Patio Permit in Ann Arbor, Michigan

It depends

Sometimes, depending on the project

Before pouring or laying a patio that costs more than $100 or covers 100 square feet or more, and before any earth change that disturbs 225 square feet or more.

Confirmed on official page Verified City of Ann Arbor Building, Rental and Inspection Services (Construction and Building), with zoning review by Planning and Development Services

By Mario Bailey, verified against official sources

Quick answer

Ann Arbor publishes no patio specific handout, so the general Unified Development Code rule governs. The code defines a structure as "A combination of materials to form a construction for use, occupancy or ornamentation whether installed on, above or below the surface of land or water", which covers an at grade patio, and Section 5.29.1 requires a zoning permit for any structure costing more than $100 or measuring 100 to 200 square feet, then a building permit instead once the structure exceeds 200 square feet. A patio escapes the permit requirement only if it both costs $100 or less and stays under 100 square feet. Separately, a grading permit is required prior to any earth change unless the work disturbs less than 225 square feet in an isolated self contained area, and adding 200 square feet or more of impervious surface on a single or two family property triggers first flush stormwater management; patios are named explicitly in the city's list of impervious surfaces.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?

When a permit is usually needed

Before pouring or laying a patio that costs more than $100 or covers 100 square feet or more, and before any earth change that disturbs 225 square feet or more.

What a patio permit costs in Ann Arbor

Line item
patio permitBy formulaNo patio specific line item is published. A patio handled as a zoning compliance permit pays $25 for building projects up to $10,000 or $75 for projects over $10,000 under the Building Permit Fees schedule (revised 7/15/2025). A patio over 200 sq ft handled as a building permit pays the $15 base application fee plus the estimated project cost permit fee plus a plan examination fee of 20% of the building permit fee. Grading and soil erosion permit fees are published on a separate schedule.
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in Ann Arbor

Applying for a patio permit means submitting a site plan and framing plans for a roofed patio cover, since a cover is treated as its own permitted structure regardless of size. A plain concrete or paver patio slab at or near grade is, by contrast, often exempt from that same building permit requirement.

What most patio permit applications include:

  • Filing a permit application with the local building department, which only the property owner or an authorized agent may sign, since a patio cover is treated as its own permitted structure regardless of size (IRC R105.1).
  • A scaled site plan showing the new patio cover's size and location relative to the house and other existing structures, with dimensioned distances to all property lines so required setbacks can be verified before the permit is approved (IRC R106.2).
  • Construction documents such as a framing plan and elevation, showing rafter or beam sizes and spacing, the distance between supporting posts, and the method of attachment to the house, drawn with enough clarity for the building official to confirm the work will conform to the code (IRC R106.1).
  • For the roof structure itself, plans showing compliance with the patio cover appendix's structural limits, such as adequate footing sizes for the applied post loads, since a shallow slab on grade may substitute for a deeper footing only in limited cases up to about 750 pounds of load per post (IRC Appendix AH, Section AH105.2).
  • By contrast, an at grade concrete or paver patio that is not attached to the dwelling and stays within the code's small flatwork thresholds, similar to a sidewalk, driveway, or low deck under 200 square feet and 30 inches high, commonly needs no building permit at all, so none of the plan review steps above apply (IRC R105.2).

General submittal guidance from 2021 International Residential Code (IRC), Sections R105 and R106, with Appendix AH Patio Covers (named Appendix H in the 2012, 2015, and 2018 editions). Source. City of Ann Arbor Building, Rental and Inspection Services (Construction and Building), with zoning review by Planning and Development Services sets the exact checklist for Ann Arbor.

Where to apply in Ann Arbor:

City of Ann Arbor Building, Rental and Inspection Services (Construction and Building), with zoning review by Planning and Development Services

  • City Hall, 301 E. Huron St., Ann Arbor, MI 48104. Mailing: P.O. Box 8647, Ann Arbor, MI 48107-8647
  • Phone: 734.794.6263 ext. 0
  • Email: building@a2gov.org

Inspections and closing out your permit

A permitted patio cover follows the same footing, frame, and final inspection sequence used for any small accessory structure, since the posts and roof framing have to be checked before they are covered and again once the work is done. An at grade patio slab that qualifies as exempt flatwork usually needs no building inspection at all, because inspections only attach to work that required a permit in the first place.

  1. A footing inspection once the excavation, forms, and any reinforcing steel are in place but before concrete is poured, confirming the posts supporting a patio cover will bear on adequate footings (IRC R109.1.1).
  2. A frame inspection after the rafters, beams, posts, and any required rough in work are in place but before the roof sheathing or covering material conceals them, since a solid patio cover roof cannot be signed off once it is covered without this check (IRC R109.1.4).
  3. A final inspection once all permitted work, including roofing and post anchorage, is complete, which the code requires before the structure may be used (IRC R109.1.6).
  4. An at grade concrete or paver patio that qualifies as exempt flatwork under the permit rules is not subject to any of these inspection stages, since the inspection sequence only attaches to work that required a permit in the first place (IRC R105.2).
  5. Each inspection has to be requested by the permit holder rather than happening automatically, and the approved plans and permit card need to be on site and available when the inspector arrives (IRC R109.3).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Ann Arbor permit portal or by phone at 734.794.6263 ext. 0.

