Michigan / Detroit

Patio Permit in Detroit, Michigan

Not confirmed

We could not confirm this

Not confirmed Verified City of Detroit Buildings, Safety Engineering and Environmental Department (BSEED)

By Mario Bailey, verified against official sources

Quick answer

BSEED does not publish a patio-specific permit rule. The department's Do I Need a Building or Trade Permit guide and the building permit exemption list on its Residential and Commercial Ownership page name fences, detached accessory structures, retaining walls, decks, sidewalks and driveways, water tanks, prefabricated pools, playground equipment and window awnings, but neither list mentions patios in either direction. The only published Detroit reference to patios is in the Residential Building Permit Plan Submittal Checklist, which requires that all slabs including patio slabs be shown with their thickness on the plans and that elevation drawings include patio covers, which describes plan content rather than when a permit is triggered. Also checked: the BSEED fee schedule, the BSEED forms list, the Building Permit Requirements page and its linked handouts, Chapter 8 and Chapter 50 of the 2019 Detroit City Code.

Applying yourself? Start with the office.

What a patio permit costs in Detroit

Line item
patio permitNot publishedDetroit publishes no fee for this permit type in a schedule we can verify. Ask City of Detroit Buildings, Safety Engineering and Environmental Department (BSEED) how the fee is calculated for your project.
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Detroit compares in Michigan

No Michigan jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.

JurisdictionPermit needed?Typical fee
Ann ArborIt dependsNo patio specific line item is published.
Detroitthis pageNot confirmedNot published
Sterling HeightsIt dependsWhere a concrete permit is required, Building Permit Application 26-27 fee...

How to apply in Detroit

Applying for a patio permit means submitting a site plan and framing plans for a roofed patio cover, since a cover is treated as its own permitted structure regardless of size. A plain concrete or paver patio slab at or near grade is, by contrast, often exempt from that same building permit requirement.

What most patio permit applications include:

  • Filing a permit application with the local building department, which only the property owner or an authorized agent may sign, since a patio cover is treated as its own permitted structure regardless of size (IRC R105.1).
  • A scaled site plan showing the new patio cover's size and location relative to the house and other existing structures, with dimensioned distances to all property lines so required setbacks can be verified before the permit is approved (IRC R106.2).
  • Construction documents such as a framing plan and elevation, showing rafter or beam sizes and spacing, the distance between supporting posts, and the method of attachment to the house, drawn with enough clarity for the building official to confirm the work will conform to the code (IRC R106.1).
  • For the roof structure itself, plans showing compliance with the patio cover appendix's structural limits, such as adequate footing sizes for the applied post loads, since a shallow slab on grade may substitute for a deeper footing only in limited cases up to about 750 pounds of load per post (IRC Appendix AH, Section AH105.2).
  • By contrast, an at grade concrete or paver patio that is not attached to the dwelling and stays within the code's small flatwork thresholds, similar to a sidewalk, driveway, or low deck under 200 square feet and 30 inches high, commonly needs no building permit at all, so none of the plan review steps above apply (IRC R105.2).

General submittal guidance from 2021 International Residential Code (IRC), Sections R105 and R106, with Appendix AH Patio Covers (named Appendix H in the 2012, 2015, and 2018 editions). Source. City of Detroit Buildings, Safety Engineering and Environmental Department (BSEED) sets the exact checklist for Detroit.

Where to apply in Detroit:

City of Detroit Buildings, Safety Engineering and Environmental Department (BSEED)

  • Development Resource Center, Coleman A. Young Municipal Center, 2 Woodward Avenue, Room 434, Detroit, MI 48226
  • Phone: (313) 224-2372
  • Email: DRC@detroitmi.gov

Inspections and closing out your permit

A permitted patio cover follows the same footing, frame, and final inspection sequence used for any small accessory structure, since the posts and roof framing have to be checked before they are covered and again once the work is done. An at grade patio slab that qualifies as exempt flatwork usually needs no building inspection at all, because inspections only attach to work that required a permit in the first place.

  1. A footing inspection once the excavation, forms, and any reinforcing steel are in place but before concrete is poured, confirming the posts supporting a patio cover will bear on adequate footings (IRC R109.1.1).
  2. A frame inspection after the rafters, beams, posts, and any required rough in work are in place but before the roof sheathing or covering material conceals them, since a solid patio cover roof cannot be signed off once it is covered without this check (IRC R109.1.4).
  3. A final inspection once all permitted work, including roofing and post anchorage, is complete, which the code requires before the structure may be used (IRC R109.1.6).
  4. An at grade concrete or paver patio that qualifies as exempt flatwork under the permit rules is not subject to any of these inspection stages, since the inspection sequence only attaches to work that required a permit in the first place (IRC R105.2).
  5. Each inspection has to be requested by the permit holder rather than happening automatically, and the approved plans and permit card need to be on site and available when the inspector arrives (IRC R109.3).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Detroit permit portal or by phone at (313) 224-2372.

