Patio Permit in Sacramento, California
It depends
Sometimes, depending on the project
For any covered patio or patio cover, or a deck over 200 sq ft or more than 30 inches above grade
Issued byCity of Sacramento Community Development Department Building Division
By Mario Bailey, verified against official sources
Quick answer
Sacramento requires a building permit for decks and patio covers. At-grade flatwork such as sidewalks and driveways is exempt, and unattached decks up to 200 square feet and no more than 30 inches above grade are also exempt. Fencing and site work are separately subject to Planning Division approval.
Typical threshold: covered patios and patio covers require a building permit; at-grade sidewalks and driveways are exempt, as are unattached decks up to 200 sq ft and no more than 30 inches above grade.
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
If a contractor builds your patio, they usually handle any required permit as part of the job. Compare a few bids before you commit.
Compare patio contractor quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
When a permit is usually needed
For any covered patio or patio cover, or a deck over 200 sq ft or more than 30 inches above grade
What a patio permit costs in Sacramento
How Sacramento compares in California
| Jurisdiction | Permit needed? | Threshold |
|---|---|---|
| Alameda County | It depends | Total area of each sunshade structure, including any roofed area, at which the building permit exemption stops; the exemption also requires an average height of not more than 10 feet |
| Contra Costa County | It depends | roof area of a trellis, arbor, or pergola accessory to a residence, treated by the county as a one-story detached accessory structure |
| Fresno County | Permit required | Not specified |
| Los Angeles | Permit required | Not specified |
| Los Angeles County | It depends | Not specified |
| Orange County | Permit required | Not specified |
| Sacramentothis page | It depends | covered patios and patio covers require a building permit; at-grade sidewalks and driveways are exempt, as are unattached decks up to 200 sq ft and no more than 30 inches above grade |
How to apply in Sacramento
In Sacramento, applying for a patio permit means submitting a site plan and framing plans for a roofed patio cover, since a cover is treated as its own permitted structure regardless of size. A plain concrete or paver patio slab at or near grade is, by contrast, often exempt from that same building permit requirement.
What most patio permit applications include:
- Filing a permit application with the local building department, which only the property owner or an authorized agent may sign, since a patio cover is treated as its own permitted structure regardless of size (IRC R105.1).
- For Sacramento, a scaled site plan showing the new patio cover's size and location relative to the house and other existing structures, with dimensioned distances to all property lines so required setbacks can be verified before the permit is approved (IRC R106.2).
- Construction documents such as a framing plan and elevation, showing rafter or beam sizes and spacing, the distance between supporting posts, and the method of attachment to the house, drawn with enough clarity for the building official to confirm the work will conform to the code (IRC R106.1).
- For the roof structure itself, plans showing compliance with the patio cover appendix's structural limits, such as adequate footing sizes for the applied post loads, since a shallow slab on grade may substitute for a deeper footing only in limited cases up to about 750 pounds of load per post (IRC Appendix AH, Section AH105.2).
- By contrast, an at grade concrete or paver patio that is not attached to the dwelling and stays within the code's small flatwork thresholds, similar to a sidewalk, driveway, or low deck under 200 square feet and 30 inches high, commonly needs no building permit at all, so none of the plan review steps above apply (IRC R105.2).
General submittal guidance from 2021 International Residential Code (IRC), Sections R105 and R106, with Appendix AH Patio Covers (named Appendix H in the 2012, 2015, and 2018 editions). Source. City of Sacramento Community Development Department Building Division sets the exact checklist for Sacramento.
