Michigan / Detroit

Patio Permit in Detroit, Michigan

Not confirmed

We could not confirm this

Quick answer

BSEED does not publish a patio-specific permit rule. The department's Do I Need a Building or Trade Permit guide and the building permit exemption list on its Residential and Commercial Ownership page name fences, detached accessory structures, retaining walls, decks, sidewalks and driveways, water tanks, prefabricated pools, playground equipment and window awnings, but neither list mentions patios in either direction. The only published Detroit reference to patios is in the Residential Building Permit Plan Submittal Checklist, which requires that all slabs including patio slabs be shown with their thickness on the plans and that elevation drawings include patio covers, which describes plan content rather than when a permit is triggered. Also checked: the BSEED fee schedule, the BSEED forms list, the Building Permit Requirements page and its linked handouts, Chapter 8 and Chapter 50 of the 2019 Detroit City Code.

Issued by
City of Detroit Buildings, Safety Engineering and Environmental Department (BSEED)
Not confirmed Checked

Applying yourself? Start with the office.

What a patio permit costs in Detroit

Permit fee
Not published
Fee schedule in force
Official scheduleRead .

Detroit publishes no fee for this permit type in a schedule we can verify. Ask City of Detroit Buildings, Safety Engineering and Environmental Department (BSEED) how the fee is calculated for your project.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Detroit compares in Michigan

JurisdictionPermit needed?Threshold
Ann ArborIt dependsBefore pouring or laying a patio that costs more than $100 or covers 100 square feet or...
Detroitthis pageNot confirmedNot confirmed
Sterling HeightsIt dependsBefore pouring or replacing concrete other than a flat backyard patio poured on grade...

Where to ask in Detroit

We could not confirm the rule, so start with the office's own pages or call the number below.

City of Detroit Buildings, Safety Engineering and Environmental Department (BSEED)

  • Development Resource Center, Coleman A. Young Municipal Center, 2 Woodward Avenue, Room 434, Detroit, MI 48226
  • Phone: (313) 224-2372
  • Email: DRC@detroitmi.gov

Permitting activity in Detroit

In 2025, Detroit authorized permits for 2,620 new residential housing units (662 single-family, 1,958 in multi-family buildings), valued at $291M, up from 1,919 the year before. That works out to about 3.9 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 665,369.

What else needs a permit in Detroit

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsdeck areaBuilding permit fees are based on project cost under the BSEED Fee Schedule effective January 1, 2024, modified 7/18/2025: $2,000 or less, Flat $271.43
Electrical PermitIt dependselectrical alterations beyond replacing switches or receptaclesBSEED Fee Schedule effective January 1, 2024, modified 7/18/2025, ELECTRICAL PART A: "Base fee" $66
Fence PermitIt dependsfence height, for a fence outside a Special Review DistrictSee schedule
HVAC PermitIt dependsBefore installing or altering any heating, cooling, gas piping, air distribution or...See schedule
Plumbing PermitIt dependsplumbing alterations beyond the working parts of a faucet or valve or clearance of stoppagesBSEED Fee Schedule effective January 1, 2024, modified 7/18/2025, PLUMBING INSTALLATION PERMITS: "Application Fee (Non-Refundable), Flat" $73
Pool PermitIt dependsprefabricated above-ground pool accessory to a Group R-3 occupancy holding not more than 5,000 gallonsBuilding permit fees are based on project cost under the BSEED Fee Schedule effective January 1, 2024, modified 7/18/2025: $2,000 or less, Flat $271.43
Roof Replacement PermitIt dependsroof-work beyond replacing a few shinglesBuilding permit fees are based on project cost under the BSEED Fee Schedule effective January 1, 2024, modified 7/18/2025: $2,000 or less, Flat $271.43
Shed PermitIt dependsfloor area of a one-story detached accessory structure in residential constructionBuilding permit fees are based on project cost under the BSEED Fee Schedule effective January 1, 2024, modified 7/18/2025: $2,000 or less, Flat $271.43
Solar PermitPermit requiredAny sizeSolar Photovoltaic systems (per visit): Systems with NO connection to utility grid, Per visit $165

Frequently asked questions

Do you need a patio permit in Detroit?
We could not confirm the patio permit rule on an official Detroit page, so this page gives no yes or no. Call the permit office at (313) 224-2372 before you start.
How much does a patio permit cost in Detroit?
We found no published fee for a patio permit in Detroit. To learn how it is calculated for your project, call the permit office at (313) 224-2372.
Where do you apply for a patio permit in Detroit?
You can apply through the Detroit permit portal or contact the City of Detroit Buildings, Safety Engineering and Environmental Department (BSEED) directly. The links are listed on this page.
Can a homeowner pull a patio permit themselves in Detroit?
Under Michigan law (MCL 339.2403(b), (c); MCL 339.2401(a)(iii), (b)(ii)(A); MCL 339.5737(3)(g); MCL 339.6107(2)(d); MCL 339.5819): Yes. A Michigan homeowner may pull the building permit and do the work on their own home without a residential builder license, because the licensing article both defines the trade to exclude them and exempts them outright. MCL 339.2401(a)(iii) says a residential builder is a person that erects a residential structure except for the person's own use and occupancy on the person's property, and MCL 339.2403(b) exempts an owner of property with reference to a structure on the property for the owner's own use and occupancy. Own use and occupancy is the condition, so the exemption does not cover building to sell, and MCL 339.2403(c) limits owners of rental property to maintenance and alteration of that property. The statute sets no cap on how many times a homeowner may use the exemption; the only frequency rule in the article catches purchase, substantial rehabilitation, and resale of the same structure more than twice in 1 calendar year, and MCL 339.2401(b)(ii)(A) exempts work for the person's own use and occupancy from even that. Homeowners can also pull their own trade permits: electrical work in a single family home and accompanying outbuildings owned and occupied or to be occupied by the person doing the work (MCL 339.5737(3)(g)), their own plumbing, building sewer, or private sewer in their single-family dwelling if a permit is secured (MCL 339.6107(2)(d)), and a heating or refrigerating system if the owner affirms in the permit application that they are or will become the owner and occupant (MCL 339.5819). Confirm how Detroit applies this before you apply.

From the Library

Patio Permit in other Michigan localities

Everything above, sourced

What was checked for this patio permit page for Detroit. The rule itself is not confirmed. 1 official source: detroitmi.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Detroit Buildings, Safety Engineering and Environmental Department (BSEED). Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Not confirmed
Check my project