Inspection sequence from 2021 International Residential Code (IRC), Section R109 (Inspections). Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need a patio permit in Detroit?
BSEED does not publish a patio-specific permit rule. The department's Do I Need a Building or Trade Permit guide and the building permit exemption list on its Residential and Commercial Ownership page name fences, detached accessory structures, retaining walls, decks, sidewalks and driveways, water tanks, prefabricated pools, playground equipment and window awnings, but neither list mentions patios in either direction. The only published Detroit reference to patios is in the Residential Building Permit Plan Submittal Checklist, which requires that all slabs including patio slabs be shown with their thickness on the plans and that elevation drawings include patio covers, which describes plan content rather than when a permit is triggered. Also checked: the BSEED fee schedule, the BSEED forms list, the Building Permit Requirements page and its linked handouts, Chapter 8 and Chapter 50 of the 2019 Detroit City Code. Always confirm with the City of Detroit Buildings, Safety Engineering and Environmental Department (BSEED) before starting.
How much does a patio permit cost in Detroit?
Fees are set by Detroit and are not published here. See the official fee schedule for current amounts.
Where do you apply for a patio permit in Detroit?
You can apply through the Detroit permit portal or contact the City of Detroit Buildings, Safety Engineering and Environmental Department (BSEED) directly. The links are listed on this page.
Can a homeowner pull a patio permit themselves in Detroit?
Under Michigan law (MCL 339.2403(b), (c); MCL 339.2401(a)(iii), (b)(ii)(A); MCL 339.5737(3)(g); MCL 339.6107(2)(d); MCL 339.5819): Yes. A Michigan homeowner may pull the building permit and do the work on their own home without a residential builder license, because the licensing article both defines the trade to exclude them and exempts them outright. MCL 339.2401(a)(iii) says a residential builder is a person that erects a residential structure except for the person's own use and occupancy on the person's property, and MCL 339.2403(b) exempts an owner of property with reference to a structure on the property for the owner's own use and occupancy. Own use and occupancy is the condition, so the exemption does not cover building to sell, and MCL 339.2403(c) limits owners of rental property to maintenance and alteration of that property. The statute sets no cap on how many times a homeowner may use the exemption; the only frequency rule in the article catches purchase, substantial rehabilitation, and resale of the same structure more than twice in 1 calendar year, and MCL 339.2401(b)(ii)(A) exempts work for the person's own use and occupancy from even that. Homeowners can also pull their own trade permits: electrical work in a single family home and accompanying outbuildings owned and occupied or to be occupied by the person doing the work (MCL 339.5737(3)(g)), their own plumbing, building sewer, or private sewer in their single-family dwelling if a permit is secured (MCL 339.6107(2)(d)), and a heating or refrigerating system if the owner affirms in the permit application that they are or will become the owner and occupant (MCL 339.5819). Confirm how Detroit applies this before you apply.

From the Library

What else needs a permit in Detroit

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsdeck areaBuilding permit fees are based on project cost under the BSEED Fee Schedule effective...
Electrical PermitIt dependselectrical alterations beyond replacing switches or receptaclesBSEED Fee Schedule effective January 1, 2024, modified 7/18/2025, ELECTRICAL PART A:...
Fence PermitIt dependsfence height, for a fence outside a Special Review DistrictFence work is priced as a building permit on project cost under the BSEED Fee Schedule...
HVAC PermitIt dependsNot specifiedBSEED Fee Schedule effective January 1, 2024, modified 7/18/2025, GAS FIRED EQUIPMENT:...
Plumbing PermitIt dependsplumbing alterations beyond the working parts of a faucet or valve or clearance of stoppagesBSEED Fee Schedule effective January 1, 2024, modified 7/18/2025, PLUMBING INSTALLATION...
Pool PermitIt dependsprefabricated above-ground pool accessory to a Group R-3 occupancy holding not more than 5,000 gallonsBuilding permit fees are based on project cost under the BSEED Fee Schedule effective...
Roof Replacement PermitIt dependsroof-work beyond replacing a few shinglesBuilding permit fees are based on project cost under the BSEED Fee Schedule effective...
Shed PermitIt dependsfloor area of a one-story detached accessory structure in residential constructionBuilding permit fees are based on project cost under the BSEED Fee Schedule effective...
Solar PermitPermit requiredNot specifiedBSEED Fee Schedule effective January 1, 2024, modified 7/18/2025, PART E, RENEWABLE...

Patio Permit in other Michigan localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not Detroit documents; the office above sets the local rules.

Verified by a person against the sources above on , not confirmed with City of Detroit Buildings, Safety Engineering and Environmental Department (BSEED). Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Compare Patio Permit requirements across Michigan localities

Not confirmed
Get quotes