Building permits in Alameda County, California
Of the 10 common home projects we have verified in Alameda County, 4 need a permit outright and 6 depend on size or scope. Click any project for the full rule, fee, and how to apply.
By Mario Bailey Last checked · 2 official sources
Verified against official sources- Project types verified
- 10
- in Alameda County
Alameda County Public Works Agency, Building Inspection Department
- 399 Elmhurst Street, Room 141, Hayward, CA 94544-1395
- Phone: 510-670-5440
- Email: permitbid@acpwa.org
- Official permit page
- Permit portal
- Official fee schedule
Look up a permit in Alameda County
Alameda County runs an online permit portal. Many local portals let you check application status, search permit records, and view inspection results without calling the office.
What needs a permit in Alameda County
Of the 10 common home projects we have verified in Alameda County, 4 need a permit outright and 6 depend on size or scope. Click any project for the full rule, fee, and how to apply.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | Height of a raised deck above adjacent grade at which the building permit exemption stops, and only where the deck is not over a basement or story below and is not part of an accessible route | No deck line item appears in the Building Inspection Department Service Fee Schedule... |
| Electrical Permit | Permit required | Not specified | Building Inspection Department Service Fee Schedule (Schedule A, effective July 1... |
| Fence Permit | It depends | Permit exemption height limit: 7 feet for fences of light materials, 5 feet 9 inches for fences of concrete, masonry, or similar heavy materials | No fence line item appears in the Building Inspection Department Service Fee Schedule... |
| HVAC Permit | Permit required | Not specified | Building Inspection Department Service Fee Schedule (Schedule A, effective July 1... |
| Patio Permit | It depends | Total area of each sunshade structure, including any roofed area, at which the building permit exemption stops; the exemption also requires an average height of not more than 10 feet | No patio cover line item appears in the Building Inspection Department Service Fee... |
| Plumbing Permit | Permit required | Not specified | Building Inspection Department Service Fee Schedule (Schedule A, effective July 1... |
| Pool Permit | It depends | Depth of a prefabricated pool at which the building permit exemption stops; the exemption also requires the pool to hold no more than 5,000 gallons and to be installed entirely above ground | No swimming pool line item appears in the Building Inspection Department Service Fee... |
| Roof Replacement Permit | It depends | Aggregate roof area repaired on a previously permitted roof, at which the building permit exemption stops | No re-roof line item appears in the Building Inspection Department Service Fee Schedule... |
| Shed Permit | It depends | Floor area of a one-story detached tool or storage shed accessory to a house, at which the building permit exemption stops | No shed line item appears in the Building Inspection Department Service Fee Schedule... |
| Solar Permit | Permit required | Not specified | Building Inspection Department Service Fee Schedule (Schedule A, effective July 1... |
Planning a project in Alameda County?
Hire it out
Before you sign, ask the contractor:
- Who pulls the permit, you or me, and is the permit fee included in the bid?
- Which inspections will this job need, and who meets the inspector on site?
- Is your contractor license active in this locality, and under which business name?
Planning several things at once? Check your whole project