Patio Permit in Ann Arbor, Michigan
It depends
Sometimes, depending on the project
Before pouring or laying a patio that costs more than $100 or covers 100 square feet or more, and before any earth change that disturbs 225 square feet or more.
Quick answer
Ann Arbor publishes no patio specific handout, so the general Unified Development Code rule governs. The code defines a structure as "A combination of materials to form a construction for use, occupancy or ornamentation whether installed on, above or below the surface of land or water", which covers an at grade patio, and Section 5.29.1 requires a zoning permit for any structure costing more than $100 or measuring 100 to 200 square feet, then a building permit instead once the structure exceeds 200 square feet. A patio escapes the permit requirement only if it both costs $100 or less and stays under 100 square feet. Separately, a grading permit is required prior to any earth change unless the work disturbs less than 225 square feet in an isolated self contained area, and adding 200 square feet or more of impervious surface on a single or two family property triggers first flush stormwater management; patios are named explicitly in the city's list of impervious surfaces.
- Issued by
- City of Ann Arbor Building, Rental and Inspection Services (Construction and Building), with zoning review by Planning and Development Services
- Phone
- 734.794.6263 ext. 0
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
If a contractor builds your patio, they usually handle any required permit as part of the job. Compare a few bids before you commit.
Compare patio contractor quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What a patio permit costs in Ann Arbor
- Fee schedule in force
- Official scheduleRead .
- No patio specific line item is published.
- A patio handled as a zoning compliance permit pays $25 for building projects up to $10,000 or $75 for projects over $10,000 under the Building Permit Fees schedule (revised 7/15/2025).
- A patio over 200 sq ft handled as a building permit pays the $15 base application fee plus the estimated project cost permit fee plus a plan examination fee of 20% of the building permit fee.
- Grading and soil erosion permit fees are published on a separate schedule.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How to apply in Ann Arbor
General guide, not specific to this office
What a patio permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a patio permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
City of Ann Arbor Building, Rental and Inspection Services (Construction and Building), with zoning review by Planning and Development Services
- City Hall, 301 E. Huron St., Ann Arbor, MI 48104. Mailing: P.O. Box 8647, Ann Arbor, MI 48107-8647
- Phone: 734.794.6263 ext. 0
- Email: building@a2gov.org
Patio Permit in Ann Arbor compared with nearby Michigan localities
| Locality | Permit needed? | Threshold | What each Michigan schedule says | Verified |
|---|---|---|---|---|
| Ann Arbor | It depends | Before pouring or laying a patio that costs more than $100 or covers 100 square feet or... | See schedule | |
| Detroit | Not confirmed | Not confirmed | Not published | |
| Grand Rapids | Not confirmed | Not confirmed | Not published | |
| Sterling Heights | It depends | Before pouring or replacing concrete other than a flat backyard patio poured on grade... | Where a concrete permit is required, Building Permit Application 26-27 fee chart: 'Concrete' $78.00, plus the non-refundable $56.00 application fee |
Your Patio Permit checklist for Ann Arbor
- Confirm the requirement. Sometimes, depending on the project. Read the rule where we read it: a2gov.org: construction and building.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Ann Arbor permit portal.
- Keep the office details handy. City of Ann Arbor Building, Rental and Inspection Services (Construction and Building), with zoning review by Planning and Development Services. Phone: 734.794.6263 ext. 0. Email: building@a2gov.org. Address: City Hall, 301 E. Huron St., Ann Arbor, MI 48104. Mailing: P.O. Box 8647, Ann Arbor, MI 48107-8647.
Compiled from the official sources on this page. Last checked .
Permitting activity in Ann Arbor
In 2025, Ann Arbor authorized permits for 557 new residential housing units (48 single-family, 509 in multi-family buildings), valued at $203M, up from 294 the year before. That works out to about 4.7 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 119,280.
What else needs a permit in Ann Arbor
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | Permit required | Any size | Building Permit Fees (effective October 2019, revised 7/15/2025): $15 base application fee for all permits; the schedule has the rest |
| Electrical Permit | Permit required | Any size | Electrical Permit Fees (effective January 2020): $15 base application fee for all permits, non refundable with no inspections included, plus $35 each inspection |
| Fence Permit | Permit required | Any size | A fence 7 feet or less takes a "Zoning Compliance Permit - Fence Permit" at $80 under Planning Review Fees (effective 7/1/2026 for FY2027) |
| HVAC Permit | Permit required | Any size | Mechanical Permit Fees (effective July 1, 2017): $15 base application fee required for all permits, non refundable with no inspections, plus $35 each inspection |
| Plumbing Permit | Permit required | Any size | Plumbing Permit Fees (effective July 1, 2017): $15 base application fee required for all permits, non refundable and no inspections, plus $35 each inspection |
| Pool Permit | Permit required | Any size | See schedule |
| Roof Replacement Permit | It depends | Before reroofing or recovering an existing flat roof | See schedule |
| Shed Permit | Permit required | Any size | See schedule |
| Solar Permit | Permit required | Any size | See schedule |
Frequently asked questions
- Do you need a patio permit in Ann Arbor?
- Sometimes: before pouring or laying a patio that costs more than $100 or covers 100 square feet or more, and before any earth change that disturbs 225 square feet or more. If you are unsure how that applies to your project, call the permit office at 734.794.6263 ext. 0 before you start.
- How much does a patio permit cost in Ann Arbor?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 15 Aug 2026. For the figure on your own project, call the permit office at 734.794.6263 ext. 0.
- Where do you apply for a patio permit in Ann Arbor?
- You can apply through the Ann Arbor permit portal or contact the City of Ann Arbor Building, Rental and Inspection Services (Construction and Building), with zoning review by Planning and Development Services directly. The links are listed on this page.
- Can a homeowner pull a patio permit themselves in Ann Arbor?
- Under Michigan law (MCL 339.2403(b), (c); MCL 339.2401(a)(iii), (b)(ii)(A); MCL 339.5737(3)(g); MCL 339.6107(2)(d); MCL 339.5819): Yes. A Michigan homeowner may pull the building permit and do the work on their own home without a residential builder license, because the licensing article both defines the trade to exclude them and exempts them outright. MCL 339.2401(a)(iii) says a residential builder is a person that erects a residential structure except for the person's own use and occupancy on the person's property, and MCL 339.2403(b) exempts an owner of property with reference to a structure on the property for the owner's own use and occupancy. Own use and occupancy is the condition, so the exemption does not cover building to sell, and MCL 339.2403(c) limits owners of rental property to maintenance and alteration of that property. The statute sets no cap on how many times a homeowner may use the exemption; the only frequency rule in the article catches purchase, substantial rehabilitation, and resale of the same structure more than twice in 1 calendar year, and MCL 339.2401(b)(ii)(A) exempts work for the person's own use and occupancy from even that. Homeowners can also pull their own trade permits: electrical work in a single family home and accompanying outbuildings owned and occupied or to be occupied by the person doing the work (MCL 339.5737(3)(g)), their own plumbing, building sewer, or private sewer in their single-family dwelling if a permit is secured (MCL 339.6107(2)(d)), and a heating or refrigerating system if the owner affirms in the permit application that they are or will become the owner and occupant (MCL 339.5819). Confirm how Ann Arbor applies this before you apply.
From the Library
Patio Permit in other Michigan localities
Everything above, sourced
How this patio permit page for Ann Arbor was verified. 2 official sources: a2gov.org, a2gov.org; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Ann Arbor Building, Rental and Inspection Services (Construction and Building), with zoning review by Planning and Development Services. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page