California / Santa Clara County
Fence Permit in Santa Clara County, California
It depends
Sometimes, depending on the project
Before building a fence taller than 7 feet in the unincorporated county. A fence 7 feet or shorter needs no building permit, but every fence still has to satisfy the Zoning Ordinance height and sight-clearance limits for its district.
Quick answer
Santa Clara County adopted the 2025 California Residential Code as the County Residential Code by Ordinance No. NS-1100.138 on December 9, 2025, and the county's own version of the work-exempt-from-permit list keeps the exemption for fences not over 7 feet high. A taller fence is not on that list, so it needs a building permit under Ordinance Code Section C1-67, which bars any work for which a permit is required without first obtaining one. Height is separately capped by Zoning Ordinance Section 4.20.050: in urban residential districts a fence or hedge may not exceed 3 feet within 20 feet of the front lot line and a fence may not exceed 8 feet elsewhere on the lot, with a 3-foot limit inside the corner-lot sight-clearance triangles. These rules cover unincorporated Santa Clara County only; the county's 15 incorporated cities and towns run their own building departments and are excluded here, namely San Jose (already covered separately in this dataset and operating its own building department), Sunnyvale, Santa Clara, Mountain View, Milpitas, Palo Alto, Cupertino, Gilroy, Morgan Hill, Campbell, Saratoga, Los Altos, Los Altos Hills, Monte Sereno and the Town of Los Gatos.
- Typical threshold
- fence height at which the County Residential Code permit exemption stops applying
- Issued by
- Santa Clara County Department of Planning and Development, Development Services (Building Inspection Office)
- Phone
- 408-299-5700
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
Fence installers usually handle any required permit as part of the job. Compare a few bids before you commit.
Compare fence installer quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What a fence permit costs in Santa Clara County
- Fee basis
- Project valuation
- Fee schedule in force
- Official scheduleRead .
- No fence-specific building permit fee is published.
- A fence that needs a building permit is charged off the valuation table of the county's Building Fee Schedule - FY 2026-2027 (effective July 18, 2026), which starts at $821.89 for a project valuation of $1 - $5,000, plus residential plan check at 70% of the building permit fee and an Information Technology fee of 3%.
- The same schedule lists a Building Permit (Planning) Review fee of $951.00 for Minor Building Permits - Fences, Signs, Emergency/Back-up Generators.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How Santa Clara County compares in California
Across the California jurisdictions we have verified, the same threshold runs from 6 to 7, so a project that is exempt here may still need a permit one county over.
| Jurisdiction | Permit needed? | Threshold |
|---|---|---|
| Alameda County | It depends | Permit exemption height limit: 7 feet for fences of light materials, 5 feet 9 inches for fences of concrete, masonry, or similar heavy materials |
| Contra Costa County | It depends | height of a fence, with concrete and masonry walls treated as walls rather than fences |
| Fresno County | It depends | Fences not over 7 feet high are on the county's published list of work exempt from a building permit |
| Sacramento County | It depends | fence height, measured from the grade on the right-of-way side when the fence sits within 5 feet of the public right-of-way and otherwise from the highest grade on either side |
| San Bernardino County | It depends | height of a fence or block wall |
| San Francisco | It depends | fences in a side or rear yard; the figure is 3 feet for a fence in the front yard |
| Santa Clara Countythis page | It depends | fence height at which the County Residential Code permit exemption stops applying |
How to apply in Santa Clara County
General guide, not specific to this office
What a fence permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a fence permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
Santa Clara County Department of Planning and Development, Development Services (Building Inspection Office)
- County Government Center, East Wing, 7th Floor, 70 West Hedding Street, San Jose, CA 95110
- Phone: 408-299-5700
Your Fence Permit checklist for Santa Clara County
- Confirm the requirement. Sometimes, depending on the project. Typical threshold: fence height at which the County Residential Code permit exemption stops applying. Read the rule where we read it: plandev.santaclaracounty.gov: apply building permit.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Santa Clara County permit portal.
- Keep the office details handy. Santa Clara County Department of Planning and Development, Development Services (Building Inspection Office). Phone: 408-299-5700. Address: County Government Center, East Wing, 7th Floor, 70 West Hedding Street, San Jose, CA 95110.
Compiled from the official sources on this page. Last checked .
Permitting activity in Santa Clara County
In 2025, Santa Clara County authorized permits for 5,323 new residential housing units (1,795 single-family, 3,528 in multi-family buildings), valued at $1.3B, up from 3,834 the year before. That works out to about 2.8 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 1,914,391.
What else needs a permit in Santa Clara County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | deck area, paired with a 30-inch height limit, no attachment to the dwelling, and no required exit door served | No deck-specific flat fee is published |
| Electrical Permit | Permit required | Any size | See schedule |
| HVAC Permit | Permit required | Any size | See schedule |
| Patio Permit | It depends | Before building a patio cover, trellis, carport or similar roofed structure over a patio | No patio cover-specific flat fee is published |
| Plumbing Permit | Permit required | Any size | See schedule |
| Pool Permit | It depends | depth of a prefabricated swimming pool | See schedule |
| Roof Replacement Permit | Permit required | Any size | See schedule |
| Shed Permit | It depends | floor area of a one-story detached tool or storage shed | No shed-specific flat fee is published |
| Solar Permit | Permit required | Any size | Residential solar under the county's Building Fee Schedule - FY 2026-2027 (effective July 18, 2026): Photovoltaic Roof Mount $950.00 |
Frequently asked questions
- Do you need a fence permit in Santa Clara County?
- It depends on the project. Fence height at which the County Residential Code permit exemption stops applying. If you are unsure how that applies to your project, call the permit office at 408-299-5700 before you start.
- How much does a fence permit cost in Santa Clara County?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Nov 2026. For the figure on your own project, call the permit office at 408-299-5700.
- Where do you apply for a fence permit in Santa Clara County?
- You can apply through the Santa Clara County permit portal or contact the Santa Clara County Department of Planning and Development, Development Services (Building Inspection Office) directly. The links are listed on this page.
- Can a homeowner pull a fence permit themselves in Santa Clara County?
- Under California law (Business & Professions Code 7044(a)-(b); Business & Professions Code 7031.5): California exempts an owner from contractor licensing under section 7044 when they personally perform all the work on their own property, or any work they do not perform themselves is done by their own employees paid only wages, and none of the improvements are intended or offered for sale. It also exempts an owner who directly contracts with licensed contractors for each trade, as long as no more than four of the single-family residential structures involved are intended or offered for sale in a calendar year; this route does not apply if the owner instead contracts with a general contractor for the construction. A homeowner may also improve their own principal residence without a license, as long as the work is done before any sale, they have actually resided there for the 12 months before completion, and they have not used this exemption on more than two structures more than once in any three-year period. Selling a self-built structure within one year of completion creates a rebuttable presumption that it was built for sale, which defeats the exemption, and selling five or more structures within a year makes that presumption conclusive. Separately, every city or county that requires a permit must also require the applicant to file a signed statement giving their contractor license number or the basis of their claimed exemption; a false or missing statement carries a civil penalty of up to $500. Confirm how Santa Clara County applies this before you apply.
From the Library
Fence Permit in other California localities
Everything above, sourced
How this fence permit page for Santa Clara County was verified. 2 official sources: plandev.santaclaracounty.gov, library.municode.com; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Santa Clara County Department of Planning and Development, Development Services (Building Inspection Office). Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page