California

Building permits in Fresno County, California

Verified against official sources

Of the 10 common home projects we have verified in Fresno County, 7 need a permit outright and 3 depend on size or scope. Click any project for the full rule, fee, and how to apply.

Project types verified
10in Fresno County

Look up a permit in Fresno County

Fresno County runs an online permit portal. We have not confirmed what its record search covers.

Open the Fresno County permit portal

How to get a building permit in Fresno County

Fresno County’s Building and Safety team, in the Department of Public Works and Planning, issues building permits for property in the county’s jurisdiction. If the Citizens Portal answers your address with “The appropriate agency is FRESNO/CLOVIS/etc.,” the property is in a city and you apply there. For county addresses, apply online through the Citizens Portal.

Where the office is and when it is open

Development Services and Planning is in Annex “A” and “B” of the Fresno County Plaza, 2220 Tulare Street, Fresno. Phone hours are Monday to Thursday, 8:00 am to 5:00 pm, and Friday, 8:00 am to 12:30 pm. The lobby counter is open Monday to Thursday, 9:00 am to 5:00 pm, and Friday, 8:30 am to 12:30 pm. For plan check and permit questions, call (559) 600-4570 or email PlanCheckBuildingCode2@fresnocountyca.gov.

Applying online in Fresno County

  1. Open the Citizens Portal, click the orange “Create an Account” button, and register as a Person. The confirmation email carries a PIN and a link to finish registration.
  2. Log in and click “Apply for New Public Works Permit.” Pick the Application Type, Sub Type and Work Type that fit best; the county says the office will revise as needed.
  3. Search the property by street number and name only (“2220 Tulare,” no “St” or “Ave”) or by APN with no dashes or spaces.
  4. Choose your declaration: contractor license number, or owner-builder.
  5. Upload plans and documents, clicking “Upload Document” each time, or they will not go through. Files are limited to 100MB.
  6. Wait for the emailed invoice: staff generate invoices in the office for everything except solar permits pre-approved through SolarAPP+. Then log back in, select the invoice and click “Pay Selected Fees.”
  7. Owner-builders must show a driver’s license, notarization or other accepted verification when the permit is issued.

What five common projects cost here

Figures are the FY 26-27 column of the Master Schedule of Fees, which rose 3% on 07/01/2026. Building permits use valuation tables: “multiply footage by appropriate valuation,” then apply Section 2501, a $166.28 minimum charge, or $166.28 for the first $4,000.00 plus $18.85 for each additional $1,000.00 to $25,000.

  • Fence: fences not over 7 feet need no permit. The valuation table lists fences over 6’ high at $34.00 per lineal foot, priced under Section 2501, plus plan review at 65% of the building permit fee. Read 18 Nov 2026.
  • Patio: a frame patio is valued at $23.00 per square foot (add $8.00 for screening) and a metal patio cover or carport at $16.00 (add $6.00 for screening); the total valuation sets the fee under Section 2501 ($166.28 minimum), plus plan review at 65% of the building permit fee. Read 18 Nov 2026.
  • Electrical: $42.77 to issue the permit, $1.80 per wiring outlet, $13.51 per circuit on remodel work, $65.84 minimum. Read 16 Nov 2026.
  • Shed: sheds of 120 square feet or less need no permit. One up to 240 sq. ft. floor area (Item No. 18) is applied for as an exemption: the FAQ says $153.44 plus a $21.85 online fee, but $21.85 is the FY 2025-26 figure, now $22.51. The schedule’s $167.14 line for an agreement on exempt structures (Section 15.04.130) may be the current charge, but the county does not say; ask (559) 600-4570. Larger sheds start at the $166.28 minimum, plus plan review at 65% of the building permit fee. Read 18 Nov 2026.
  • Deck: wood decks are valued at $12.00 per square foot, and the total valuation sets the fee under Section 2501; plan review for other structures adds 65% of the building permit fee. Read 16 Nov 2026.

How long review takes

Only intake has a stated pace: applications are processed in the order received, usually within 24 to 48 hours, and the county gives no figure for plan review itself. Check the application in the portal’s Member Area or call (559) 600-4570.

Inspections, in order

Each sign-off goes on the green paper inspection card, which the office hands you at permit issuance or leaves on site at the first inspection; keep it at the job site. Request an inspection with the Building & Safety page’s Request Inspection form or the 24 hour request line, (559) 600-4131, by 2:30 pm the business day before. Outlying areas are not served daily (Coalinga and Huron, for example, are M/W/F). Results for inspections after 06/25/2025 appear in the portal under “DS Inspection,” but only to people listed as an applicant; to be added, email PlanCheckBuildingCode2@fresnocountyca.gov with the application number. At final, all work must be complete except painting, floor covering, and interior doors and finish. An inspection beyond one reinspection costs $156.45.

