California / Santa Clara County

Pool Permit in Santa Clara County, California

It depends

Sometimes, depending on the project

Before installing any swimming pool 24 inches or more deep, and before installing an in-ground pool of any depth. Only a prefabricated pool less than 24 inches deep is exempt from a building permit.

Confirmed on official page Verified Santa Clara County Department of Planning and Development, Development Services (Building Inspection Office)

By Mario Bailey, verified against official sources

Quick answer

The county's adopted California Residential Code Section R105.2 list exempts only prefabricated swimming pools that are less than 24 inches deep, so any deeper or in-ground residential pool needs a building permit. The same 24-inch line runs through the county's swimming pool ordinance: Ordinance Code Section B18-1 defines a private swimming pool as an artificial body of water at a residence with any depth in excess of 24 inches, above or below grade and temporary or permanent, and Section B18-2 requires that pool to be completely enclosed by a fence, wall or other structure at least 5 feet high with no opening, hole or gap wider than 4 inches. Section B18-5 makes the enclosure a structure under the county building code and withholds final inspection until the enclosure and gate requirements are met. Zoning Ordinance Section 4.20.020.J requires the pool and its filters, pumps and appurtenant machinery to sit at least 5 feet from any property line or right-of-way.

Typical threshold: depth of a prefabricated swimming pool.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?

When a permit is usually needed

Before installing any swimming pool 24 inches or more deep, and before installing an in-ground pool of any depth. Only a prefabricated pool less than 24 inches deep is exempt from a building permit.

What a pool permit costs in Santa Clara County

Line item
pool permitBy formulaThe county charges single-family residential swimming pools as flat fees. Under the Building Section Services Fee Schedule effective July 1, 2025: In Ground plan check $791.40 and In Ground inspection (includes B, M, E, P permit fees) $1,341.70; Above Ground plan check $488.70 and Above Ground inspection (includes B, M, E, P permit fees) $938.10. Adopted by the Board of Supervisors on January 23, 2024.

How Santa Clara County compares in California

JurisdictionPermit needed?Threshold
Alameda CountyIt dependsDepth of a prefabricated pool at which the building permit exemption stops; the exemption also requires the pool to hold no more than 5,000 gallons and to be installed entirely above ground
Contra Costa CountyIt dependsdepth of a prefabricated pool accessory to a one or two family dwelling that is installed entirely above ground and holds no more than 5,000 gallons
Fresno CountyIt dependsPrefabricated pools accessory to a Group R-3 occupancy are exempt from a building permit only when they are less than 24 inches deep, hold not more than 5,000 gallons, and are installed entirely above ground
Los AngelesPermit requiredNot specified
Los Angeles CountyIt dependsdepth of a prefabricated pool or other body of water accessory to a one- or two-family (Group R-3) home; the same exemption also reaches pools that do not exceed 5,000 gallons and are installed entirely above adjacent grade
Orange CountyPermit requiredNot specified
Santa Clara Countythis pageIt dependsdepth of a prefabricated swimming pool

Closest pool permit thresholds outside California

Jurisdictions we cover whose limit sits nearest Santa Clara County's 24 inches of depth.

  • Pittsburgh, Pennsylvania, prefabricated pools accessory to a single-family or two-family dwelling that also hold no more than 5,000 gallons and are installed entirely above grade

How to apply in Santa Clara County

A residential pool permit application covers both construction and safety: a scaled site plan, structural plans for the pool, a barrier plan showing how the pool will be enclosed, and an electrical plan covering bonding and the equipment disconnect.

What most pool permit applications include:

  • Pool and spa design and construction fall under the residential code chapter that folds in the swimming pool and spa code, and permit review checks plans against that chapter (IRC R326).
  • The site plan must show pool equipment such as pumps, filters, and heaters set back at least 36 inches from the outside of the required barrier (ISPSC 305.2.9).
  • For an in-ground pool, engineered structural plans covering the shell and reinforcing steel, with the responsible structural engineer's license information, are a standard part of the submittal (per official pool submittal checklists).
  • A barrier plan identifying the fence, pool structure, or dwelling wall that will enclose the pool must be submitted and must comply with the code's barrier chapter (ISPSC 305).
  • Electrical plans must show the pool's equipotential bonding design, since the shell, perimeter surfaces, and metal fittings within 5 feet of the water must all tie into a common bonding grid (NEC 680.26).
  • The electrical plan must also show a disconnecting means for the pool equipment that is readily accessible and within sight of the equipment (NEC 680.13).

General submittal guidance from 2021 IRC R326 (adopting the ISPSC), ISPSC 2021 Section 305, and NEC 2020 Article 680. Source. Santa Clara County Department of Planning and Development, Development Services (Building Inspection Office) sets the exact checklist for Santa Clara County.

Where to apply in Santa Clara County:

Santa Clara County Department of Planning and Development, Development Services (Building Inspection Office)

  • County Government Center, East Wing, 7th Floor, 70 West Hedding Street, San Jose, CA 95110
  • Phone: 408-299-5700

Inspections and closing out your permit

Pool inspections track the concrete pour: the steel and bonding grid are checked before gunite or shotcrete goes in, bonding is checked again before decking is poured, and the permanent barrier and remaining electrical work are checked at final before the pool can be filled and used.