Inspection sequence from 2021 International Residential Code (IRC), Section R109 (Inspections). Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need a patio permit in Ann Arbor?
Ann Arbor publishes no patio specific handout, so the general Unified Development Code rule governs. The code defines a structure as "A combination of materials to form a construction for use, occupancy or ornamentation whether installed on, above or below the surface of land or water", which covers an at grade patio, and Section 5.29.1 requires a zoning permit for any structure costing more than $100 or measuring 100 to 200 square feet, then a building permit instead once the structure exceeds 200 square feet. A patio escapes the permit requirement only if it both costs $100 or less and stays under 100 square feet. Separately, a grading permit is required prior to any earth change unless the work disturbs less than 225 square feet in an isolated self contained area, and adding 200 square feet or more of impervious surface on a single or two family property triggers first flush stormwater management; patios are named explicitly in the city's list of impervious surfaces. Always confirm with the City of Ann Arbor Building, Rental and Inspection Services (Construction and Building), with zoning review by Planning and Development Services before starting.
How much does a patio permit cost in Ann Arbor?
No patio specific line item is published. A patio handled as a zoning compliance permit pays $25 for building projects up to $10,000 or $75 for projects over $10,000 under the Building Permit Fees schedule (revised 7/15/2025). A patio over 200 sq ft handled as a building permit pays the $15 base application fee plus the estimated project cost permit fee plus a plan examination fee of 20% of the building permit fee. Grading and soil erosion permit fees are published on a separate schedule. See the official fee schedule for current amounts.
Where do you apply for a patio permit in Ann Arbor?
You can apply through the Ann Arbor permit portal or contact the City of Ann Arbor Building, Rental and Inspection Services (Construction and Building), with zoning review by Planning and Development Services directly. The links are listed on this page.
Can a homeowner pull a patio permit themselves in Ann Arbor?
Under Michigan law (MCL 339.2403(b), (c); MCL 339.2401(a)(iii), (b)(ii)(A); MCL 339.5737(3)(g); MCL 339.6107(2)(d); MCL 339.5819): Yes. A Michigan homeowner may pull the building permit and do the work on their own home without a residential builder license, because the licensing article both defines the trade to exclude them and exempts them outright. MCL 339.2401(a)(iii) says a residential builder is a person that erects a residential structure except for the person's own use and occupancy on the person's property, and MCL 339.2403(b) exempts an owner of property with reference to a structure on the property for the owner's own use and occupancy. Own use and occupancy is the condition, so the exemption does not cover building to sell, and MCL 339.2403(c) limits owners of rental property to maintenance and alteration of that property. The statute sets no cap on how many times a homeowner may use the exemption; the only frequency rule in the article catches purchase, substantial rehabilitation, and resale of the same structure more than twice in 1 calendar year, and MCL 339.2401(b)(ii)(A) exempts work for the person's own use and occupancy from even that. Homeowners can also pull their own trade permits: electrical work in a single family home and accompanying outbuildings owned and occupied or to be occupied by the person doing the work (MCL 339.5737(3)(g)), their own plumbing, building sewer, or private sewer in their single-family dwelling if a permit is secured (MCL 339.6107(2)(d)), and a heating or refrigerating system if the owner affirms in the permit application that they are or will become the owner and occupant (MCL 339.5819). Confirm how Ann Arbor applies this before you apply.

From the Library

What else needs a permit in Ann Arbor

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredNot specifiedBuilding Permit Fees (effective October 2019, revised 7/15/2025): $15 base application...
Electrical PermitPermit requiredNot specifiedElectrical Permit Fees (effective January 2020): $15 base application fee for all...
Fence PermitPermit requiredNot specifiedThe Planning Services Fence Guidelines handout (revised 3/3/2025) states a flat Fence...
HVAC PermitPermit requiredNot specifiedMechanical Permit Fees (effective July 1, 2017): $15 base application fee required for...
Plumbing PermitPermit requiredNot specifiedPlumbing Permit Fees (effective July 1, 2017): $15 base application fee required for all...
Pool PermitPermit requiredNot specifiedBuilding Permit Fees (effective October 2019, revised 7/15/2025) carries a flat line...
Roof Replacement PermitIt dependsNot specifiedNo roofing line item is published.
Shed PermitPermit requiredNot specifiedBuilding Permit Fees (effective October 2019, revised 7/15/2025), under the Zoning...
Solar PermitPermit requiredNot specifiedFor expedited residential solar the Solar Photovoltaic (PV) System Permitting Checklist...

Patio Permit in other Michigan localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not Ann Arbor documents; the office above sets the local rules.

Verified by a person against the sources above on , not confirmed with City of Ann Arbor Building, Rental and Inspection Services (Construction and Building), with zoning review by Planning and Development Services. Rules change; confirm before you build. How we verify.