Michigan

Building permits in Detroit, Michigan

Of the 9 common home projects we have verified in Detroit, 1 need a permit outright and 8 depend on size or scope. Click any project for the full rule, fee, and how to apply.

By Mario Bailey Last checked · 2 official sources

Verified against official sources
Project types verified
10
in Detroit

City of Detroit Buildings, Safety Engineering and Environmental Department (BSEED)

Look up a permit in Detroit

Detroit runs an online permit portal. Many local portals let you check application status, search permit records, and view inspection results without calling the office.

Search the Detroit permit portal

What needs a permit in Detroit

Of the 9 common home projects we have verified in Detroit, 1 need a permit outright and 8 depend on size or scope. Click any project for the full rule, fee, and how to apply.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsdeck areaBuilding permit fees are based on project cost under the BSEED Fee Schedule effective...
Electrical PermitIt dependselectrical alterations beyond replacing switches or receptaclesBSEED Fee Schedule effective January 1, 2024, modified 7/18/2025, ELECTRICAL PART A:...
Fence PermitIt dependsfence height, for a fence outside a Special Review DistrictFence work is priced as a building permit on project cost under the BSEED Fee Schedule...
HVAC PermitIt dependsNot specifiedBSEED Fee Schedule effective January 1, 2024, modified 7/18/2025, GAS FIRED EQUIPMENT:...
Patio PermitNot confirmedNot specifiedNot published
Plumbing PermitIt dependsplumbing alterations beyond the working parts of a faucet or valve or clearance of stoppagesBSEED Fee Schedule effective January 1, 2024, modified 7/18/2025, PLUMBING INSTALLATION...
Pool PermitIt dependsprefabricated above-ground pool accessory to a Group R-3 occupancy holding not more than 5,000 gallonsBuilding permit fees are based on project cost under the BSEED Fee Schedule effective...
Roof Replacement PermitIt dependsroof-work beyond replacing a few shinglesBuilding permit fees are based on project cost under the BSEED Fee Schedule effective...
Shed PermitIt dependsfloor area of a one-story detached accessory structure in residential constructionBuilding permit fees are based on project cost under the BSEED Fee Schedule effective...
Solar PermitPermit requiredNot specifiedBSEED Fee Schedule effective January 1, 2024, modified 7/18/2025, PART E, RENEWABLE...

Planning a project in Detroit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?

Planning several things at once? Check your whole project

Other permit offices in Michigan