California / Alameda County

Plumbing Permit in Alameda County, California

Permit required

Yes, a permit is required

Before installing or rearranging water, drain, waste, vent, or gas piping, replacing a water heater, or setting new plumbing fixtures in unincorporated Alameda County

Quick answer

Plumbing work in unincorporated Alameda County requires a permit from the Public Works Agency Building Inspection Department, which charges either 17% of the building permit fee when the plumbing is part of a larger project or a per-system fee starting at $140.00 when it stands alone. The county's plumbing exemptions under Ord. 15.20.030 are narrow: stopping leaks in a drain, soil, waste, or vent pipe, and clearing stoppages including removing and reinstalling a water closet or repairing leaks in pipes, valves, or fixtures, but only where the repair does not involve replacing or rearranging valves, pipes, or fixtures. The county states explicitly that if a defective trap, drainpipe, soil, waste, or vent pipe is replaced with new material, that counts as new work and a permit must be obtained and inspection made. This applies to unincorporated Alameda County; the incorporated cities issue their own plumbing permits.

Issued by
Alameda County Public Works Agency, Building Inspection Department
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

Plumbing permits are usually pulled by the plumber doing the job. If you are still choosing one, compare a few quotes first.

Compare plumber quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What a plumbing permit costs in Alameda County

Fee schedule in force
Official scheduleRead .
Published in
Building Inspection Department Service Fee Schedule (Schedule A, effective July 1, 2024):
  • where plumbing work is part of a building permit scope, 'Plumbing Permit 17% of Building Permit Fees, $140.00 minimum';
  • where it is independent, 'Plumbing piping, water, drain, waste system, and vent, gas, radiant heating or refrigeration $140.00 for the first system, $70.00 each additional system.'
  • The $20.00 single-permit processing fee is charged on any single permit but the schedule states it 'Does not apply to water-heater replacement permit.'

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Alameda County compares in California

No California jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.

JurisdictionPermit needed?Typical fee
Alameda Countythis pagePermit requiredSee schedule
Contra Costa CountyPermit requiredSee schedule
Fresno CountyPermit requiredSee schedule
Los AngelesPermit requiredItemized per fixture per LADBS Fee Sch.5 (7/2017), for example a toilet at $23 and a water heater at $28; the schedule has the rest
Los Angeles CountyPermit requiredPlumbing Code Fee Schedule (Title 28 of the Los Angeles Code, Ord. No. 2013-0050), effective July 1, 2026: $41.35 for issuing each permit
Orange CountyPermit requiredPlumbing Permit Application Flat Fee: $363 for FY 2024-25, $383 for FY 2025-26, $391 for FY 2026-27; the schedule has the rest
Riverside CountyPermit requiredResidential Plumbing (BPL-RPLU): $274.30 fixed fee; the schedule has the rest

How to apply in Alameda County

General guide, not specific to this office

What a plumbing permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a plumbing permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

Alameda County Public Works Agency, Building Inspection Department

  • 399 Elmhurst Street, Room 141, Hayward, CA 94544-1395
  • Phone: 510-670-5440
  • Email: permitbid@acpwa.org

Permitting activity in Alameda County

In 2025, Alameda County authorized permits for 2,778 new residential housing units (1,117 single-family, 1,661 in multi-family buildings), valued at $829M, up from 1,743 the year before. That works out to about 1.7 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 1,636,630.

What else needs a permit in Alameda County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsHeight of a raised deck above adjacent grade at which the building permit exemption stops, and only where the deck is not over a basement or story below and is not part of an accessible routeSee schedule
Electrical PermitPermit requiredAny sizeSee schedule
Fence PermitIt dependsPermit exemption height limit: 7 feet for fences of light materials, 5 feet 9 inches for fences of concrete, masonry, or similar heavy materialsA fence permit is priced from construction valuation using the Schedule A building permit fee table; the schedule has the rest
HVAC PermitPermit requiredAny sizeSee schedule
Patio PermitIt dependsTotal area of each sunshade structure, including any roofed area, at which the building permit exemption stops; the exemption also requires an average height of not more than 10 feetSee schedule
Pool PermitIt dependsDepth of a prefabricated pool at which the building permit exemption stops; the exemption also requires the pool to hold no more than 5,000 gallons and to be installed entirely above groundA pool permit is priced from construction valuation on the Schedule A table; the schedule has the rest
Roof Replacement PermitIt dependsAggregate roof area repaired on a previously permitted roof, at which the building permit exemption stopsA re-roof permit is priced from construction valuation on the Schedule A building permit fee table; the schedule has the rest
Shed PermitIt dependsFloor area of a one-story detached tool or storage shed accessory to a house, at which the building permit exemption stopsA shed permit is priced from construction valuation using the Schedule A table and the Schedule B square-foot valuation table; the schedule has the rest
Solar PermitPermit requiredAny sizeSee schedule

Frequently asked questions

Do you need a plumbing permit in Alameda County?
Yes, before installing or rearranging water, drain, waste, vent, or gas piping, replacing a water heater, or setting new plumbing fixtures in unincorporated Alameda County. If you are unsure how that applies to your project, call the Alameda County Public Works Agency, Building Inspection Department at 510-670-5440 before you start.
How much does a plumbing permit cost in Alameda County?
The fee wording from the official schedule is in the cost table on this page, as we read it on 15 Aug 2026. For the figure on your own project, call the Alameda County Public Works Agency, Building Inspection Department at 510-670-5440.
Where do you apply for a plumbing permit in Alameda County?
You can apply through the Alameda County permit portal or contact the Alameda County Public Works Agency, Building Inspection Department directly. The links are listed on this page.
Can a homeowner pull a plumbing permit themselves in Alameda County?
Under California law (Business & Professions Code 7044(a)-(b); Business & Professions Code 7031.5): California exempts an owner from contractor licensing under section 7044 when they personally perform all the work on their own property, or any work they do not perform themselves is done by their own employees paid only wages, and none of the improvements are intended or offered for sale. It also exempts an owner who directly contracts with licensed contractors for each trade, as long as no more than four of the single-family residential structures involved are intended or offered for sale in a calendar year; this route does not apply if the owner instead contracts with a general contractor for the construction. A homeowner may also improve their own principal residence without a license, as long as the work is done before any sale, they have actually resided there for the 12 months before completion, and they have not used this exemption on more than two structures more than once in any three-year period. Selling a self-built structure within one year of completion creates a rebuttable presumption that it was built for sale, which defeats the exemption, and selling five or more structures within a year makes that presumption conclusive. Separately, every city or county that requires a permit must also require the applicant to file a signed statement giving their contractor license number or the basis of their claimed exemption; a false or missing statement carries a civil penalty of up to $500. Confirm how Alameda County applies this before you apply.

From the Library

Plumbing Permit in other California localities

Everything above, sourced

How this plumbing permit page for Alameda County was verified. 2 official sources: acpwa.org, acgovt.sharepoint.com; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Alameda County Public Works Agency, Building Inspection Department. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Permit required
Check my project