Pool Permit in Sacramento, California
Permit required
We could not confirm this
Before constructing any residential swimming pool or spa
Issued byCity of Sacramento Community Development Department Building Division
By Mario Bailey, verified against official sources
Quick answer
A building permit is required for all residential swimming pools and spas in Sacramento. New pools at single-family homes must be equipped with at least two of seven California drowning prevention safety features, and a minimum 60-inch barrier is required around the pool. Electrical and plumbing permits are also required for pool utilities.
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
Pool builders handle the permit and its safety requirements as part of the job. Comparing a few bids before you sign is the useful next step.
Compare pool builder quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
When a permit is usually needed
Before constructing any residential swimming pool or spa
What a pool permit costs in Sacramento
How Sacramento compares in California
| Jurisdiction | Permit needed? | Threshold |
|---|---|---|
| Alameda County | It depends | Depth of a prefabricated pool at which the building permit exemption stops; the exemption also requires the pool to hold no more than 5,000 gallons and to be installed entirely above ground |
| Contra Costa County | It depends | depth of a prefabricated pool accessory to a one or two family dwelling that is installed entirely above ground and holds no more than 5,000 gallons |
| Fresno County | It depends | Prefabricated pools accessory to a Group R-3 occupancy are exempt from a building permit only when they are less than 24 inches deep, hold not more than 5,000 gallons, and are installed entirely above ground |
| Los Angeles | Permit required | Not specified |
| Los Angeles County | It depends | depth of a prefabricated pool or other body of water accessory to a one- or two-family (Group R-3) home; the same exemption also reaches pools that do not exceed 5,000 gallons and are installed entirely above adjacent grade |
| Orange County | Permit required | Not specified |
| Sacramentothis page | Permit required | Not specified |
How to apply in Sacramento
In Sacramento, a residential pool permit application covers both construction and safety: a scaled site plan, structural plans for the pool, a barrier plan showing how the pool will be enclosed, and an electrical plan covering bonding and the equipment disconnect.
What most pool permit applications include:
- Pool and spa design and construction fall under the residential code chapter that folds in the swimming pool and spa code, and permit review checks plans against that chapter (IRC R326).
- For Sacramento, the site plan must show pool equipment such as pumps, filters, and heaters set back at least 36 inches from the outside of the required barrier (ISPSC 305.2.9).
- For an in-ground pool, engineered structural plans covering the shell and reinforcing steel, with the responsible structural engineer's license information, are a standard part of the submittal (per official pool submittal checklists).
- For Sacramento, a barrier plan identifying the fence, pool structure, or dwelling wall that will enclose the pool must be submitted and must comply with the code's barrier chapter (ISPSC 305).
- Electrical plans must show the pool's equipotential bonding design, since the shell, perimeter surfaces, and metal fittings within 5 feet of the water must all tie into a common bonding grid (NEC 680.26).
- For Sacramento, the electrical plan must also show a disconnecting means for the pool equipment that is readily accessible and within sight of the equipment (NEC 680.13).
General submittal guidance from 2021 IRC R326 (adopting the ISPSC), ISPSC 2021 Section 305, and NEC 2020 Article 680. Source. City of Sacramento Community Development Department Building Division sets the exact checklist for Sacramento.
