Michigan / Ann Arbor

Solar Permit in Ann Arbor, Michigan

Permit required

Yes, a permit is required

Before installing a rooftop or ground mounted photovoltaic system, including replacement of an existing array.

Quick answer

Ann Arbor requires a permit for solar but has stripped the process down for ordinary residential rooftop systems: the expedited track needs only an electrical permit, with the application fee waived and the residential solar panel line item set to $0. Systems that do not qualify for the expedited track, including residential rooftop solar with battery storage, need an electrical permit plus a building permit plus a zoning permit, and the building permit for solar is charged on a flat scale rather than the usual percentage plan review. Commercial solar is priced by panel count. The city also publishes roof top access and ventilation requirements for solar installations.

Issued by
City of Ann Arbor Building, Rental and Inspection Services (Construction and Building), with zoning review by Planning and Development Services
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your Michigan Department of Licensing and Regulatory Affairs (LARA) license active, and under which business name? Verify it on aca-prod.accela.com.

Michigan's owner-builder rule (MCL 339.2403(b), (c); MCL 339.2401(a)(iii), (b)(ii)(A); MCL 339.5737(3)(g); MCL 339.6107(2)(d); MCL 339.5819) sets what you may do on your own home without hiring anyone. Read the statute.

What a solar permit costs in Ann Arbor

Fee schedule in force
Official scheduleRead .
  • For expedited residential solar the Solar Photovoltaic (PV) System Permitting Checklist shows the electric permit basic application fee WAIVED, residential solar panels $0.00, and inspection $35.00 if applicable, with no building permit.
  • Electrical Permit Fees (effective January 2020) confirm the residential line "Solar Panels per set of 3 panels ... $0".
  • Non expedited residential and commercial solar also pays a building permit under the Building Permit Fees schedule (revised 7/15/2025) flat solar scale: estimated cost $0 to $10,000 is a $37.50 plan examination fee plus a $150 permit fee;
  • $10,001 to $50,000 is $75 plus $200;
  • over $50,000 is $100 plus $400.
  • The building plan examination fee of 20% expressly excludes solar permits.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Ann Arbor compares in Michigan

No Michigan jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.

JurisdictionPermit needed?Typical fee
Ann Arborthis pagePermit requiredSee schedule
DetroitPermit requiredSolar Photovoltaic systems (per visit): Systems with NO connection to utility grid, Per visit $165
Grand RapidsPermit requiredSee schedule
Sterling HeightsPermit requiredBuilding Permit Application 26-27 fee chart: 'Solar Panels' $153.00, plus the non-refundable $56.00 application fee

How to apply in Ann Arbor

General guide, not specific to this office

What a solar permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a solar permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

City of Ann Arbor Building, Rental and Inspection Services (Construction and Building), with zoning review by Planning and Development Services

  • City Hall, 301 E. Huron St., Ann Arbor, MI 48104. Mailing: P.O. Box 8647, Ann Arbor, MI 48107-8647
  • Phone: 734.794.6263 ext. 0
  • Email: building@a2gov.org

Permitting activity in Ann Arbor

In 2025, Ann Arbor authorized permits for 557 new residential housing units (48 single-family, 509 in multi-family buildings), valued at $203M, up from 294 the year before. That works out to about 4.7 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 119,280.

What else needs a permit in Ann Arbor

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredAny sizeBuilding Permit Fees (effective October 2019, revised 7/15/2025): $15 base application fee for all permits; the schedule has the rest
Electrical PermitPermit requiredAny sizeElectrical Permit Fees (effective January 2020): $15 base application fee for all permits, non refundable with no inspections included, plus $35 each inspection
Fence PermitPermit requiredAny sizeA fence 7 feet or less takes a "Zoning Compliance Permit - Fence Permit" at $80 under Planning Review Fees (effective 7/1/2026 for FY2027)
HVAC PermitPermit requiredAny sizeMechanical Permit Fees (effective July 1, 2017): $15 base application fee required for all permits, non refundable with no inspections, plus $35 each inspection
Patio PermitIt dependsBefore pouring or laying a patio that costs more than $100 or covers 100 square feet or...See schedule
Plumbing PermitPermit requiredAny sizePlumbing Permit Fees (effective July 1, 2017): $15 base application fee required for all permits, non refundable and no inspections, plus $35 each inspection
Pool PermitPermit requiredAny sizeSee schedule
Roof Replacement PermitIt dependsBefore reroofing or recovering an existing flat roofSee schedule
Shed PermitPermit requiredAny sizeSee schedule

Frequently asked questions

Do you need a solar permit in Ann Arbor?
Yes, before installing a rooftop or ground mounted photovoltaic system, including replacement of an existing array. If you are unsure how that applies to your project, call the permit office at 734.794.6263 ext. 0 before you start.
How much does a solar permit cost in Ann Arbor?
The fee wording from the official schedule is in the cost table on this page, as we read it on 15 Aug 2026. For the figure on your own project, call the permit office at 734.794.6263 ext. 0.
How long does a solar permit take in Ann Arbor?
Expedited residential 3 to 5 business days; non expedited residential and commercial 5 to 10 business days. Times can vary by workload and project scope, so confirm with the office.
Where do you apply for a solar permit in Ann Arbor?
You can apply through the Ann Arbor permit portal or contact the City of Ann Arbor Building, Rental and Inspection Services (Construction and Building), with zoning review by Planning and Development Services directly. The links are listed on this page.
Can a homeowner pull a solar permit themselves in Ann Arbor?
Under Michigan law (MCL 339.2403(b), (c); MCL 339.2401(a)(iii), (b)(ii)(A); MCL 339.5737(3)(g); MCL 339.6107(2)(d); MCL 339.5819): Yes. A Michigan homeowner may pull the building permit and do the work on their own home without a residential builder license, because the licensing article both defines the trade to exclude them and exempts them outright. MCL 339.2401(a)(iii) says a residential builder is a person that erects a residential structure except for the person's own use and occupancy on the person's property, and MCL 339.2403(b) exempts an owner of property with reference to a structure on the property for the owner's own use and occupancy. Own use and occupancy is the condition, so the exemption does not cover building to sell, and MCL 339.2403(c) limits owners of rental property to maintenance and alteration of that property. The statute sets no cap on how many times a homeowner may use the exemption; the only frequency rule in the article catches purchase, substantial rehabilitation, and resale of the same structure more than twice in 1 calendar year, and MCL 339.2401(b)(ii)(A) exempts work for the person's own use and occupancy from even that. Homeowners can also pull their own trade permits: electrical work in a single family home and accompanying outbuildings owned and occupied or to be occupied by the person doing the work (MCL 339.5737(3)(g)), their own plumbing, building sewer, or private sewer in their single-family dwelling if a permit is secured (MCL 339.6107(2)(d)), and a heating or refrigerating system if the owner affirms in the permit application that they are or will become the owner and occupant (MCL 339.5819). Confirm how Ann Arbor applies this before you apply.

From the Library

Solar Permit in other Michigan localities

Everything above, sourced

How this solar permit page for Ann Arbor was verified. 2 official sources: a2gov.org, a2gov.org; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Ann Arbor Building, Rental and Inspection Services (Construction and Building), with zoning review by Planning and Development Services. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Permit required
Check my project