Permit records

Alameda County permit search

Alameda County permit records are public. The county publishes them through Alameda County Permit Portal, and searching does not require an account.

By Mario Bailey Last checked · 10 official sources

Project types verified
10
in Alameda County
Search verified
8 Sep 2026
we opened it ourselves

How to search

  1. Open the Alameda County permit record search.
  2. Enter an address, or switch the search type to look up permits by case number.
  3. Open a result to see the permit's status, inspection history, and issue date.

If the permit does not turn up

Older permits are often missing from online records, and a permit filed under a contractor's name will not surface in an address search that expects the owner. Alameda County Public Works Agency, Building Inspection Department can check the paper file.

What needs a permit in Alameda County

Every project type we have verified in Alameda County, with the rule, the threshold, and the fee that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsHeight of a raised deck above adjacent grade at which the building permit exemption stops, and only where the deck is not over a basement or story below and is not part of an accessible route...valuation using the Schedule A building permit fee table (for example, '$381.46 for...
Electrical PermitPermit requiredAny size...of a building permit scope, 'Electrical Permit 20% of Building Permit Fees, $140.00...
Fence PermitIt dependsPermit exemption height limit: 7 feet for fences of light materials, 5 feet 9 inches for fences of concrete, masonry, or similar heavy materials...using the Schedule A building permit fee table, which starts at a '$140.00 minimum...
HVAC PermitPermit requiredAny size...of a building permit scope, 'Mechanical Permit 18% of Building Permit Fees, $140.00...
Patio PermitIt dependsTotal area of each sunshade structure, including any roofed area, at which the building permit exemption stops; the exemption also requires an average height of not more than 10 feet...is priced from construction valuation using the Schedule A table with a $140.00...
Plumbing PermitPermit requiredAny size...of a building permit scope, 'Plumbing Permit 17% of Building Permit Fees, $140.00...
Pool PermitIt dependsDepth of a prefabricated pool at which the building permit exemption stops; the exemption also requires the pool to hold no more than 5,000 gallons and to be installed entirely above ground...A table, plus building plan review at '80% of the Building Permit fees, $140.00...
Roof Replacement PermitIt dependsAggregate roof area repaired on a previously permitted roof, at which the building permit exemption stops...valuation on the Schedule A building permit fee table, which begins '$140.00...
Shed PermitIt dependsFloor area of a one-story detached tool or storage shed accessory to a house, at which the building permit exemption stops...and the Schedule B square-foot valuation table, with a stated minimum of '$140.00...
Solar PermitPermit requiredAny size...energy system less than 35 Kva per system (when no plan review is required) $280.00...

Everything we have verified about permits in Alameda County