Where to apply in Sacramento:
City of Sacramento Community Development Department Building Division
- 300 Richards Blvd., 3rd Floor, Sacramento, CA 95811
- Phone: 916-808-5318
- Email: ezpermit@cityofsacramento.org
Patio Permit in Sacramento compared with nearby California localities
| Locality | Permit needed? | Threshold | What each California schedule says | Verified |
|---|---|---|---|---|
| Sacramento | It depends | covered patios and patio covers require a building permit; at-grade sidewalks and driveways are exempt, as are unattached decks up to 200 sq ft and no more than 30 inches above grade | Patio covers are valued at $34.50 per square foot per CDD-0245's construction valuation... | |
| Alameda County | It depends | Total area of each sunshade structure, including any roofed area, at which the building permit exemption stops; the exemption also requires an average height of not more than 10 feet | No patio cover line item appears in the Building Inspection Department Service Fee... | |
| Contra Costa County | It depends | roof area of a trellis, arbor, or pergola accessory to a residence, treated by the county as a one-story detached accessory structure | The Building Valuation Data Supplement values a "Patio cover (includes pre-fab types... | |
| Fresno County | Permit required | Not specified | No flat patio permit fee is published. | |
| Los Angeles | Permit required | Not specified | Valuation-based building permit per LAMC 91.113 Table 1-A |
Inspections and closing out your permit
In Sacramento, a permitted patio cover follows the same footing, frame, and final inspection sequence used for any small accessory structure, since the posts and roof framing have to be checked before they are covered and again once the work is done. An at grade patio slab that qualifies as exempt flatwork usually needs no building inspection at all, because inspections only attach to work that required a permit in the first place.
- In Sacramento: a footing inspection once the excavation, forms, and any reinforcing steel are in place but before concrete is poured, confirming the posts supporting a patio cover will bear on adequate footings (IRC R109.1.1).
- In Sacramento: a frame inspection after the rafters, beams, posts, and any required rough in work are in place but before the roof sheathing or covering material conceals them, since a solid patio cover roof cannot be signed off once it is covered without this check (IRC R109.1.4).
- In Sacramento: a final inspection once all permitted work, including roofing and post anchorage, is complete, which the code requires before the structure may be used (IRC R109.1.6).
- In Sacramento: an at grade concrete or paver patio that qualifies as exempt flatwork under the permit rules is not subject to any of these inspection stages, since the inspection sequence only attaches to work that required a permit in the first place (IRC R105.2).
- In Sacramento: each inspection has to be requested by the permit holder rather than happening automatically, and the approved plans and permit card need to be on site and available when the inspector arrives (IRC R109.3).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Sacramento permit portal or by phone at 916-808-5318.
Inspection sequence from 2021 International Residential Code (IRC), Section R109 (Inspections). Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Patio Permit checklist for Sacramento
- Confirm the requirement. Sometimes, depending on the project. Typical threshold: covered patios and patio covers require a building permit; at-grade sidewalks and driveways are exempt, as are unattached decks up to 200 sq ft and no more than 30 inches above grade. Usually needed: For any covered patio or patio cover, or a deck over 200 sq ft or more than 30 inches above grade.
- Budget the fee. Patio covers are valued at $34.50 per square foot per CDD-0245's construction valuation table (rev 07-12-2026), then charged per the valuation schedule with a $75 minimum permit plus $32 plan review. Official fee schedule.
- Apply. In Sacramento, applying for a patio permit means submitting a site plan and framing plans for a roofed patio cover, since a cover is treated as its own permitted structure regardless of size. A plain concrete or paver patio slab at or near grade is, by contrast, often exempt from that same building permit requirement. Start at the Sacramento permit portal.
- Keep the office details handy. City of Sacramento Community Development Department Building Division. Phone: 916-808-5318. Address: 300 Richards Blvd., 3rd Floor, Sacramento, CA 95811.
- Plan for inspections. In Sacramento, a permitted patio cover follows the same footing, frame, and final inspection sequence used for any small accessory structure, since the posts and roof framing have to be checked before they are covered and again once the work is done. An at grade patio slab that qualifies as exempt flatwork usually needs no building inspection at all, because inspections only attach to work that required a permit in the first place.
Compiled from the official sources on this page. Last checked .
Permitting activity in Sacramento
In 2024, Sacramento authorized permits for 2,043 new residential housing units (708 single-family, 1,335 in multi-family buildings), valued at $487M, down from 2,517 the year before. That works out to about 4 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2024 annual data · population 512,838.
