Building permits in Sterling Heights, Michigan
Of the 10 common home projects we have verified in Sterling Heights, 6 need a permit outright and 4 depend on size or scope. Click any project for the full rule, fee, and how to apply.
- Project types verified
- 10in Sterling Heights
City of Sterling Heights Office of Building (Building Division), Office of City Development
- 40555 Utica Road, Sterling Heights, MI 48313
- Phone: 586-446-2360
- Email: bldg@sterlingheights.gov
- Official permit page
- Permit portal
- Official fee schedule
Look up a permit in Sterling Heights
Sterling Heights runs an online permit portal. We have not confirmed what its record search covers.
What needs a permit in Sterling Heights
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | Permit required | Any size | Building Permit Application 26-27 fee chart: 'Deck/Porch' $78.00, plus the non-refundable $56.00 application fee |
| Electrical Permit | It depends | Before any electrical work, including work that reuses existing wiring | Electrical Permit Application 26-27: non-refundable application fee $55.00, then per item |
| Fence Permit | Permit required | Any size | Fence Permit Application 2026-2027 (revised 8/12/2026) fee box: WOOD $46, METAL $46, WIRE $46, PVC $46, MASONRY $134, SEPARATION $134 |
| HVAC Permit | Permit required | Any size | Mechanical Permit Application 2026-2027: non-refundable application fee $55.00, then per item |
| Patio Permit | It depends | Before pouring or replacing concrete other than a flat backyard patio poured on grade... | Where a concrete permit is required, Building Permit Application 26-27 fee chart: 'Concrete' $78.00, plus the non-refundable $56.00 application fee |
| Plumbing Permit | Permit required | Any size | Plumbing Permit Application 2026-2027: non-refundable application fee $55.00, then per fixture |
| Pool Permit | It depends | pool or hot tub side wall height above which the permit package applies | Building Permit Application 26-27 fee chart: 'Swimming pool (Above Ground)' $78.00, 'Swimming pool (Below Ground)' $160.00; the schedule has the rest |
| Roof Replacement Permit | Permit required | Any size | Building Permit Application 26-27 fee chart: 'Roof or Re-roof' $78.00, plus the non-refundable $56.00 application fee |
| Shed Permit | It depends | shed floor area above which a building permit is required | Building Permit Application 26-27 fee chart: 'Sheds (Between 50 - 200 sq. ft)' $78.00, plus the non-refundable $56.00 application fee |
| Solar Permit | Permit required | Any size | Building Permit Application 26-27 fee chart: 'Solar Panels' $153.00, plus the non-refundable $56.00 application fee |
Planning a project in Sterling Heights?
Hire it out
Sponsored
Licensed contractors usually pull the permit as part of the job. Comparing a few local quotes before you commit is the useful next step.
Compare local contractor quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
Planning several things at once? Check your whole project
Sterling Heights permit fees compared with nearby Michigan localities
| Michigan locality | Deck Permit | HVAC Permit | Electrical Permit |
|---|---|---|---|
| Sterling Heights | Building Permit Application 26-27 fee chart: 'Deck/Porch' $78.00, plus the non-refundable $56.00 application fee | Mechanical Permit Application 2026-2027: non-refundable application fee $55.00, then per item | Electrical Permit Application 26-27: non-refundable application fee $55.00, then per item |
| Ann Arbor | See schedule | Mechanical Permit Fees (effective July 1, 2017): $15 base application fee required for all permits; the schedule has the rest | Electrical Permit Fees (effective January 2020): $15 base application fee for all permits; the schedule has the rest |
| Detroit | See schedule | See schedule | BSEED Fee Schedule effective January 1, 2024, modified 7/18/2025, ELECTRICAL PART A: "Base fee" $66 |
| Grand Rapids | See schedule | See schedule | See schedule |
Each cell is taken from that Michigan jurisdiction's own fee schedule; the full wording and source sit on each permit page.
Sterling Heights permit questions, answered from the data
- Do you need a permit in Sterling Heights?
- For most projects, yes. Of the 10 permit types we cover in Sterling Heights, 6 always require a permit (for example a deck permit) and 4 depend on size or scope (an electrical permit, for instance). Each Sterling Heights permit type's page states the exact rule and its source.
- How much does a permit cost in Sterling Heights?
- Sterling Heights publishes a fee for 10 of the 10 permit types we cover, each quoted on its page from the jurisdiction's own schedule (linked on every page that carries one). Fees are set by City of Sterling Heights Office of Building (Building Division), Office of City Development; we do not estimate or mark them up.
- Where do you apply for a permit in Sterling Heights?
- City of Sterling Heights Office of Building (Building Division), Office of City Development issues permits in Sterling Heights and has an online permit portal, and takes questions at 586-446-2360. The Sterling Heights official page and portal are linked in the office section above.
How the Sterling Heights pages were verified. 10 permit types, 5 distinct official sources, most recently checked . Every rule is read from City of Sterling Heights Office of Building (Building Division), Office of City Development or the applicable code and cited on its page; anything we could not confirm for Sterling Heights is marked rather than estimated. How we verify.
Permitting activity in Sterling Heights
In 2025, Sterling Heights authorized permits for 672 new residential housing units (47 single-family, 625 in multi-family buildings), valued at $70M , up from 70 the year before. That works out to about 5.1 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 131,709.