the permit package applies |
Closest pool permit thresholds outside Michigan
Jurisdictions we cover whose limit sits nearest Detroit's 24 inches in depth.
- Aurora, Colorado, pool depth at which a building permit is required
- Baton Rouge, Louisiana, prefabricated above ground pools that also hold less than 5,000 gallons
- Charleston, South Carolina, prefabricated swimming pools
- Cincinnati, Ohio, depth of a constructed pool serving a one-, two- or three-family dwelling
How to apply in Detroit
A residential pool permit application covers both construction and safety: a scaled site plan, structural plans for the pool, a barrier plan showing how the pool will be enclosed, and an electrical plan covering bonding and the equipment disconnect.
What most pool permit applications include:
- Pool and spa design and construction fall under the residential code chapter that folds in the swimming pool and spa code, and permit review checks plans against that chapter (IRC R326).
- The site plan must show pool equipment such as pumps, filters, and heaters set back at least 36 inches from the outside of the required barrier (ISPSC 305.2.9).
- For an in-ground pool, engineered structural plans covering the shell and reinforcing steel, with the responsible structural engineer's license information, are a standard part of the submittal (per official pool submittal checklists).
- A barrier plan identifying the fence, pool structure, or dwelling wall that will enclose the pool must be submitted and must comply with the code's barrier chapter (ISPSC 305).
- Electrical plans must show the pool's equipotential bonding design, since the shell, perimeter surfaces, and metal fittings within 5 feet of the water must all tie into a common bonding grid (NEC 680.26).
- The electrical plan must also show a disconnecting means for the pool equipment that is readily accessible and within sight of the equipment (NEC 680.13).
General submittal guidance from 2021 IRC R326 (adopting the ISPSC), ISPSC 2021 Section 305, and NEC 2020 Article 680. Source. City of Detroit Buildings, Safety Engineering and Environmental Department (BSEED) sets the exact checklist for Detroit.
Where to apply in Detroit:
City of Detroit Buildings, Safety Engineering and Environmental Department (BSEED)
- Development Resource Center, Coleman A. Young Municipal Center, 2 Woodward Avenue, Room 434, Detroit, MI 48226
- Phone: (313) 224-2372
- Email: DRC@detroitmi.gov
Inspections and closing out your permit
Pool inspections track the concrete pour: the steel and bonding grid are checked before gunite or shotcrete goes in, bonding is checked again before decking is poured, and the permanent barrier and remaining electrical work are checked at final before the pool can be filled and used.
- Before gunite or shotcrete is sprayed, the inspector checks the rebar against the engineered plans and confirms the equipotential bonding wire is stubbed out and tied into the steel, since it will be buried in concrete afterward (NEC 680.26).
- A bonding inspection separately confirms coping, decking, ladders, handrail cups, and any other metal within 5 feet of the water are tied to the bonding grid, and it must pass before coping is installed (NEC 680.26).
- A temporary barrier at least 4 feet high must enclose the site from the moment excavation starts until the permanent barrier is finished, and inspectors check for it throughout construction (ISPSC 305.1.1).
- A pre-plaster inspection confirms the circulation equipment's electrical work is installed and all bonding is complete before the pool's interior finish goes on (NEC 680.26).
- At final inspection the permanent barrier is checked against the code's requirements and the equipment and cover-mechanism bonding must be complete before the pool can be filled and used (ISPSC 305, NEC 680.26).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Detroit permit portal or by phone at (313) 224-2372.
Inspection sequence from NEC 2020 Article 680.26 (equipotential bonding) and ISPSC 2021 Section 305 (barriers). Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Pool Permit checklist for Detroit
- Confirm the requirement. Sometimes, depending on the project. Typical threshold: prefabricated above-ground pool accessory to a Group R-3 occupancy holding not more than 5,000 gallons. Usually needed: Before installing an in-ground pool, or any pool that is 24 inches or more deep, holds more than 5,000 gallons, or is not a prefabricated above-ground unit.
- Budget the fee. Building permit fees are based on project cost under the BSEED Fee Schedule effective January 1, 2024, modified 7/18/2025: $2,000 or less, Flat $271.43; Over $2,000 but not over $25,000, First $2,000 Base $271.43 plus $34.09 Per $1,000 or fraction thereof over $2,000. Pool wiring is charged separately on the electrical schedule, PART A Base fee $66 plus $20 for each circuit. Official fee schedule.
- Apply. A residential pool permit application covers both construction and safety: a scaled site plan, structural plans for the pool, a barrier plan showing how the pool will be enclosed, and an electrical plan covering bonding and the equipment disconnect. Start at the Detroit permit portal.
- Keep the office details handy. City of Detroit Buildings, Safety Engineering and Environmental Department (BSEED). Phone: (313) 224-2372. Address: Development Resource Center, Coleman A. Young Municipal Center, 2 Woodward Avenue, Room 434, Detroit, MI 48226.
- Plan for inspections. Pool inspections track the concrete pour: the steel and bonding grid are checked before gunite or shotcrete goes in, bonding is checked again before decking is poured, and the permanent barrier and remaining electrical work are checked at final before the pool can be filled and used.