About Sacramento
Sacramento has about 210,621 housing units. The median home is valued at $484,600, against a median household income of $83,753. About 51% of homes are owner-occupied, and the typical home was built around 1976.
Source: U.S. Census Bureau, American Community Survey 2023 5-year.
Frequently asked questions
- Do you need a patio permit in Sacramento?
- Sacramento requires a building permit for decks and patio covers. At-grade flatwork such as sidewalks and driveways is exempt, and unattached decks up to 200 square feet and no more than 30 inches above grade are also exempt. Fencing and site work are separately subject to Planning Division approval. Covered patios and patio covers require a building permit; at-grade sidewalks and driveways are exempt, as are unattached decks up to 200 sq ft and no more than 30 inches above grade. Always confirm with the office before starting.
- How much does a patio permit cost in Sacramento?
- Patio covers are valued at $34.50 per square foot per CDD-0245's construction valuation table (rev 07-12-2026), then charged per the valuation schedule with a $75 minimum permit plus $32 plan review. See the official fee schedule for current amounts.
- Where do you apply for a patio permit in Sacramento?
- You can apply through the Sacramento permit portal or contact the City of Sacramento Community Development Department Building Division directly. The links are listed on this page.
- Can a homeowner pull a patio permit themselves in Sacramento?
- Under California law (Business & Professions Code 7044(a)-(b); Business & Professions Code 7031.5): California exempts an owner-builder from contractor licensing when the owner personally performs the work, or uses only wage employees, on their own property and does not intend the improvements for sale. A homeowner may also directly hire licensed trade contractors for up to four single-family residences a year, or improve their own principal residence without a general contractor's license, as long as they have actually lived there for the 12 months before the work is finished. Selling a self-built structure within one year of completion creates a rebuttable presumption that it was built for sale, which defeats the exemption, and selling five or more structures within a year makes that presumption conclusive. Separately, every city or county that requires a building permit must also require the applicant to file a signed statement giving their contractor license number or the basis of their claimed exemption; a false or missing statement carries a $500 civil penalty. Confirm how Sacramento applies this before you apply.
From the Library
What else needs a permit in Sacramento
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | uncovered deck 30 inches or more above grade requires a building permit | Valuation-based building permit per CDD-0245 (rev 07-12-2026), printed minimum $75... |
| Electrical Permit | Permit required | Not specified | Flat $105 permit fee for one-trade minor electrical work such as a panel change-out... |
| Fence Permit | It depends | fence over 7 feet in height requires a building permit | Valuation-based building permit per CDD-0245 (rev 07-12-2026), printed minimum $75... |
| HVAC Permit | Permit required | Not specified | Flat $175 permit fee for HVAC change-outs and new installations plus a 10% technology... |
| Plumbing Permit | Permit required | Not specified | Flat $105 permit fee for one-trade minor plumbing work such as sewer repair, re-plumbing... |
| Pool Permit | Permit required | Not specified | Valuation-based building permit per CDD-0245 (rev 07-12-2026) using contract value or... |
| Roof Replacement Permit | It depends | roof replacement involving structural framing or sheathing changes requires a permit; replacing only the roof covering may be exempt | Flat $175 permit fee for re-roofs plus a 10% technology surcharge, per CDD-0245 (rev... |
| Shed Permit | It depends | detached storage shed under 120 sq ft without electrical or plumbing does not require a permit | Valuation-based building permit per CDD-0245 (rev 07-12-2026), $75 minimum permit plus... |
| Solar Permit | Permit required | Not specified | Valuation-based building permit per CDD-0245 (rev 07-12-2026) using contract or... |
Patio Permit in other California localities
Everything above, sourced
Code references
National and state model-code sections the general guidance on this page is drawn from. They are not Sacramento documents; the office above sets the local rules.
How this patio permit page for Sacramento was verified. 1 official source: cityofsacramento.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Sacramento Community Development Department Building Division. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page
Compare Patio Permit requirements across California localities
Permit office
City of Sacramento Community Development Department Building Division
916-808-5318Permit portal