Solar Permit in Sterling Heights, Michigan
Permit required
Yes, a permit is required
Before installing roof-mounted, ground-mounted or building-integrated solar
Quick answer
Sterling Heights lists 'Solar panels' on its published list of work requiring a building permit, and SOLAR PANEL is a checkbox in the Description of Work section of the city's own Building Permit Application. The building permit carries a $153.00 solar panel fee, the highest miscellaneous residential line on the schedule. A separate electrical permit is also required, priced by system size in KVA. Zoning Ordinance No. 278 was amended to allow solar energy systems as accessory structures: roof-mounted systems in all zoning districts, capped at 10 feet above the finished roof at maximum tilt, and ground-mounted systems in all districts except P-1 and floodplain areas, capped at 15 feet (10 feet on residential lots of a quarter acre or less), limited to 20 percent lot coverage and required to sit in the rear yard at least 3 feet from any property line in the one-family and two-family districts.
- Issued by
- City of Sterling Heights Office of Building (Building Division), Office of City Development
- Phone
- 586-446-2360
Who is pulling this permit?
Apply yourself
Hire it out
Before you sign, ask the contractor:
- Who pulls the permit, you or me, and is the permit fee included in the bid?
- Which inspections will this job need, and who meets the inspector on site?
- Is your Michigan Department of Licensing and Regulatory Affairs (LARA) license active, and under which business name? Verify it on aca-prod.accela.com.
Michigan's owner-builder rule (MCL 339.2403(b), (c); MCL 339.2401(a)(iii), (b)(ii)(A); MCL 339.5737(3)(g); MCL 339.6107(2)(d); MCL 339.5819) sets what you may do on your own home without hiring anyone. Read the statute.
What a solar permit costs in Sterling Heights
- Fee schedule in force
- Official scheduleRead .
- Published in
- Building Permit Application 26-27 fee chart:
'Solar Panels' $153.00, plus the non-refundable $56.00 application fee.
Electrical Permit Application 26-27 has its own SOLAR PANELS block: 'Up to 10 KVA' $34.00, '11 to 30 KVA' $44.00, '31 to 50 KVA' $57.00, '51 KVA or more' $69.00, plus the $55.00 non-refundable electrical application fee.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How Sterling Heights compares in Michigan
No Michigan jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.
| Jurisdiction | Permit needed? | Typical fee |
|---|---|---|
| Ann Arbor | Permit required | See schedule |
| Detroit | Permit required | Solar Photovoltaic systems (per visit): Systems with NO connection to utility grid, Per visit $165 |
| Grand Rapids | Permit required | See schedule |
| Sterling Heightsthis page | Permit required | Building Permit Application 26-27 fee chart: 'Solar Panels' $153.00, plus the non-refundable $56.00 application fee |
How to apply in Sterling Heights
General guide, not specific to this office
What a solar permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a solar permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
City of Sterling Heights Office of Building (Building Division), Office of City Development
- 40555 Utica Road, Sterling Heights, MI 48313
- Phone: 586-446-2360
- Email: bldg@sterlingheights.gov
Your Solar Permit checklist for Sterling Heights
- Confirm the requirement. Yes, a permit is required. Read the rule where we read it: sterlingheights.gov: Building.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Sterling Heights permit portal.
- Keep the office details handy. City of Sterling Heights Office of Building (Building Division), Office of City Development. Phone: 586-446-2360. Email: bldg@sterlingheights.gov. Address: 40555 Utica Road, Sterling Heights, MI 48313.
Compiled from the official sources on this page. Last checked .
Permitting activity in Sterling Heights
In 2025, Sterling Heights authorized permits for 672 new residential housing units (47 single-family, 625 in multi-family buildings), valued at $70M, up from 70 the year before. That works out to about 5.1 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 131,709.