Compiled from the official sources on this page. Last checked .
Frequently asked questions
- Do you need a pool permit in Detroit?
- BSEED's published list of work for which building permits are not required exempts only prefabricated swimming pools accessory to a Group R-3 occupancy that are less than 24 inches deep, hold no more than 5,000 gallons and are installed entirely above ground. Anything deeper, larger or built in ground falls back on the general building permit requirement. Separately, the Property Maintenance Code at 2019 Detroit City Code Sec. 8-15-109 requires every swimming pool to be entirely enclosed by a fence at least four feet high with a self-closing and self-latching gate and to be equipped with a water filtration device, and requires in-grade pools to have underwater lighting. Prefabricated above-ground pool accessory to a Group R-3 occupancy holding not more than 5,000 gallons. Always confirm with the office before starting.
- How much does a pool permit cost in Detroit?
- Building permit fees are based on project cost under the BSEED Fee Schedule effective January 1, 2024, modified 7/18/2025: $2,000 or less, Flat $271.43; Over $2,000 but not over $25,000, First $2,000 Base $271.43 plus $34.09 Per $1,000 or fraction thereof over $2,000. Pool wiring is charged separately on the electrical schedule, PART A Base fee $66 plus $20 for each circuit. See the official fee schedule for current amounts.
- How long does a pool permit take in Detroit?
- In Detroit, a pool permit typically takes about 5 days for a residential building permit after the application is submitted. Times can vary by workload and project scope, so confirm with the office.
- Where do you apply for a pool permit in Detroit?
- You can apply through the Detroit permit portal or contact the City of Detroit Buildings, Safety Engineering and Environmental Department (BSEED) directly. The links are listed on this page.
- Can a homeowner pull a pool permit themselves in Detroit?
- Under Michigan law (MCL 339.2403(b), (c); MCL 339.2401(a)(iii), (b)(ii)(A); MCL 339.5737(3)(g); MCL 339.6107(2)(d); MCL 339.5819): Yes. A Michigan homeowner may pull the building permit and do the work on their own home without a residential builder license, because the licensing article both defines the trade to exclude them and exempts them outright. MCL 339.2401(a)(iii) says a residential builder is a person that erects a residential structure except for the person's own use and occupancy on the person's property, and MCL 339.2403(b) exempts an owner of property with reference to a structure on the property for the owner's own use and occupancy. Own use and occupancy is the condition, so the exemption does not cover building to sell, and MCL 339.2403(c) limits owners of rental property to maintenance and alteration of that property. The statute sets no cap on how many times a homeowner may use the exemption; the only frequency rule in the article catches purchase, substantial rehabilitation, and resale of the same structure more than twice in 1 calendar year, and MCL 339.2401(b)(ii)(A) exempts work for the person's own use and occupancy from even that. Homeowners can also pull their own trade permits: electrical work in a single family home and accompanying outbuildings owned and occupied or to be occupied by the person doing the work (MCL 339.5737(3)(g)), their own plumbing, building sewer, or private sewer in their single-family dwelling if a permit is secured (MCL 339.6107(2)(d)), and a heating or refrigerating system if the owner affirms in the permit application that they are or will become the owner and occupant (MCL 339.5819). Confirm how Detroit applies this before you apply.
From the Library
What else needs a permit in Detroit
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | deck area | Building permit fees are based on project cost under the BSEED Fee Schedule effective... |
| Electrical Permit | It depends | electrical alterations beyond replacing switches or receptacles | BSEED Fee Schedule effective January 1, 2024, modified 7/18/2025, ELECTRICAL PART A:... |
| Fence Permit | It depends | fence height, for a fence outside a Special Review District | Fence work is priced as a building permit on project cost under the BSEED Fee Schedule... |
| HVAC Permit | It depends | Not specified | BSEED Fee Schedule effective January 1, 2024, modified 7/18/2025, GAS FIRED EQUIPMENT:... |
| Plumbing Permit | It depends | plumbing alterations beyond the working parts of a faucet or valve or clearance of stoppages | BSEED Fee Schedule effective January 1, 2024, modified 7/18/2025, PLUMBING INSTALLATION... |
| Roof Replacement Permit | It depends | roof-work beyond replacing a few shingles | Building permit fees are based on project cost under the BSEED Fee Schedule effective... |
| Shed Permit | It depends | floor area of a one-story detached accessory structure in residential construction | Building permit fees are based on project cost under the BSEED Fee Schedule effective... |
| Solar Permit | Permit required | Not specified | BSEED Fee Schedule effective January 1, 2024, modified 7/18/2025, PART E, RENEWABLE... |
Pool Permit in other Michigan localities
Everything above, sourced
Code references
National and state model-code sections the general guidance on this page is drawn from. They are not Detroit documents; the office above sets the local rules.
Verified by a person against the sources above on , not confirmed with City of Detroit Buildings, Safety Engineering and Environmental Department (BSEED). Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page
Permit office
City of Detroit Buildings, Safety Engineering and Environmental Department (BSEED)
(313) 224-2372Permit portalCompare
Pool Permit across Michigan