Where to apply in Sacramento:
City of Sacramento Community Development Department Building Division
- 300 Richards Blvd., 3rd Floor, Sacramento, CA 95811
- Phone: 916-808-5318
- Email: ezpermit@cityofsacramento.org
Pool Permit in Sacramento compared with nearby California localities
| Locality | Permit needed? | Threshold | What each California schedule says | Verified |
|---|---|---|---|---|
| Sacramento | Permit required | Not specified | Valuation-based building permit per CDD-0245 (rev 07-12-2026) using contract value or... | |
| Alameda County | It depends | Depth of a prefabricated pool at which the building permit exemption stops; the exemption also requires the pool to hold no more than 5,000 gallons and to be installed entirely above ground | No swimming pool line item appears in the Building Inspection Department Service Fee... | |
| Contra Costa County | It depends | depth of a prefabricated pool accessory to a one or two family dwelling that is installed entirely above ground and holds no more than 5,000 gallons | The Building Valuation Data Supplement sets a "Swimming pool, lump sum of: $39,514.98"... | |
| Fresno County | It depends | Prefabricated pools accessory to a Group R-3 occupancy are exempt from a building permit only when they are less than 24 inches deep, hold not more than 5,000 gallons, and are installed entirely above ground | Special Services Fees item 21, 'Installation of private swimming pool or spa includes... | |
| Los Angeles | Permit required | Not specified | The pool shell takes a valuation-based building permit with the LADBS Valuation Table... |
Inspections and closing out your permit
In Sacramento, pool inspections track the concrete pour: the steel and bonding grid are checked before gunite or shotcrete goes in, bonding is checked again before decking is poured, and the permanent barrier and remaining electrical work are checked at final before the pool can be filled and used.
- In Sacramento: before gunite or shotcrete is sprayed, the inspector checks the rebar against the engineered plans and confirms the equipotential bonding wire is stubbed out and tied into the steel, since it will be buried in concrete afterward (NEC 680.26).
- In Sacramento: a bonding inspection separately confirms coping, decking, ladders, handrail cups, and any other metal within 5 feet of the water are tied to the bonding grid, and it must pass before coping is installed (NEC 680.26).
- In Sacramento: a temporary barrier at least 4 feet high must enclose the site from the moment excavation starts until the permanent barrier is finished, and inspectors check for it throughout construction (ISPSC 305.1.1).
- In Sacramento: a pre-plaster inspection confirms the circulation equipment's electrical work is installed and all bonding is complete before the pool's interior finish goes on (NEC 680.26).
- In Sacramento: at final inspection the permanent barrier is checked against the code's requirements and the equipment and cover-mechanism bonding must be complete before the pool can be filled and used (ISPSC 305, NEC 680.26).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Sacramento permit portal or by phone at 916-808-5318.
Inspection sequence from NEC 2020 Article 680.26 (equipotential bonding) and ISPSC 2021 Section 305 (barriers). Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Pool Permit checklist for Sacramento
- Confirm the requirement. Yes, a permit is required. Usually needed: Before constructing any residential swimming pool or spa.
- Budget the fee. Valuation-based building permit per CDD-0245 (rev 07-12-2026) using contract value or ICC valuation whichever is higher, $75 minimum permit plus $32 plan review, with additional fire, general plan, green building, strong motion and technology fees per the city's pool fee page. Official fee schedule.
- Apply. In Sacramento, a residential pool permit application covers both construction and safety: a scaled site plan, structural plans for the pool, a barrier plan showing how the pool will be enclosed, and an electrical plan covering bonding and the equipment disconnect. Start at the Sacramento permit portal.
- Keep the office details handy. City of Sacramento Community Development Department Building Division. Phone: 916-808-5318. Address: 300 Richards Blvd., 3rd Floor, Sacramento, CA 95811.
- Plan for inspections. In Sacramento, pool inspections track the concrete pour: the steel and bonding grid are checked before gunite or shotcrete goes in, bonding is checked again before decking is poured, and the permanent barrier and remaining electrical work are checked at final before the pool can be filled and used.
Compiled from the official sources on this page. Last checked .
Permitting activity in Sacramento
In 2024, Sacramento authorized permits for 2,043 new residential housing units (708 single-family, 1,335 in multi-family buildings), valued at $487M, down from 2,517 the year before. That works out to about 4 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2024 annual data · population 512,838.
About Sacramento
Sacramento has about 210,621 housing units. The median home is valued at $484,600, against a median household income of $83,753. About 51% of homes are owner-occupied, and the typical home was built around 1976.
Source: U.S. Census Bureau, American Community Survey 2023 5-year.
