California / Santa Clara County
Roof Replacement Permit in Santa Clara County, California
Permit required
Yes, a permit is required
Before replacing or re-covering a roof on a home in the unincorporated county. Reroofing is not on the county's list of work exempt from a permit, so it needs a building permit before work starts.
Quick answer
Santa Clara County's adopted work-exempt-from-permit list under California Residential Code Section R105.2 contains eleven items covering sheds, fences, retaining walls, water tanks, sidewalks and driveways, finish work, shallow prefabricated pools, playground equipment, window awnings, small detached decks and hoop structures. Roof replacement is not among them, so Ordinance Code Section C1-67 applies and a building permit is required before the work is performed, and the county's fee schedule carries a dedicated flat reroof permit fee that confirms reroofs are permitted work. Fire rules bite hard here: the county amended California Building Code Section 1505.1.2 so that roofing for structures in Fire Hazard Severity Zones or the Wildland-Urban Interface must also comply with Part 7, Section 507.1 of the County Wildland-Urban Interface Code, which is the section governing replacement or repair of roof coverings.
- Issued by
- Santa Clara County Department of Planning and Development, Development Services (Building Inspection Office)
- Phone
- 408-299-5700
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
Roofers handle the permit in most localities when one is required. Comparing bids before you sign is the useful next step.
Compare roofing quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What a roof replacement permit costs in Santa Clara County
- Fee basis
- Project valuation
- Fee schedule in force
- Official scheduleRead .
Reroof up to 5,000 square feet is a flat fee under the county's Building Fee Schedule - FY 2026-2027 (effective July 18, 2026): $513.00 for Comp and $513.00 for Wood / Tile / Metal. Over 5,000 square feet the reroof is charged by valuation.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How Santa Clara County compares in California
No California jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.
| Jurisdiction | Permit needed? | Typical fee |
|---|---|---|
| Alameda County | It depends | A re-roof permit is priced from construction valuation on the Schedule A building permit fee table; the schedule has the rest |
| Contra Costa County | Permit required | Land Development Fee Schedule item 14, "Re-Roofs - Residential": Building Permit / Inspection $150.00 per permit and Processing $38.00 per permit |
| Fresno County | Permit required | Single family residential: $201.47 per structure for FY 2026-27 |
| Los Angeles | Permit required | Valuation-based building permit per LAMC Table No. 1-A |
| Los Angeles County | Permit required | See schedule |
| Orange County | Permit required | Reroof: $342 for FY 2024-25, $362 for FY 2025-26, $370 for FY 2026-27 |
| Santa Clara Countythis page | Permit required | See schedule |
How to apply in Santa Clara County
General guide, not specific to this office
What a roof replacement permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a roof replacement permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
Santa Clara County Department of Planning and Development, Development Services (Building Inspection Office)
- County Government Center, East Wing, 7th Floor, 70 West Hedding Street, San Jose, CA 95110
- Phone: 408-299-5700
Your Roof Replacement Permit checklist for Santa Clara County
- Confirm the requirement. Yes, a permit is required. Read the rule where we read it: plandev.santaclaracounty.gov: apply building permit.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Santa Clara County permit portal.
- Keep the office details handy. Santa Clara County Department of Planning and Development, Development Services (Building Inspection Office). Phone: 408-299-5700. Address: County Government Center, East Wing, 7th Floor, 70 West Hedding Street, San Jose, CA 95110.
Compiled from the official sources on this page. Last checked .
Permitting activity in Santa Clara County
In 2025, Santa Clara County authorized permits for 5,323 new residential housing units (1,795 single-family, 3,528 in multi-family buildings), valued at $1.3B, up from 3,834 the year before. That works out to about 2.8 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 1,914,391.
What else needs a permit in Santa Clara County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | deck area, paired with a 30-inch height limit, no attachment to the dwelling, and no required exit door served | No deck-specific flat fee is published |
| Electrical Permit | Permit required | Any size | See schedule |
| Fence Permit | It depends | fence height at which the County Residential Code permit exemption stops applying | See schedule |
| HVAC Permit | Permit required | Any size | See schedule |
| Patio Permit | It depends | Before building a patio cover, trellis, carport or similar roofed structure over a patio | No patio cover-specific flat fee is published |
| Plumbing Permit | Permit required | Any size | See schedule |
| Pool Permit | It depends | depth of a prefabricated swimming pool | See schedule |
| Shed Permit | It depends | floor area of a one-story detached tool or storage shed | No shed-specific flat fee is published |
| Solar Permit | Permit required | Any size | Residential solar under the county's Building Fee Schedule - FY 2026-2027 (effective July 18, 2026): Photovoltaic Roof Mount $950.00 |
Frequently asked questions
- Do you need a roof replacement permit in Santa Clara County?
- Yes, before replacing or re-covering a roof on a home in the unincorporated county. Reroofing is not on the county's list of work exempt from a permit, so it needs a building permit before work starts. If you are unsure how that applies to your project, call the permit office at 408-299-5700 before you start.
- How much does a roof replacement permit cost in Santa Clara County?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Nov 2026. For the figure on your own project, call the permit office at 408-299-5700.
- Where do you apply for a roof replacement permit in Santa Clara County?
- You can apply through the Santa Clara County permit portal or contact the Santa Clara County Department of Planning and Development, Development Services (Building Inspection Office) directly. The links are listed on this page.
- Can a homeowner pull a roof replacement permit themselves in Santa Clara County?
- Under California law (Business & Professions Code 7044(a)-(b); Business & Professions Code 7031.5): California exempts an owner from contractor licensing under section 7044 when they personally perform all the work on their own property, or any work they do not perform themselves is done by their own employees paid only wages, and none of the improvements are intended or offered for sale. It also exempts an owner who directly contracts with licensed contractors for each trade, as long as no more than four of the single-family residential structures involved are intended or offered for sale in a calendar year; this route does not apply if the owner instead contracts with a general contractor for the construction. A homeowner may also improve their own principal residence without a license, as long as the work is done before any sale, they have actually resided there for the 12 months before completion, and they have not used this exemption on more than two structures more than once in any three-year period. Selling a self-built structure within one year of completion creates a rebuttable presumption that it was built for sale, which defeats the exemption, and selling five or more structures within a year makes that presumption conclusive. Separately, every city or county that requires a permit must also require the applicant to file a signed statement giving their contractor license number or the basis of their claimed exemption; a false or missing statement carries a civil penalty of up to $500. Confirm how Santa Clara County applies this before you apply.
From the Library
Roof Replacement Permit in other California localities
Everything above, sourced
How this roof replacement permit page for Santa Clara County was verified. 2 official sources: plandev.santaclaracounty.gov, library.municode.com; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Santa Clara County Department of Planning and Development, Development Services (Building Inspection Office). Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page