Building permits in Detroit, Michigan
Of the 9 common home projects we have verified in Detroit, 1 needs a permit outright and 8 depend on size or scope. Click any project for the full rule, fee, and how to apply.
- Project types verified
- 9of 10 we cover in Detroit
City of Detroit Buildings, Safety Engineering and Environmental Department (BSEED)
- Development Resource Center, Coleman A. Young Municipal Center, 2 Woodward Avenue, Room 434, Detroit, MI 48226
- Phone: (313) 224-2372
- Email: DRC@detroitmi.gov
- Official permit page
- Permit portal
- Official fee schedule
Look up a permit in Detroit
Detroit runs an online permit portal. We have not confirmed what its record search covers.
What needs a permit in Detroit
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | deck area | Building permit fees are based on project cost under the BSEED Fee Schedule effective January 1, 2024, modified 7/18/2025: $2,000 or less, Flat $271.43 |
| Electrical Permit | It depends | electrical alterations beyond replacing switches or receptacles | BSEED Fee Schedule effective January 1, 2024, modified 7/18/2025, ELECTRICAL PART A: "Base fee" $66 |
| Fence Permit | It depends | fence height, for a fence outside a Special Review District | See schedule |
| HVAC Permit | It depends | Before installing or altering any heating, cooling, gas piping, air distribution or... | See schedule |
| Patio Permit | Not confirmed | Not confirmed | Not published |
| Plumbing Permit | It depends | plumbing alterations beyond the working parts of a faucet or valve or clearance of stoppages | BSEED Fee Schedule effective January 1, 2024, modified 7/18/2025, PLUMBING INSTALLATION PERMITS: "Application Fee (Non-Refundable), Flat" $73 |
| Pool Permit | It depends | prefabricated above-ground pool accessory to a Group R-3 occupancy holding not more than 5,000 gallons | Building permit fees are based on project cost under the BSEED Fee Schedule effective January 1, 2024, modified 7/18/2025: $2,000 or less, Flat $271.43 |
| Roof Replacement Permit | It depends | roof-work beyond replacing a few shingles | Building permit fees are based on project cost under the BSEED Fee Schedule effective January 1, 2024, modified 7/18/2025: $2,000 or less, Flat $271.43 |
| Shed Permit | It depends | floor area of a one-story detached accessory structure in residential construction | Building permit fees are based on project cost under the BSEED Fee Schedule effective January 1, 2024, modified 7/18/2025: $2,000 or less, Flat $271.43 |
| Solar Permit | Permit required | Any size | Solar Photovoltaic systems (per visit): Systems with NO connection to utility grid, Per visit $165 |
Planning a project in Detroit?
Hire it out
Sponsored
Licensed contractors usually pull the permit as part of the job. Comparing a few local quotes before you commit is the useful next step.
Compare local contractor quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
Planning several things at once? Check your whole project
Detroit permit fees compared with nearby Michigan localities
| Michigan locality | Deck Permit | HVAC Permit | Electrical Permit |
|---|---|---|---|
| Detroit | See schedule | See schedule | BSEED Fee Schedule effective January 1, 2024, modified 7/18/2025, ELECTRICAL PART A: "Base fee" $66 |
| Ann Arbor | See schedule | Mechanical Permit Fees (effective July 1, 2017): $15 base application fee required for all permits; the schedule has the rest | Electrical Permit Fees (effective January 2020): $15 base application fee for all permits; the schedule has the rest |
| Grand Rapids | See schedule | See schedule | See schedule |
| Sterling Heights | Building Permit Application 26-27 fee chart: 'Deck/Porch' $78.00, plus the non-refundable $56.00 application fee | Mechanical Permit Application 2026-2027: non-refundable application fee $55.00, then per item | Electrical Permit Application 26-27: non-refundable application fee $55.00, then per item |
Each cell is taken from that Michigan jurisdiction's own fee schedule; the full wording and source sit on each permit page.
Detroit permit questions, answered from the data
- Do you need a permit in Detroit?
- It depends on the project. Of the 10 permit types we cover in Detroit, 1 always requires a permit (for example a solar permit) and 8 depend on size or scope (a deck permit, for instance), and 1 is not confirmed. Each Detroit permit type's page states the exact rule and its source.
- How much does a permit cost in Detroit?
- Detroit publishes a fee for 9 of the 10 permit types we cover, each quoted on its page from the jurisdiction's own schedule (linked on every page that carries one). Fees are set by City of Detroit Buildings, Safety Engineering and Environmental Department (BSEED); we do not estimate or mark them up.
- Where do you apply for a permit in Detroit?
- City of Detroit Buildings, Safety Engineering and Environmental Department (BSEED) issues permits in Detroit and has an online permit portal, and takes questions at (313) 224-2372. The Detroit official page and portal are linked in the office section above.
How the Detroit pages were verified. 10 permit types, 6 distinct official sources, most recently checked . Every rule is read from City of Detroit Buildings, Safety Engineering and Environmental Department (BSEED) or the applicable code and cited on its page; anything we could not confirm for Detroit is marked rather than estimated. How we verify.
Permitting activity in Detroit
In 2025, Detroit authorized permits for 2,620 new residential housing units (662 single-family, 1,958 in multi-family buildings), valued at $291M , up from 1,919 the year before. That works out to about 3.9 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 665,369.