What else needs a permit in Sterling Heights
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | Permit required | Any size | Building Permit Application 26-27 fee chart: 'Deck/Porch' $78.00, plus the non-refundable $56.00 application fee |
| Electrical Permit | It depends | Before any electrical work, including work that reuses existing wiring | Electrical Permit Application 26-27: non-refundable application fee $55.00, then per item |
| Fence Permit | Permit required | Any size | Fence Permit Application 2026-2027 (revised 8/12/2026) fee box: WOOD $46, METAL $46, WIRE $46, PVC $46, MASONRY $134, SEPARATION $134 |
| HVAC Permit | Permit required | Any size | Mechanical Permit Application 2026-2027: non-refundable application fee $55.00, then per item |
| Patio Permit | It depends | Before pouring or replacing concrete other than a flat backyard patio poured on grade... | Where a concrete permit is required, Building Permit Application 26-27 fee chart: 'Concrete' $78.00, plus the non-refundable $56.00 application fee |
| Plumbing Permit | Permit required | Any size | Plumbing Permit Application 2026-2027: non-refundable application fee $55.00, then per fixture |
| Pool Permit | It depends | pool or hot tub side wall height above which the permit package applies | Building Permit Application 26-27 fee chart: 'Swimming pool (Above Ground)' $78.00, 'Swimming pool (Below Ground)' $160.00; the schedule has the rest |
| Roof Replacement Permit | Permit required | Any size | Building Permit Application 26-27 fee chart: 'Roof or Re-roof' $78.00, plus the non-refundable $56.00 application fee |
| Shed Permit | It depends | shed floor area above which a building permit is required | Building Permit Application 26-27 fee chart: 'Sheds (Between 50 - 200 sq. ft)' $78.00, plus the non-refundable $56.00 application fee |
Frequently asked questions
- Do you need a solar permit in Sterling Heights?
- Yes, before installing roof-mounted, ground-mounted or building-integrated solar. If you are unsure how that applies to your project, call the permit office at 586-446-2360 before you start.
- How much does a solar permit cost in Sterling Heights?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 15 Aug 2026. For the figure on your own project, call the permit office at 586-446-2360.
- Where do you apply for a solar permit in Sterling Heights?
- You can apply through the Sterling Heights permit portal or contact the City of Sterling Heights Office of Building (Building Division), Office of City Development directly. The links are listed on this page.
- Can a homeowner pull a solar permit themselves in Sterling Heights?
- Under Michigan law (MCL 339.2403(b), (c); MCL 339.2401(a)(iii), (b)(ii)(A); MCL 339.5737(3)(g); MCL 339.6107(2)(d); MCL 339.5819): Yes. A Michigan homeowner may pull the building permit and do the work on their own home without a residential builder license, because the licensing article both defines the trade to exclude them and exempts them outright. MCL 339.2401(a)(iii) says a residential builder is a person that erects a residential structure except for the person's own use and occupancy on the person's property, and MCL 339.2403(b) exempts an owner of property with reference to a structure on the property for the owner's own use and occupancy. Own use and occupancy is the condition, so the exemption does not cover building to sell, and MCL 339.2403(c) limits owners of rental property to maintenance and alteration of that property. The statute sets no cap on how many times a homeowner may use the exemption; the only frequency rule in the article catches purchase, substantial rehabilitation, and resale of the same structure more than twice in 1 calendar year, and MCL 339.2401(b)(ii)(A) exempts work for the person's own use and occupancy from even that. Homeowners can also pull their own trade permits: electrical work in a single family home and accompanying outbuildings owned and occupied or to be occupied by the person doing the work (MCL 339.5737(3)(g)), their own plumbing, building sewer, or private sewer in their single-family dwelling if a permit is secured (MCL 339.6107(2)(d)), and a heating or refrigerating system if the owner affirms in the permit application that they are or will become the owner and occupant (MCL 339.5819). Confirm how Sterling Heights applies this before you apply.
From the Library
Solar Permit in other Michigan localities
Everything above, sourced
How this solar permit page for Sterling Heights was verified. 2 official sources: sterlingheights.gov, sterlingheights.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Sterling Heights Office of Building (Building Division), Office of City Development. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page