Michigan / Ann Arbor

Pool Permit in Ann Arbor, Michigan

Permit required

Yes, a permit is required

Before installing an above ground or in ground swimming pool, spa or hot tub, and before the associated wiring and plumbing work.

Quick answer

Ann Arbor issues a swimming pool permit through the Building Department and prices above ground pools as a flat $125 building permit line item. The fee schedule footnote makes clear that the pool permit does not cover the wiring or the water connections: separate plumbing and electrical permits are required, and the electrical schedule carries its own swimming pools, spas and hot tubs line. Pools are also treated as accessory buildings under the zoning ordinance, so accessory building setback, height and rear open space limits apply. The city publishes no size, depth or volume exemption for residential pools.

Issued by
City of Ann Arbor Building, Rental and Inspection Services (Construction and Building), with zoning review by Planning and Development Services
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

Pool builders handle the permit and its safety requirements as part of the job. Comparing a few bids before you sign is the useful next step.

Compare pool builder quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What a pool permit costs in Ann Arbor

Fee schedule in force
Official scheduleRead .
  • Building Permit Fees (effective October 2019, revised 7/15/2025) carries a flat line item: "Above Ground Swimming Pool* ... $125" with the footnote "(*requires separate Plumbing and Electrical permits)".
  • Electrical Permit Fees (effective January 2020) charge "Swimming Pools, Spas, Hot tubs ... $25" plus the $15 base application fee, with $35 per inspection.
  • An in ground pool has no flat line item and is charged on the estimated project cost permit fee scale plus the 20% plan examination fee.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Ann Arbor compares in Michigan

JurisdictionPermit needed?Threshold
Ann Arborthis pagePermit requiredAny size
DetroitIt dependsprefabricated above-ground pool accessory to a Group R-3 occupancy holding not more than 5,000 gallons
Grand RapidsIt dependswater depth a pool, hot tub, spa or similar structure is capable of reaching
Sterling HeightsIt dependspool or hot tub side wall height above which the permit package applies

How to apply in Ann Arbor

General guide, not specific to this office

What a pool permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a pool permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

City of Ann Arbor Building, Rental and Inspection Services (Construction and Building), with zoning review by Planning and Development Services

  • City Hall, 301 E. Huron St., Ann Arbor, MI 48104. Mailing: P.O. Box 8647, Ann Arbor, MI 48107-8647
  • Phone: 734.794.6263 ext. 0
  • Email: building@a2gov.org

Permitting activity in Ann Arbor

In 2025, Ann Arbor authorized permits for 557 new residential housing units (48 single-family, 509 in multi-family buildings), valued at $203M, up from 294 the year before. That works out to about 4.7 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 119,280.

What else needs a permit in Ann Arbor

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredAny sizeBuilding Permit Fees (effective October 2019, revised 7/15/2025): $15 base application fee for all permits; the schedule has the rest
Electrical PermitPermit requiredAny sizeElectrical Permit Fees (effective January 2020): $15 base application fee for all permits, non refundable with no inspections included, plus $35 each inspection
Fence PermitPermit requiredAny sizeA fence 7 feet or less takes a "Zoning Compliance Permit - Fence Permit" at $80 under Planning Review Fees (effective 7/1/2026 for FY2027)
HVAC PermitPermit requiredAny sizeMechanical Permit Fees (effective July 1, 2017): $15 base application fee required for all permits, non refundable with no inspections, plus $35 each inspection
Patio PermitIt dependsBefore pouring or laying a patio that costs more than $100 or covers 100 square feet or...See schedule
Plumbing PermitPermit requiredAny sizePlumbing Permit Fees (effective July 1, 2017): $15 base application fee required for all permits, non refundable and no inspections, plus $35 each inspection
Roof Replacement PermitIt dependsBefore reroofing or recovering an existing flat roofSee schedule
Shed PermitPermit requiredAny sizeSee schedule
Solar PermitPermit requiredAny sizeSee schedule

Frequently asked questions

Do you need a pool permit in Ann Arbor?
Yes, before installing an above ground or in ground swimming pool, spa or hot tub, and before the associated wiring and plumbing work. If you are unsure how that applies to your project, call the permit office at 734.794.6263 ext. 0 before you start.
How much does a pool permit cost in Ann Arbor?
The fee wording from the official schedule is in the cost table on this page, as we read it on 15 Aug 2026. For the figure on your own project, call the permit office at 734.794.6263 ext. 0.
Where do you apply for a pool permit in Ann Arbor?
You can apply through the Ann Arbor permit portal or contact the City of Ann Arbor Building, Rental and Inspection Services (Construction and Building), with zoning review by Planning and Development Services directly. The links are listed on this page.
Can a homeowner pull a pool permit themselves in Ann Arbor?
Under Michigan law (MCL 339.2403(b), (c); MCL 339.2401(a)(iii), (b)(ii)(A); MCL 339.5737(3)(g); MCL 339.6107(2)(d); MCL 339.5819): Yes. A Michigan homeowner may pull the building permit and do the work on their own home without a residential builder license, because the licensing article both defines the trade to exclude them and exempts them outright. MCL 339.2401(a)(iii) says a residential builder is a person that erects a residential structure except for the person's own use and occupancy on the person's property, and MCL 339.2403(b) exempts an owner of property with reference to a structure on the property for the owner's own use and occupancy. Own use and occupancy is the condition, so the exemption does not cover building to sell, and MCL 339.2403(c) limits owners of rental property to maintenance and alteration of that property. The statute sets no cap on how many times a homeowner may use the exemption; the only frequency rule in the article catches purchase, substantial rehabilitation, and resale of the same structure more than twice in 1 calendar year, and MCL 339.2401(b)(ii)(A) exempts work for the person's own use and occupancy from even that. Homeowners can also pull their own trade permits: electrical work in a single family home and accompanying outbuildings owned and occupied or to be occupied by the person doing the work (MCL 339.5737(3)(g)), their own plumbing, building sewer, or private sewer in their single-family dwelling if a permit is secured (MCL 339.6107(2)(d)), and a heating or refrigerating system if the owner affirms in the permit application that they are or will become the owner and occupant (MCL 339.5819). Confirm how Ann Arbor applies this before you apply.

From the Library

Pool Permit in other Michigan localities

Everything above, sourced

How this pool permit page for Ann Arbor was verified. 2 official sources: a2gov.org, a2gov.org; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Ann Arbor Building, Rental and Inspection Services (Construction and Building), with zoning review by Planning and Development Services. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Permit required
Check my project