Plumbing Permit in Sacramento, California
By Mario Bailey Last checked 2026-06-18 · 2 official sources
Verified against official sources Based on building codePermit required
Quick answer
A plumbing permit is required in Sacramento for water heater replacement, fixture additions, sewer connections, and repiping. Applications are submitted online through the Accela permit portal. A licensed plumber is typically required for permitted plumbing work. Contact the Building Division for applicability of homeowner exemptions.
Who is pulling this permit?
Apply yourself
Hire it out
Before you sign, ask the contractor:
- Who pulls the permit, you or me, and is the permit fee included in the bid?
- Which inspections will this job need, and who meets the inspector on site?
- Is your contractor license active in this locality, and under which business name?
Want a pro to handle this permit? Request free help
Tell us where your project stands. Free to ask; no obligation.
Where we have a vetted local pro who handles permits in Sacramento, we connect you; otherwise we reply with the exact steps and office links for your situation. PermitNotebook is not a government agency and does not file permits. This is a free referral request; we may earn a fee if you hire a pro we introduce. Partners never influence our permit data. Privacy policy.
When a permit is usually needed
For all new plumbing fixture additions water heater replacement and pipe work
What plumbing permit costs in Sacramento
Flat $105 permit fee for one-trade minor plumbing work such as sewer repair, re-plumbing or fixture replacement, plus a 10% technology surcharge, per CDD-0245 (rev 07-12-2026).
How Sacramento compares in California
No California jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.
| Jurisdiction | Permit needed? | Typical fee |
|---|---|---|
| Los Angeles | Permit required | Itemized per fixture per LADBS Fee Sch.5 (7/2017), for example a toilet at $2... |
| Sacramentothis page | Permit required | Flat $105 permit fee for one-trade minor plumbing work such as sewer repair,... |
| San Diego | Permit required | Billed per fixture under IB-103 Table 3B effective May 2026: water heater $12... |
| San Jose | Permit required | Greater of $315 per hour of actual inspection time or an itemized fixture-bas... |
How to apply in Sacramento
You apply for a residential plumbing permit at your local building department by filing an application that describes the scope of work and site, along with construction documents, before any regulated plumbing installation, alteration, or repair begins. Minor repairs that do not touch piping or fixtures are generally exempt, and once issued the permit only stays valid if work is started within its time limit.
What most plumbing permit applications include:
- A permit is required before any owner or authorized agent constructs, alters, repairs, removes, converts, or replaces a plumbing system regulated by the code (IRC R105.1).
- The application must identify and describe the work, describe the site, state the intended use and occupancy, and be signed by the applicant or an authorized agent (IRC R105.3).
- Two or more sets of construction documents must accompany the application, drawn with enough clarity to show the location, nature, and extent of the proposed plumbing work and how it will conform to code (IRC R106.1, R106.1.1).
- Minor plumbing repairs, such as clearing a stoppage or removing and resetting a water closet without rearranging pipes or fixtures, are exempt from permit (IRC R105.2).
- Once issued, a permit is only valid for a limited window, commonly 180 days, and becomes invalid if the work is not started or is abandoned within that time, though extensions can be requested (IRC R105.3.2, R105.5).
General submittal guidance from 2021 International Residential Code (IRC), Chapter 1 Scope and Administration, Sections R105 Permits and R106 Construction Documents. Source. City of Sacramento Community Development Department Building Division sets the exact checklist for Sacramento.
Where to apply in Sacramento:
City of Sacramento Community Development Department Building Division
- 300 Richards Blvd., 3rd Floor, Sacramento, CA 95811
- Phone: 916-808-5318
- Email: ezpermit@cityofsacramento.org
Inspections and closing out your permit
Plumbing inspections are timed to whatever is about to hide the pipe: underground and under-slab piping is checked before concrete covers it, rough-in piping is pressure or water tested before walls close up, and a final inspection checks every fixture and backflow protection once the work is complete.
- Piping and equipment placed under a slab or floor must be in place and inspected before any concrete is poured or floor sheathing is installed over it (IRC R109.1.1.1).
- Rough plumbing, along with the mechanical, gas, and electrical rough-in, must be inspected prior to covering or concealment and before fixtures or appliances are set (IRC R109.1.2).
- Rough drain, waste, and vent (DWV) piping is tested with water, air, or (for plastic piping) a vacuum, and must show no evidence of leakage before it is closed in (IRC P2503.5.1).
- The water-distribution piping is tested and must hold tight under the system's working pressure, or under a 50 psi air test for non-plastic piping, before it is concealed (IRC P2503.7).
- The framing inspection cannot proceed until the plumbing rough inspection, along with the mechanical and electrical rough inspections, has been approved (IRC R109.1.4).
- At the final drainage test, each fixture is filled and then drained, and its traps and fixture connections must prove watertight by visual inspection (IRC P2503.5.2).
- Final inspection is made after all work required by the permit is complete, and includes confirming backflow protection, such as vacuum breakers on hose bibbs, is installed (IRC R109.1.6, P2902.4.3).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Sacramento permit portal or by phone at 916-808-5318.
