Michigan

Building permits in Detroit, Michigan

Of the 9 common home projects we have verified in Detroit, 1 needs a permit outright and 8 depend on size or scope. Click any project for the full rule, fee, and how to apply.

By Mario Bailey Last checked · 2 official sources

Verified against official sources
Project types verified
10
in Detroit

City of Detroit Buildings, Safety Engineering and Environmental Department (BSEED)

Look up a permit in Detroit

Detroit runs an online permit portal. Many local portals let you check application status, search permit records, and view inspection results without calling the office.

Search the Detroit permit portal

What needs a permit in Detroit

Of the 9 common home projects we have verified in Detroit, 1 needs a permit outright and 8 depend on size or scope. Click any project for the full rule, fee, and how to apply.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsdeck area...under the BSEED Fee Schedule effective January 1, 2024, modified 7/18/2025: $2,000...
Electrical PermitIt dependselectrical alterations beyond replacing switches or receptacles...effective January 1, 2024, modified 7/18/2025, ELECTRICAL PART A: "Base fee"...
Fence PermitIt dependsfence height, for a fence outside a Special Review District...and RESIDENTIAL PERMITS, New Buildings, Alterations, Repairs, And Additions, $2,000...
HVAC PermitIt dependsBefore installing or altering any heating, cooling, gas piping, air distribution or......HOMEOWNER, "Central heating units, conversion burner, floor furnace, Each"...
Patio PermitNot confirmedNot confirmedNot published
Plumbing PermitIt dependsplumbing alterations beyond the working parts of a faucet or valve or clearance of stoppages...PLUMBING INSTALLATION PERMITS: "Application Fee (Non-Refundable), Flat"...
Pool PermitIt dependsprefabricated above-ground pool accessory to a Group R-3 occupancy holding not more than 5,000 gallons...under the BSEED Fee Schedule effective January 1, 2024, modified 7/18/2025: $2,000...
Roof Replacement PermitIt dependsroof-work beyond replacing a few shingles...under the BSEED Fee Schedule effective January 1, 2024, modified 7/18/2025: $2,000...
Shed PermitIt dependsfloor area of a one-story detached accessory structure in residential construction...under the BSEED Fee Schedule effective January 1, 2024, modified 7/18/2025: $2,000...
Solar PermitPermit requiredAny size...systems (per visit): Systems with NO connection to utility grid, Per visit...

Planning a project in Detroit?

Hire it out

Sponsored

Licensed contractors usually pull the permit as part of the job. Comparing a few local quotes before you commit is the useful next step.

Compare local contractor quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

Planning several things at once? Check your whole project

Detroit permit fees compared with nearby Michigan localities

Michigan locality Deck PermitHVAC PermitElectrical Permit
Detroit ...effective January 1, 2024, modified 7/18/2025: $2,000... ...units, conversion burner, floor furnace, Each"... ...modified 7/18/2025, ELECTRICAL PART A: "Base fee"...
Ann Arbor ...Fees (effective October 2019, revised 7/15/2025): $15... ...Permit Fees (effective July 1, 2017): $15 base... ...Permit Fees (effective January 2020): $15 base...
Grand Rapids ...1, 2026, Building Permits: "Residential Deck $66.00... ...Fees: "Application (Includes 1 Inspection) $52.00"... ...Fees: "Application (Includes 1 inspection) $52.00"...
Sterling Heights ...Application 26-27 fee chart: 'Deck/Porch' $78.00... ...2026-2027: non-refundable application fee $55.00... ...26-27: non-refundable application fee $55.00, then...

Each cell is the opening clause of that Michigan jurisdiction's own fee schedule; the full wording and source sit on each permit page.

Detroit permit questions, answered from the data

Do you need a permit in Detroit?
For most projects, yes. Of the 10 permit types we have verified for Detroit, 1 always requires a permit (for example a solar permit), 8 depend on size or scope (a deck permit, for instance). Each Detroit permit type's page states the exact rule and its source.
How much does a permit cost in Detroit?
Detroit publishes a fee for 9 of the 10 permit types we cover, each quoted on its page from the jurisdiction's own schedule (linked on every page that carries one). Fees are set by City of Detroit Buildings, Safety Engineering and Environmental Department (BSEED); we do not estimate or mark them up.
Where do you apply for a permit in Detroit?
City of Detroit Buildings, Safety Engineering and Environmental Department (BSEED) issues permits in Detroit, with an online portal for applications, plan uploads and status checks, and takes questions at (313) 224-2372. The Detroit official page and portal are linked in the office section above.

How the Detroit pages were verified. 10 permit types, 6 distinct official sources, most recently checked . Every rule is read from City of Detroit Buildings, Safety Engineering and Environmental Department (BSEED) or the applicable code and cited on its page; anything we could not confirm for Detroit is marked rather than estimated. How we verify.

From the Library

Other permit offices in Michigan