California / Sacramento

Pool Permit in Sacramento, California

By Mario Bailey Last checked 2026-06-18 · 2 official sources

Verified against official sources Based on building code

Permit required

Quick answer

A building permit is required for all residential swimming pools and spas in Sacramento. New pools at single-family homes must be equipped with at least two of seven California drowning prevention safety features, and a minimum 60-inch barrier is required around the pool. Electrical and plumbing permits are also required for pool utilities.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?
Want a pro to handle this permit? Request free help

Tell us where your project stands. Free to ask; no obligation.

Where we have a vetted local pro who handles permits in Sacramento, we connect you; otherwise we reply with the exact steps and office links for your situation. PermitNotebook is not a government agency and does not file permits. This is a free referral request; we may earn a fee if you hire a pro we introduce. Partners never influence our permit data. Privacy policy.

When a permit is usually needed

Before constructing any residential swimming pool or spa

What pool permit costs in Sacramento

Valuation-based building permit per CDD-0245 (rev 07-12-2026) using contract value or ICC valuation whichever is higher, $75 minimum permit plus $32 plan review, with additional fire, general plan, green building, strong motion and technology fees per the city's pool fee page.

Official fee schedule

How Sacramento compares in California

No California jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.

JurisdictionPermit needed?Typical fee
Los AngelesPermit requiredThe pool shell takes a valuation-based building permit with the LADBS Valuati...
Sacramentothis pagePermit requiredValuation-based building permit per CDD-0245 (rev 07-12-2026) using contract...
San DiegoIt dependsPer IB-501 Table 501C effective May 2026: Pool/Spa per master plan for a sing...
San JosePermit requiredBase permit issuance $227 plus base plan review $325 plus base inspection $36...

How to apply in Sacramento

A residential pool permit application covers both construction and safety: a scaled site plan, structural plans for the pool, a barrier plan showing how the pool will be enclosed, and an electrical plan covering bonding and the equipment disconnect.

What most pool permit applications include:

  • Pool and spa design and construction fall under the residential code chapter that folds in the swimming pool and spa code, and permit review checks plans against that chapter (IRC R326).
  • The site plan must show pool equipment such as pumps, filters, and heaters set back at least 36 inches from the outside of the required barrier (ISPSC 305.2.9).
  • For an in-ground pool, engineered structural plans covering the shell and reinforcing steel, with the responsible structural engineer's license information, are a standard part of the submittal (per official pool submittal checklists).
  • A barrier plan identifying the fence, pool structure, or dwelling wall that will enclose the pool must be submitted and must comply with the code's barrier chapter (ISPSC 305).
  • Electrical plans must show the pool's equipotential bonding design, since the shell, perimeter surfaces, and metal fittings within 5 feet of the water must all tie into a common bonding grid (NEC 680.26).
  • The electrical plan must also show a disconnecting means for the pool equipment that is readily accessible and within sight of the equipment (NEC 680.13).

General submittal guidance from 2021 IRC R326 (adopting the ISPSC), ISPSC 2021 Section 305, and NEC 2020 Article 680. Source. City of Sacramento Community Development Department Building Division sets the exact checklist for Sacramento.

Where to apply in Sacramento:

City of Sacramento Community Development Department Building Division

Inspections and closing out your permit

Pool inspections track the concrete pour: the steel and bonding grid are checked before gunite or shotcrete goes in, bonding is checked again before decking is poured, and the permanent barrier and remaining electrical work are checked at final before the pool can be filled and used.

