Electrical Permit in Sterling Heights, Michigan

It depends

Sometimes, depending on the project

Before any electrical work, including work that reuses existing wiring

Quick answer

Electrical is one of the three trade permits on the Building Department's published permits-required list, and the city's guidance is that an electrical permit is required for any electrical work, in some cases even for pool replacements, and that a permit is required even if the electrical is existing. The one exemption the city publishes is narrow: in most cases no electrical permit is needed for a storable pool as long as the pool pump motor plugs into an existing GFCI receptacle. Permits should be secured by the person doing the work and can be applied for online. Per Fire Marshal Bulletin P20-19, residential electrical services may not exceed 200 amps, and any request for a residential service over 200 amps must include an electric load information sheet supplied by a licensed electrician.

Issued by
City of Sterling Heights Office of Building (Building Division), Office of City Development
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

Electrical permits are usually pulled by the licensed electrician doing the job. If you are still choosing one, compare a few quotes first.

Compare electrician quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What an electrical permit costs in Sterling Heights

Fee schedule in force
Official scheduleRead .
Published in
Electrical Permit Application 26-27:

non-refundable application fee $55.00, then per item.

Each Circuit $28.00, Fixtures each 25 $28.00, Furnace Wiring $39.00, Air Conditioner Reconnect $39.00, Service up to 100 Amps $34.00, Service 101 up to 200 Amps $44.00, Swimming pools / Hot Tubs $63.00, Water Heater $34.00, Range $34.00, Dryer $34.00, Generator Connection $57.00, EV Charger $33.00, Alterations to existing system $75.00, General repairs $65.00, Re-establish expired permit $77.00.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Sterling Heights compares in Michigan

JurisdictionPermit needed?Threshold
Ann ArborPermit requiredAny size
DetroitIt dependselectrical alterations beyond replacing switches or receptacles
Grand RapidsIt dependsBefore altering, changing or adding to the electrical equipment or wiring of a home
Sterling Heightsthis pageIt dependsBefore any electrical work, including work that reuses existing wiring

How to apply in Sterling Heights

General guide, not specific to this office

What an electrical permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how an electrical permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

City of Sterling Heights Office of Building (Building Division), Office of City Development

Permitting activity in Sterling Heights

In 2025, Sterling Heights authorized permits for 672 new residential housing units (47 single-family, 625 in multi-family buildings), valued at $70M, up from 70 the year before. That works out to about 5.1 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 131,709.

What else needs a permit in Sterling Heights

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredAny sizeBuilding Permit Application 26-27 fee chart: 'Deck/Porch' $78.00, plus the non-refundable $56.00 application fee
Fence PermitPermit requiredAny sizeFence Permit Application 2026-2027 (revised 8/12/2026) fee box: WOOD $46, METAL $46, WIRE $46, PVC $46, MASONRY $134, SEPARATION $134
HVAC PermitPermit requiredAny sizeMechanical Permit Application 2026-2027: non-refundable application fee $55.00, then per item
Patio PermitIt dependsBefore pouring or replacing concrete other than a flat backyard patio poured on grade...Where a concrete permit is required, Building Permit Application 26-27 fee chart: 'Concrete' $78.00, plus the non-refundable $56.00 application fee
Plumbing PermitPermit requiredAny sizePlumbing Permit Application 2026-2027: non-refundable application fee $55.00, then per fixture
Pool PermitIt dependspool or hot tub side wall height above which the permit package appliesBuilding Permit Application 26-27 fee chart: 'Swimming pool (Above Ground)' $78.00, 'Swimming pool (Below Ground)' $160.00; the schedule has the rest
Roof Replacement PermitPermit requiredAny sizeBuilding Permit Application 26-27 fee chart: 'Roof or Re-roof' $78.00, plus the non-refundable $56.00 application fee
Shed PermitIt dependsshed floor area above which a building permit is requiredBuilding Permit Application 26-27 fee chart: 'Sheds (Between 50 - 200 sq. ft)' $78.00, plus the non-refundable $56.00 application fee
Solar PermitPermit requiredAny sizeBuilding Permit Application 26-27 fee chart: 'Solar Panels' $153.00, plus the non-refundable $56.00 application fee

Frequently asked questions

Do you need an electrical permit in Sterling Heights?
Sometimes: before any electrical work, including work that reuses existing wiring. If you are unsure how that applies to your project, call the permit office at 586-446-2360 before you start.
How much does an electrical permit cost in Sterling Heights?
The fee wording from the official schedule is in the cost table on this page, as we read it on 15 Aug 2026. For the figure on your own project, call the permit office at 586-446-2360.
Where do you apply for an electrical permit in Sterling Heights?
You can apply through the Sterling Heights permit portal or contact the City of Sterling Heights Office of Building (Building Division), Office of City Development directly. The links are listed on this page.
Can a homeowner pull an electrical permit themselves in Sterling Heights?
Under Michigan law (MCL 339.2403(b), (c); MCL 339.2401(a)(iii), (b)(ii)(A); MCL 339.5737(3)(g); MCL 339.6107(2)(d); MCL 339.5819): Yes. A Michigan homeowner may pull the building permit and do the work on their own home without a residential builder license, because the licensing article both defines the trade to exclude them and exempts them outright. MCL 339.2401(a)(iii) says a residential builder is a person that erects a residential structure except for the person's own use and occupancy on the person's property, and MCL 339.2403(b) exempts an owner of property with reference to a structure on the property for the owner's own use and occupancy. Own use and occupancy is the condition, so the exemption does not cover building to sell, and MCL 339.2403(c) limits owners of rental property to maintenance and alteration of that property. The statute sets no cap on how many times a homeowner may use the exemption; the only frequency rule in the article catches purchase, substantial rehabilitation, and resale of the same structure more than twice in 1 calendar year, and MCL 339.2401(b)(ii)(A) exempts work for the person's own use and occupancy from even that. Homeowners can also pull their own trade permits: electrical work in a single family home and accompanying outbuildings owned and occupied or to be occupied by the person doing the work (MCL 339.5737(3)(g)), their own plumbing, building sewer, or private sewer in their single-family dwelling if a permit is secured (MCL 339.6107(2)(d)), and a heating or refrigerating system if the owner affirms in the permit application that they are or will become the owner and occupant (MCL 339.5819). Confirm how Sterling Heights applies this before you apply.

From the Library

Electrical Permit in other Michigan localities

Everything above, sourced

How this electrical permit page for Sterling Heights was verified. 2 official sources: sterlingheights.gov, sterlingheights.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Sterling Heights Office of Building (Building Division), Office of City Development. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

It depends
Check my project