  1. Before gunite or shotcrete is sprayed, the inspector checks the rebar against the engineered plans and confirms the equipotential bonding wire is stubbed out and tied into the steel, since it will be buried in concrete afterward (NEC 680.26).
  2. A bonding inspection separately confirms coping, decking, ladders, handrail cups, and any other metal within 5 feet of the water are tied to the bonding grid, and it must pass before coping is installed (NEC 680.26).
  3. A temporary barrier at least 4 feet high must enclose the site from the moment excavation starts until the permanent barrier is finished, and inspectors check for it throughout construction (ISPSC 305.1.1).
  4. A pre-plaster inspection confirms the circulation equipment's electrical work is installed and all bonding is complete before the pool's interior finish goes on (NEC 680.26).
  5. At final inspection the permanent barrier is checked against the code's requirements and the equipment and cover-mechanism bonding must be complete before the pool can be filled and used (ISPSC 305, NEC 680.26).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Santa Clara County permit portal or by phone at 408-299-5700.

Inspection sequence from NEC 2020 Article 680.26 (equipotential bonding) and ISPSC 2021 Section 305 (barriers). Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need a pool permit in Santa Clara County?
The county's adopted California Residential Code Section R105.2 list exempts only prefabricated swimming pools that are less than 24 inches deep, so any deeper or in-ground residential pool needs a building permit. The same 24-inch line runs through the county's swimming pool ordinance: Ordinance Code Section B18-1 defines a private swimming pool as an artificial body of water at a residence with any depth in excess of 24 inches, above or below grade and temporary or permanent, and Section B18-2 requires that pool to be completely enclosed by a fence, wall or other structure at least 5 feet high with no opening, hole or gap wider than 4 inches. Section B18-5 makes the enclosure a structure under the county building code and withholds final inspection until the enclosure and gate requirements are met. Zoning Ordinance Section 4.20.020.J requires the pool and its filters, pumps and appurtenant machinery to sit at least 5 feet from any property line or right-of-way. Depth of a prefabricated swimming pool. Always confirm with the office before starting.
How much does a pool permit cost in Santa Clara County?
The county charges single-family residential swimming pools as flat fees. Under the Building Section Services Fee Schedule effective July 1, 2025: In Ground plan check $791.40 and In Ground inspection (includes B, M, E, P permit fees) $1,341.70; Above Ground plan check $488.70 and Above Ground inspection (includes B, M, E, P permit fees) $938.10. Adopted by the Board of Supervisors on January 23, 2024. Contact the office for current amounts.
Where do you apply for a pool permit in Santa Clara County?
You can apply through the Santa Clara County permit portal or contact the Santa Clara County Department of Planning and Development, Development Services (Building Inspection Office) directly. The links are listed on this page.
Can a homeowner pull a pool permit themselves in Santa Clara County?
Under California law (Business & Professions Code 7044(a)-(b); Business & Professions Code 7031.5): California exempts an owner-builder from contractor licensing when the owner personally performs the work, or uses only wage employees, on their own property and does not intend the improvements for sale. A homeowner may also directly hire licensed trade contractors for up to four single-family residences a year, or improve their own principal residence without a general contractor's license, as long as they have actually lived there for the 12 months before the work is finished. Selling a self-built structure within one year of completion creates a rebuttable presumption that it was built for sale, which defeats the exemption, and selling five or more structures within a year makes that presumption conclusive. Separately, every city or county that requires a building permit must also require the applicant to file a signed statement giving their contractor license number or the basis of their claimed exemption; a false or missing statement carries a $500 civil penalty. Confirm how Santa Clara County applies this before you apply.

From the Library

What else needs a permit in Santa Clara County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsdeck area, paired with a 30-inch height limit, no attachment to the dwelling, and no required exit door servedDecks are charged by valuation, not by a flat fee.
Electrical PermitPermit requiredNot specifiedUnder the county's Building Section Services Fee Schedule effective July 1, 2025 the...
Fence PermitIt dependsfence height at which the County Residential Code permit exemption stops applyingNo fence-specific permit fee is published.
HVAC PermitPermit requiredNot specifiedUnder the county's Building Section Services Fee Schedule effective July 1, 2025 the...
Patio PermitIt dependsNot specifiedNo patio-specific flat fee is published.
Plumbing PermitPermit requiredNot specifiedUnder the county's Building Section Services Fee Schedule effective July 1, 2025 the...
Roof Replacement PermitPermit requiredNot specifiedReroof up to 5,000 square feet is a flat fee under the county's Building Section...
Shed PermitIt dependsfloor area of a one-story detached tool or storage shedNo shed-specific flat fee is published.
Solar PermitPermit requiredNot specifiedSolar is charged as an electrical system only permit.

Pool Permit in other California localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not Santa Clara County documents; the office above sets the local rules.

Verified by a person against the sources above on , not confirmed with Santa Clara County Department of Planning and Development, Development Services (Building Inspection Office). Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Compare Pool Permit requirements across California localities

Look up an existing Santa Clara County permit record

It depends
Get quotes