Inspection sequence from 2021 International Residential Code (IRC), Section R109 Inspections and Section P2503 Inspection and Tests. Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Plumbing Permit checklist for Sacramento
- Confirm the requirement. Yes, a permit is required. Usually needed: For all new plumbing fixture additions water heater replacement and pipe work.
- Budget the fee. Flat $105 permit fee for one-trade minor plumbing work such as sewer repair, re-plumbing or fixture replacement, plus a 10% technology surcharge, per CDD-0245 (rev 07-12-2026). Official fee schedule.
- Apply. You apply for a residential plumbing permit at your local building department by filing an application that describes the scope of work and site, along with construction documents, before any regulated plumbing installation, alteration, or repair begins. Minor repairs that do not touch piping or fixtures are generally exempt, and once issued the permit only stays valid if work is started within its time limit. Start at the Sacramento permit portal.
- Keep the office details handy. City of Sacramento Community Development Department Building Division. Phone: 916-808-5318. Address: 300 Richards Blvd., 3rd Floor, Sacramento, CA 95811.
- Plan for inspections. Plumbing inspections are timed to whatever is about to hide the pipe: underground and under-slab piping is checked before concrete covers it, rough-in piping is pressure or water tested before walls close up, and a final inspection checks every fixture and backflow protection once the work is complete.
Compiled from the official sources on this page. Last checked 2026-06-18.
The checklist stays on this page either way. We may send occasional verified rule-change notes for your area; unsubscribe anytime. See our privacy policy.
Permitting activity in Sacramento
In 2024, Sacramento authorized permits for 2,043 new residential housing units (708 single-family, 1,335 in multi-family buildings), valued at $487M, down from2,517 the year before. That works out to about 4 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2024 annual data · population 512,838.
About Sacramento
Sacramento has about 210,621 housing units. The median home is valued at $484,600, against a median household income of $83,753. About 51% of homes are owner-occupied, and the typical home was built around 1976.
Source: U.S. Census Bureau, American Community Survey 2023 5-year.
Frequently asked questions
- Do you need a plumbing permit in Sacramento?
- A plumbing permit is required in Sacramento for water heater replacement, fixture additions, sewer connections, and repiping. Applications are submitted online through the Accela permit portal. A licensed plumber is typically required for permitted plumbing work. Contact the Building Division for applicability of homeowner exemptions. Always confirm with the City of Sacramento Community Development Department Building Division before starting.
- How much does a plumbing permit cost in Sacramento?
- Flat $105 permit fee for one-trade minor plumbing work such as sewer repair, re-plumbing or fixture replacement, plus a 10% technology surcharge, per CDD-0245 (rev 07-12-2026). See the official fee schedule for current amounts.
- Where do you apply for a plumbing permit in Sacramento?
- You can apply through the Sacramento permit portal or contact the City of Sacramento Community Development Department Building Division directly. The links are listed on this page.
From the Library
What else needs a permit in Sacramento
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | uncovered deck 30 inches or more above grade requires a building permit | Valuation-based building permit per CDD-0245 (rev 07-12-2026), printed minimum $75 perm... |
| Electrical Permit | Permit required | Not specified | Flat $105 permit fee for one-trade minor electrical work such as a panel change-out, re... |
| Fence Permit | It depends | fence over 7 feet in height requires a building permit | Valuation-based building permit per CDD-0245 (rev 07-12-2026), printed minimum $75 perm... |
| HVAC Permit | Permit required | Not specified | Flat $175 permit fee for HVAC change-outs and new installations plus a 10% technology s... |
| Patio Permit | It depends | covered patios and patio covers require a building permit; at-grade sidewalks and driveways are exempt, as are unattached decks up to 200 sq ft and no more than 30 inches above grade | Patio covers are valued at $34.50 per square foot per CDD-0245's construction valuation... |
| Pool Permit | Permit required | Not specified | Valuation-based building permit per CDD-0245 (rev 07-12-2026) using contract value or I... |
| Roof Replacement Permit | It depends | roof replacement involving structural framing or sheathing changes requires a permit; replacing only the roof covering may be exempt | Flat $175 permit fee for re-roofs plus a 10% technology surcharge, per CDD-0245 (rev 07... |
| Shed Permit | It depends | detached storage shed under 120 sq ft without electrical or plumbing does not require a permit | Valuation-based building permit per CDD-0245 (rev 07-12-2026), $75 minimum permit plus... |
| Solar Permit | Permit required | Not specified | Valuation-based building permit per CDD-0245 (rev 07-12-2026) using contract or equipme... |
Plumbing Permit in other California localities
Official sources
Verified by a person against the sources above on 2026-06-18, not confirmed with City of Sacramento Community Development Department Building Division. Rules change; confirm before you build. How we verify.
Last checked: 2026-06-18Report an error on this page
Compare Plumbing Permit requirements across California localities
Permit office
City of Sacramento Community Development Department Building Division
916-808-5318Permit portal