Frequently asked questions
- Do you need a pool permit in Sacramento?
- A building permit is required for all residential swimming pools and spas in Sacramento. New pools at single-family homes must be equipped with at least two of seven California drowning prevention safety features, and a minimum 60-inch barrier is required around the pool. Electrical and plumbing permits are also required for pool utilities. Always confirm with the City of Sacramento Community Development Department Building Division before starting.
- How much does a pool permit cost in Sacramento?
- Valuation-based building permit per CDD-0245 (rev 07-12-2026) using contract value or ICC valuation whichever is higher, $75 minimum permit plus $32 plan review, with additional fire, general plan, green building, strong motion and technology fees per the city's pool fee page. See the official fee schedule for current amounts.
- Where do you apply for a pool permit in Sacramento?
- You can apply through the Sacramento permit portal or contact the City of Sacramento Community Development Department Building Division directly. The links are listed on this page.
- Can a homeowner pull a pool permit themselves in Sacramento?
- Under California law (Business & Professions Code 7044(a)-(b); Business & Professions Code 7031.5): California exempts an owner-builder from contractor licensing when the owner personally performs the work, or uses only wage employees, on their own property and does not intend the improvements for sale. A homeowner may also directly hire licensed trade contractors for up to four single-family residences a year, or improve their own principal residence without a general contractor's license, as long as they have actually lived there for the 12 months before the work is finished. Selling a self-built structure within one year of completion creates a rebuttable presumption that it was built for sale, which defeats the exemption, and selling five or more structures within a year makes that presumption conclusive. Separately, every city or county that requires a building permit must also require the applicant to file a signed statement giving their contractor license number or the basis of their claimed exemption; a false or missing statement carries a $500 civil penalty. Confirm how Sacramento applies this before you apply.
From the Library
What else needs a permit in Sacramento
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | uncovered deck 30 inches or more above grade requires a building permit | Valuation-based building permit per CDD-0245 (rev 07-12-2026), printed minimum $75... |
| Electrical Permit | Permit required | Not specified | Flat $105 permit fee for one-trade minor electrical work such as a panel change-out... |
| Fence Permit | It depends | fence over 7 feet in height requires a building permit | Valuation-based building permit per CDD-0245 (rev 07-12-2026), printed minimum $75... |
| HVAC Permit | Permit required | Not specified | Flat $175 permit fee for HVAC change-outs and new installations plus a 10% technology... |
| Patio Permit | It depends | covered patios and patio covers require a building permit; at-grade sidewalks and driveways are exempt, as are unattached decks up to 200 sq ft and no more than 30 inches above grade | Patio covers are valued at $34.50 per square foot per CDD-0245's construction valuation... |
| Plumbing Permit | Permit required | Not specified | Flat $105 permit fee for one-trade minor plumbing work such as sewer repair, re-plumbing... |
| Roof Replacement Permit | It depends | roof replacement involving structural framing or sheathing changes requires a permit; replacing only the roof covering may be exempt | Flat $175 permit fee for re-roofs plus a 10% technology surcharge, per CDD-0245 (rev... |
| Shed Permit | It depends | detached storage shed under 120 sq ft without electrical or plumbing does not require a permit | Valuation-based building permit per CDD-0245 (rev 07-12-2026), $75 minimum permit plus... |
| Solar Permit | Permit required | Not specified | Valuation-based building permit per CDD-0245 (rev 07-12-2026) using contract or... |
Pool Permit in other California localities
Everything above, sourced
Code references
National and state model-code sections the general guidance on this page is drawn from. They are not Sacramento documents; the office above sets the local rules.
How this pool permit page for Sacramento was verified. 2 official sources: cityofsacramento.gov, cityofsacramento.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Sacramento Community Development Department Building Division. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page
Compare Pool Permit requirements across California localities
Permit office
City of Sacramento Community Development Department Building Division
916-808-5318Permit portal