HVAC Permit in Ann Arbor, Michigan
Permit required
Yes, a permit is required
Before installing or replacing a furnace, boiler, air conditioner, rooftop unit, ductwork, gas piping, water heater venting or exhaust fan.
Quick answer
Mechanical work in Ann Arbor takes its own permit, separate from any building permit for the same project. The Building Department issues mechanical permits through STREAM and prices them per appliance and per system rather than on project valuation. Furnace, water heater, boiler and air conditioner reconnects also pull an electrical permit, which the mechanical contractor must obtain if no electrical contractor is already engaged. Trade permits tied to a building project are not released until the building permit is approved, and the permit must be posted on the job site.
- Issued by
- City of Ann Arbor Building, Rental and Inspection Services (Construction and Building), with zoning review by Planning and Development Services
- Phone
- 734.794.6263 ext. 0
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
HVAC contractors usually pull this permit as part of the job. If you have not picked one yet, compare a few quotes before you commit.
Compare HVAC contractor quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What an HVAC permit costs in Ann Arbor
- Fee schedule in force
- Official scheduleRead .
- Mechanical Permit Fees (effective July 1, 2017): $15 base application fee required for all permits, non refundable with no inspections, plus $35 each inspection.
- Residential line items include "Heating Appliances ... $50", "Distribution System - Duct ... $40", "Gas Distribution System lines ... $15", "Water Heater Regular and Tankless ... $15" and refrigeration or AC units at $40 for 2 HP or less, $55 for 2.25 to 5 HP and $75 for 5.25 to 50 HP. Mechanical contractor registration or re-registration is $15.
- Work without a permit is $130.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How Ann Arbor compares in Michigan
| Jurisdiction | Permit needed? | Threshold |
|---|---|---|
| Ann Arborthis page | Permit required | Any size |
| Detroit | It depends | Before installing or altering any heating, cooling, gas piping, air distribution or... |
| Grand Rapids | It depends | Before changing or updating a water heater, furnace, boiler, exhaust fan, kitchen hood... |
| Sterling Heights | Permit required | Any size |
How to apply in Ann Arbor
General guide, not specific to this office
What an HVAC permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how an HVAC permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
City of Ann Arbor Building, Rental and Inspection Services (Construction and Building), with zoning review by Planning and Development Services
- City Hall, 301 E. Huron St., Ann Arbor, MI 48104. Mailing: P.O. Box 8647, Ann Arbor, MI 48107-8647
- Phone: 734.794.6263 ext. 0
- Email: building@a2gov.org
Your HVAC Permit checklist for Ann Arbor
- Confirm the requirement. Yes, a permit is required. Read the rule where we read it: a2gov.org: construction and building.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Ann Arbor permit portal.
- Keep the office details handy. City of Ann Arbor Building, Rental and Inspection Services (Construction and Building), with zoning review by Planning and Development Services. Phone: 734.794.6263 ext. 0. Email: building@a2gov.org. Address: City Hall, 301 E. Huron St., Ann Arbor, MI 48104. Mailing: P.O. Box 8647, Ann Arbor, MI 48107-8647.
Compiled from the official sources on this page. Last checked .
Permitting activity in Ann Arbor
In 2025, Ann Arbor authorized permits for 557 new residential housing units (48 single-family, 509 in multi-family buildings), valued at $203M, up from 294 the year before. That works out to about 4.7 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 119,280.
What else needs a permit in Ann Arbor
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | Permit required | Any size | Building Permit Fees (effective October 2019, revised 7/15/2025): $15 base application fee for all permits; the schedule has the rest |
| Electrical Permit | Permit required | Any size | Electrical Permit Fees (effective January 2020): $15 base application fee for all permits, non refundable with no inspections included, plus $35 each inspection |
| Fence Permit | Permit required | Any size | A fence 7 feet or less takes a "Zoning Compliance Permit - Fence Permit" at $80 under Planning Review Fees (effective 7/1/2026 for FY2027) |
| Patio Permit | It depends | Before pouring or laying a patio that costs more than $100 or covers 100 square feet or... | See schedule |
| Plumbing Permit | Permit required | Any size | Plumbing Permit Fees (effective July 1, 2017): $15 base application fee required for all permits, non refundable and no inspections, plus $35 each inspection |
| Pool Permit | Permit required | Any size | See schedule |
| Roof Replacement Permit | It depends | Before reroofing or recovering an existing flat roof | See schedule |
| Shed Permit | Permit required | Any size | See schedule |
| Solar Permit | Permit required | Any size | See schedule |
Frequently asked questions
- Do you need an HVAC permit in Ann Arbor?
- Yes, before installing or replacing a furnace, boiler, air conditioner, rooftop unit, ductwork, gas piping, water heater venting or exhaust fan. If you are unsure how that applies to your project, call the permit office at 734.794.6263 ext. 0 before you start.
- How much does an HVAC permit cost in Ann Arbor?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 15 Aug 2026. For the figure on your own project, call the permit office at 734.794.6263 ext. 0.
- How long does an HVAC permit take in Ann Arbor?
- Minimum 24 to 48 hours for review and processing; trade permit reviews typically completed within 2 to 3 business days. Times can vary by workload and project scope, so confirm with the office.
- Where do you apply for an HVAC permit in Ann Arbor?
- You can apply through the Ann Arbor permit portal or contact the City of Ann Arbor Building, Rental and Inspection Services (Construction and Building), with zoning review by Planning and Development Services directly. The links are listed on this page.
- Can a homeowner pull an HVAC permit themselves in Ann Arbor?
- Under Michigan law (MCL 339.2403(b), (c); MCL 339.2401(a)(iii), (b)(ii)(A); MCL 339.5737(3)(g); MCL 339.6107(2)(d); MCL 339.5819): Yes. A Michigan homeowner may pull the building permit and do the work on their own home without a residential builder license, because the licensing article both defines the trade to exclude them and exempts them outright. MCL 339.2401(a)(iii) says a residential builder is a person that erects a residential structure except for the person's own use and occupancy on the person's property, and MCL 339.2403(b) exempts an owner of property with reference to a structure on the property for the owner's own use and occupancy. Own use and occupancy is the condition, so the exemption does not cover building to sell, and MCL 339.2403(c) limits owners of rental property to maintenance and alteration of that property. The statute sets no cap on how many times a homeowner may use the exemption; the only frequency rule in the article catches purchase, substantial rehabilitation, and resale of the same structure more than twice in 1 calendar year, and MCL 339.2401(b)(ii)(A) exempts work for the person's own use and occupancy from even that. Homeowners can also pull their own trade permits: electrical work in a single family home and accompanying outbuildings owned and occupied or to be occupied by the person doing the work (MCL 339.5737(3)(g)), their own plumbing, building sewer, or private sewer in their single-family dwelling if a permit is secured (MCL 339.6107(2)(d)), and a heating or refrigerating system if the owner affirms in the permit application that they are or will become the owner and occupant (MCL 339.5819). Confirm how Ann Arbor applies this before you apply.
From the Library
HVAC Permit in other Michigan localities
Everything above, sourced
How this HVAC permit page for Ann Arbor was verified. 2 official sources: a2gov.org, a2gov.org; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Ann Arbor Building, Rental and Inspection Services (Construction and Building), with zoning review by Planning and Development Services. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page