It depends
Sometimes, depending on the project
Before installing any swimming pool 24 inches or more deep, and before installing an in-ground pool of any depth. Only a prefabricated pool less than 24 inches deep is exempt from a building permit.
Quick answer
The county's adopted California Residential Code Section R105.2 list exempts only prefabricated swimming pools that are less than 24 inches deep, so any deeper or in-ground residential pool needs a building permit. The same 24-inch line runs through the county's swimming pool ordinance: Ordinance Code Section B18-1 defines a private swimming pool as an artificial body of water at a residence with any depth in excess of 24 inches, above or below grade and temporary or permanent, and Section B18-2 requires that pool to be completely enclosed by a fence, wall or other structure at least 5 feet high with no opening, hole or gap wider than 4 inches. Section B18-5 makes the enclosure a structure under the county building code and withholds final inspection until the enclosure and gate requirements are met. Zoning Ordinance Section 4.20.020.J requires the pool and its filters, pumps and appurtenant machinery to sit at least 5 feet from any property line or right-of-way.
- Typical threshold
- depth of a prefabricated swimming pool
- Issued by
- Santa Clara County Department of Planning and Development, Development Services (Building Inspection Office)
- Phone
- 408-299-5700
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
Pool builders handle the permit and its safety requirements as part of the job. Comparing a few bids before you sign is the useful next step.
Compare pool builder quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What a pool permit costs in Santa Clara County
- Fee schedule in force
- Official scheduleRead .
- The county charges single-family residential swimming pools as flat fees under the county's Building Fee Schedule - FY 2026-2027 (effective July 18, 2026): In Ground plan check $1,890.00 and inspection (includes B, M, E, P permit fees) $1,931.00;
- In Ground - Supported on Pier plan check $2,520.00 and inspection $2,552.00;
- Above Ground plan check $1,890.00 and inspection $1,325.00.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How Santa Clara County compares in California
| Jurisdiction | Permit needed? | Threshold |
|---|---|---|
| Alameda County | It depends | Depth of a prefabricated pool at which the building permit exemption stops; the exemption also requires the pool to hold no more than 5,000 gallons and to be installed entirely above ground |
| Contra Costa County | It depends | depth of a prefabricated pool accessory to a one or two family dwelling that is installed entirely above ground and holds no more than 5,000 gallons |
| Fresno County | It depends | Prefabricated pools accessory to a Group R-3 occupancy are exempt from a building permit only when they are less than 24 inches deep, hold not more than 5,000 gallons, and are installed entirely above ground |
| Los Angeles | Permit required | swimming, bathing, and wading pools not exceeding 24 inches in depth and having a surface area not exceeding 250 square feet are exempt from a permit |
| Los Angeles County | It depends | depth of a prefabricated pool or other body of water accessory to a one- or two-family (Group R-3) home; the same exemption also reaches pools that do not exceed 5,000 gallons and are installed entirely above adjacent grade |
| Orange County | Permit required | Any size |
| Santa Clara Countythis page | It depends | depth of a prefabricated swimming pool |
How to apply in Santa Clara County
General guide, not specific to this office
What a pool permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a pool permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
Santa Clara County Department of Planning and Development, Development Services (Building Inspection Office)
- County Government Center, East Wing, 7th Floor, 70 West Hedding Street, San Jose, CA 95110
- Phone: 408-299-5700
Your Pool Permit checklist for Santa Clara County
- Confirm the requirement. Sometimes, depending on the project. Typical threshold: depth of a prefabricated swimming pool. Read the rule where we read it: plandev.santaclaracounty.gov: apply building permit.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Santa Clara County permit portal.
- Keep the office details handy. Santa Clara County Department of Planning and Development, Development Services (Building Inspection Office). Phone: 408-299-5700. Address: County Government Center, East Wing, 7th Floor, 70 West Hedding Street, San Jose, CA 95110.
Compiled from the official sources on this page. Last checked .
Permitting activity in Santa Clara County
In 2025, Santa Clara County authorized permits for 5,323 new residential housing units (1,795 single-family, 3,528 in multi-family buildings), valued at $1.3B, up from 3,834 the year before. That works out to about 2.8 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 1,914,391.
What else needs a permit in Santa Clara County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | deck area, paired with a 30-inch height limit, no attachment to the dwelling, and no required exit door served | No deck-specific flat fee is published |
| Electrical Permit | Permit required | Any size | See schedule |
| Fence Permit | It depends | fence height at which the County Residential Code permit exemption stops applying | See schedule |
| HVAC Permit | Permit required | Any size | See schedule |
| Patio Permit | It depends | Before building a patio cover, trellis, carport or similar roofed structure over a patio | No patio cover-specific flat fee is published |
| Plumbing Permit | Permit required | Any size | See schedule |
| Roof Replacement Permit | Permit required | Any size | See schedule |
| Shed Permit | It depends | floor area of a one-story detached tool or storage shed | No shed-specific flat fee is published |
| Solar Permit | Permit required | Any size | Residential solar under the county's Building Fee Schedule - FY 2026-2027 (effective July 18, 2026): Photovoltaic Roof Mount $950.00 |
Frequently asked questions
- Do you need a pool permit in Santa Clara County?
- It depends on the project. Depth of a prefabricated swimming pool. If you are unsure how that applies to your project, call the permit office at 408-299-5700 before you start.
- How much does a pool permit cost in Santa Clara County?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Nov 2026. For the figure on your own project, call the permit office at 408-299-5700.
- Where do you apply for a pool permit in Santa Clara County?
- You can apply through the Santa Clara County permit portal or contact the Santa Clara County Department of Planning and Development, Development Services (Building Inspection Office) directly. The links are listed on this page.
- Can a homeowner pull a pool permit themselves in Santa Clara County?
- Under California law (Business & Professions Code 7044(a)-(b); Business & Professions Code 7031.5): California exempts an owner from contractor licensing under section 7044 when they personally perform all the work on their own property, or any work they do not perform themselves is done by their own employees paid only wages, and none of the improvements are intended or offered for sale. It also exempts an owner who directly contracts with licensed contractors for each trade, as long as no more than four of the single-family residential structures involved are intended or offered for sale in a calendar year; this route does not apply if the owner instead contracts with a general contractor for the construction. A homeowner may also improve their own principal residence without a license, as long as the work is done before any sale, they have actually resided there for the 12 months before completion, and they have not used this exemption on more than two structures more than once in any three-year period. Selling a self-built structure within one year of completion creates a rebuttable presumption that it was built for sale, which defeats the exemption, and selling five or more structures within a year makes that presumption conclusive. Separately, every city or county that requires a permit must also require the applicant to file a signed statement giving their contractor license number or the basis of their claimed exemption; a false or missing statement carries a civil penalty of up to $500. Confirm how Santa Clara County applies this before you apply.
From the Library
Pool Permit in other California localities
Everything above, sourced
How this pool permit page for Santa Clara County was verified. 2 official sources: plandev.santaclaracounty.gov, library.municode.com; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Santa Clara County Department of Planning and Development, Development Services (Building Inspection Office). Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page