Michigan / Ann Arbor

Roof Replacement Permit in Ann Arbor, Michigan

It depends

Sometimes, depending on the project

Before reroofing or recovering an existing flat roof. Not needed to replace a sloped asphalt shingle or metal roof.

Quick answer

Ann Arbor draws the roofing permit line by roof type rather than by area or cost. The city's expedited residential permits handout states that sloped asphalt shingled and metal roofs do not require a permit, while reroofing or recovering an existing flat roof does and is one of the work types eligible for expedited plan review. A flat roof submittal must show the location of work plus the membrane specification, the parapet condition where applicable, the slope and direction of drainage, and the replacement insulation R value. Structural changes to a roof, as opposed to a like for like covering replacement, still fall under the ordinary building permit rules.

Issued by
City of Ann Arbor Building, Rental and Inspection Services (Construction and Building), with zoning review by Planning and Development Services
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

Roofers handle the permit in most localities when one is required. Comparing bids before you sign is the useful next step.

Compare roofing quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What a roof replacement permit costs in Ann Arbor

Fee schedule in force
Official scheduleRead .
  • No roofing line item is published.
  • A flat roof reroof or recover pays the $15 base application fee plus the estimated project cost permit fee ($100 for cost up to $1,000; $100 plus $10 per $1,000 from $1,000 to $50,000) plus a plan examination fee of 20% of the building permit fee, under the Building Permit Fees schedule effective October 2019 and revised 7/15/2025.
  • Expedited plan review adds a $15 expedited plan review fee.
  • Properties in a historic district also pay $35 for historic district staff review.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Ann Arbor compares in Michigan

JurisdictionPermit needed?Threshold
Ann Arborthis pageIt dependsBefore reroofing or recovering an existing flat roof
DetroitIt dependsroof-work beyond replacing a few shingles
Grand RapidsPermit requiredAny size
Sterling HeightsPermit requiredAny size

How to apply in Ann Arbor

General guide, not specific to this office

What a roof replacement permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a roof replacement permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

City of Ann Arbor Building, Rental and Inspection Services (Construction and Building), with zoning review by Planning and Development Services

  • City Hall, 301 E. Huron St., Ann Arbor, MI 48104. Mailing: P.O. Box 8647, Ann Arbor, MI 48107-8647
  • Phone: 734.794.6263 ext. 0
  • Email: building@a2gov.org

Permitting activity in Ann Arbor

In 2025, Ann Arbor authorized permits for 557 new residential housing units (48 single-family, 509 in multi-family buildings), valued at $203M, up from 294 the year before. That works out to about 4.7 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 119,280.

What else needs a permit in Ann Arbor

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredAny sizeBuilding Permit Fees (effective October 2019, revised 7/15/2025): $15 base application fee for all permits; the schedule has the rest
Electrical PermitPermit requiredAny sizeElectrical Permit Fees (effective January 2020): $15 base application fee for all permits, non refundable with no inspections included, plus $35 each inspection
Fence PermitPermit requiredAny sizeThe Planning Services Fence Guidelines handout (revised 3/3/2025) states a flat Fence Permit Fee of $75.00
HVAC PermitPermit requiredAny sizeMechanical Permit Fees (effective July 1, 2017): $15 base application fee required for all permits, non refundable with no inspections, plus $35 each inspection
Patio PermitIt dependsBefore pouring or laying a patio that costs more than $100 or covers 100 square feet or...See schedule
Plumbing PermitPermit requiredAny sizePlumbing Permit Fees (effective July 1, 2017): $15 base application fee required for all permits, non refundable and no inspections, plus $35 each inspection
Pool PermitPermit requiredAny sizeSee schedule
Shed PermitPermit requiredAny sizeSee schedule
Solar PermitPermit requiredAny sizeSee schedule

Frequently asked questions

Do you need a roof replacement permit in Ann Arbor?
Sometimes: before reroofing or recovering an existing flat roof. Not needed to replace a sloped asphalt shingle or metal roof. If you are unsure how that applies to your project, call the permit office at 734.794.6263 ext. 0 before you start.
How much does a roof replacement permit cost in Ann Arbor?
The fee wording from the official schedule is in the cost table on this page, as we read it on 15 Aug 2026. For the figure on your own project, call the permit office at 734.794.6263 ext. 0.
Where do you apply for a roof replacement permit in Ann Arbor?
You can apply through the Ann Arbor permit portal or contact the City of Ann Arbor Building, Rental and Inspection Services (Construction and Building), with zoning review by Planning and Development Services directly. The links are listed on this page.
Can a homeowner pull a roof replacement permit themselves in Ann Arbor?
Under Michigan law (MCL 339.2403(b), (c); MCL 339.2401(a)(iii), (b)(ii)(A); MCL 339.5737(3)(g); MCL 339.6107(2)(d); MCL 339.5819): Yes. A Michigan homeowner may pull the building permit and do the work on their own home without a residential builder license, because the licensing article both defines the trade to exclude them and exempts them outright. MCL 339.2401(a)(iii) says a residential builder is a person that erects a residential structure except for the person's own use and occupancy on the person's property, and MCL 339.2403(b) exempts an owner of property with reference to a structure on the property for the owner's own use and occupancy. Own use and occupancy is the condition, so the exemption does not cover building to sell, and MCL 339.2403(c) limits owners of rental property to maintenance and alteration of that property. The statute sets no cap on how many times a homeowner may use the exemption; the only frequency rule in the article catches purchase, substantial rehabilitation, and resale of the same structure more than twice in 1 calendar year, and MCL 339.2401(b)(ii)(A) exempts work for the person's own use and occupancy from even that. Homeowners can also pull their own trade permits: electrical work in a single family home and accompanying outbuildings owned and occupied or to be occupied by the person doing the work (MCL 339.5737(3)(g)), their own plumbing, building sewer, or private sewer in their single-family dwelling if a permit is secured (MCL 339.6107(2)(d)), and a heating or refrigerating system if the owner affirms in the permit application that they are or will become the owner and occupant (MCL 339.5819). Confirm how Ann Arbor applies this before you apply.

From the Library

Roof Replacement Permit in other Michigan localities

Everything above, sourced

How this roof replacement permit page for Ann Arbor was verified. 2 official sources: a2gov.org, a2gov.org; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Ann Arbor Building, Rental and Inspection Services (Construction and Building), with zoning review by Planning and Development Services. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

It depends
Check my project