  1. Before gunite or shotcrete is sprayed, the inspector checks the rebar against the engineered plans and confirms the equipotential bonding wire is stubbed out and tied into the steel, since it will be buried in concrete afterward (NEC 680.26).
  2. A bonding inspection separately confirms coping, decking, ladders, handrail cups, and any other metal within 5 feet of the water are tied to the bonding grid, and it must pass before coping is installed (NEC 680.26).
  3. A temporary barrier at least 4 feet high must enclose the site from the moment excavation starts until the permanent barrier is finished, and inspectors check for it throughout construction (ISPSC 305.1.1).
  4. A pre-plaster inspection confirms the circulation equipment's electrical work is installed and all bonding is complete before the pool's interior finish goes on (NEC 680.26).
  5. At final inspection the permanent barrier is checked against the code's requirements and the equipment and cover-mechanism bonding must be complete before the pool can be filled and used (ISPSC 305, NEC 680.26).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Sacramento permit portal or by phone at 916-808-5318.

Inspection sequence from NEC 2020 Article 680.26 (equipotential bonding) and ISPSC 2021 Section 305 (barriers). Source. An open permit left un-inspected can surface later in a title search or home sale.

Permitting activity in Sacramento

In 2024, Sacramento authorized permits for 2,043 new residential housing units (708 single-family, 1,335 in multi-family buildings), valued at $487M, down from2,517 the year before. That works out to about 4 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2024 annual data · population 512,838.

About Sacramento

Sacramento has about 210,621 housing units. The median home is valued at $484,600, against a median household income of $83,753. About 51% of homes are owner-occupied, and the typical home was built around 1976.

Source: U.S. Census Bureau, American Community Survey 2023 5-year.

Frequently asked questions

Do you need a pool permit in Sacramento?
A building permit is required for all residential swimming pools and spas in Sacramento. New pools at single-family homes must be equipped with at least two of seven California drowning prevention safety features, and a minimum 60-inch barrier is required around the pool. Electrical and plumbing permits are also required for pool utilities. Always confirm with the City of Sacramento Community Development Department Building Division before starting.
How much does a pool permit cost in Sacramento?
Valuation-based building permit per CDD-0245 (rev 07-12-2026) using contract value or ICC valuation whichever is higher, $75 minimum permit plus $32 plan review, with additional fire, general plan, green building, strong motion and technology fees per the city's pool fee page. See the official fee schedule for current amounts.
Where do you apply for a pool permit in Sacramento?
You can apply through the Sacramento permit portal or contact the City of Sacramento Community Development Department Building Division directly. The links are listed on this page.

From the Library

What else needs a permit in Sacramento

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsuncovered deck 30 inches or more above grade requires a building permitValuation-based building permit per CDD-0245 (rev 07-12-2026), printed minimum $75 perm...
Electrical PermitPermit requiredNot specifiedFlat $105 permit fee for one-trade minor electrical work such as a panel change-out, re...
Fence PermitIt dependsfence over 7 feet in height requires a building permitValuation-based building permit per CDD-0245 (rev 07-12-2026), printed minimum $75 perm...
HVAC PermitPermit requiredNot specifiedFlat $175 permit fee for HVAC change-outs and new installations plus a 10% technology s...
Patio PermitIt dependscovered patios and patio covers require a building permit; at-grade sidewalks and driveways are exempt, as are unattached decks up to 200 sq ft and no more than 30 inches above gradePatio covers are valued at $34.50 per square foot per CDD-0245's construction valuation...
Plumbing PermitPermit requiredNot specifiedFlat $105 permit fee for one-trade minor plumbing work such as sewer repair, re-plumbin...
Roof Replacement PermitIt dependsroof replacement involving structural framing or sheathing changes requires a permit; replacing only the roof covering may be exemptFlat $175 permit fee for re-roofs plus a 10% technology surcharge, per CDD-0245 (rev 07...
Shed PermitIt dependsdetached storage shed under 120 sq ft without electrical or plumbing does not require a permitValuation-based building permit per CDD-0245 (rev 07-12-2026), $75 minimum permit plus...
Solar PermitPermit requiredNot specifiedValuation-based building permit per CDD-0245 (rev 07-12-2026) using contract or equipme...

Pool Permit in other California localities

Official sources

Verified by a person against the sources above on 2026-06-18, not confirmed with City of Sacramento Community Development Department Building Division. Rules change; confirm before you build. How we verify.

Last checked: 2026-06-18Report an error on this page