Why applications get sent back

  • Incomplete or illegible plan sets are not sent forward, and the application is put on hold.
  • The site plan must show all structures, setbacks, driveway, septic or sewer, wells and drainage.
  • A re-roof needs a CF1R form or Certificate of Compliance with the re-roof certification form.
  • The owner-builder form must be read, initialed, signed and returned before the permit is issued.
  • Where the county has no permit records for a building, plan review staff may ask you for the Assessor’s Residential, Farm, & Miscellaneous Building Records, which staff cannot access: request them yourself from the Assessor, (559) 600-3534, Hall of Records, 2281 Tulare Street, Room 201.

What needs no permit in Fresno County

  • Detached one-story tool and storage sheds or playhouses up to 120 square feet.
  • Fences not over 7 feet high.
  • Retaining walls not over 4 feet, unless supporting a surcharge.
  • Sidewalks and driveways not more than 30 inches above grade.
  • Painting, papering, tiling, carpeting, cabinets and counter tops.
  • Prefabricated above-ground pools under 24 inches deep holding no more than 5,000 gallons.

If the work already started

The Master Schedule of Fees charges a fee for work commenced before permit issuance under Title 15 Section 15.04.080(d), with a $160.95 minimum charge in FY 26-27. What California law says about building without a permit.

Checklist before you apply

  1. Confirm your address is county jurisdiction in the portal’s property search.
  2. A Citizens Portal Member Area account, confirmed with the emailed PIN.
  3. A site plan showing structures, setbacks, driveway, septic or sewer, wells and drainage.
  4. Your contractor license number, or the signed owner-builder form plus ID.
  5. For a re-roof, the CF1R form or Certificate of Compliance and the certification form.
  6. Payment after the emailed invoice arrives, through “Pay Selected Fees.”

Fresno County documents read for this guide

What needs a permit in Fresno County

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredAny sizeNo flat deck permit fee is published
Electrical PermitPermit requiredAny sizeSee schedule
Fence PermitIt dependsFences not over 7 feet high are on the county's published list of work exempt from a building permitThe Master Schedule of Fees publishes no flat fence permit fee
HVAC PermitPermit requiredAny sizeSection 2510 Mechanical Code Fees, FY 2026-27: Issuing each permit $42.77
Patio PermitPermit requiredAny sizeNo flat patio permit fee is published
Plumbing PermitPermit requiredAny sizeSee schedule
Pool PermitIt dependsPrefabricated pools accessory to a Group R-3 occupancy are exempt from a building permit only when they are less than 24 inches deep, hold not more than 5,000 gallons, and are installed entirely above groundSee schedule
Roof Replacement PermitPermit requiredAny sizeSingle family residential: $201.47 per structure for FY 2026-27
Shed PermitIt dependsOne-story detached accessory structures used as tool and storage sheds, playhouses and similar uses are exempt from a building permit when the floor area is not greater than 120 square feetIts Building and Safety FAQ says 'The cost for the permit will be $153.44'; the schedule has the rest
Solar PermitPermit requiredAny sizeSee schedule

Planning a project in Fresno County?

Hire it out

Sponsored

Licensed contractors usually pull the permit as part of the job. Comparing a few local quotes before you commit is the useful next step.

Compare local contractor quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

Planning several things at once? Check your whole project

Fresno County permit fees compared with nearby California localities

California locality Deck PermitHVAC PermitElectrical Permit
Fresno County No flat deck permit fee is published Section 2510 Mechanical Code Fees, FY 2026-27: Issuing each permit $42.77 See schedule
Alameda County See schedule See schedule See schedule
Contra Costa County No deck-specific flat fee is published See schedule See schedule
Los Angeles Building permit fee is graduated by declared project valuation per LAMC 91.113 Table 1-A; the schedule has the rest See schedule See schedule

Each cell is taken from that California jurisdiction's own fee schedule; the full wording and source sit on each permit page.

Fresno County permit questions, answered from the data

Do you need a permit in Fresno County?
For most projects, yes. Of the 10 permit types we cover in Fresno County, 7 always require a permit (for example a deck permit) and 3 depend on size or scope (a fence permit, for instance). Each Fresno County permit type's page states the exact rule and its source.
How much does a permit cost in Fresno County?
Fresno County publishes a fee for 10 of the 10 permit types we cover, each quoted on its page from the jurisdiction's own schedule (linked on every page that carries one). Fees are set by Department of Public Works and Planning, Development Services and Capital Projects Division, Building and Safety; we do not estimate or mark them up.
Where do you apply for a permit in Fresno County?
Department of Public Works and Planning, Development Services and Capital Projects Division, Building and Safety issues permits in Fresno County and has an online permit portal, and takes questions at 559-600-4570 (plan check and permit information); 559-600-4560 (building inspection); 559-600-4131 (24 hour inspection request line). The Fresno County official page and portal are linked in the office section above.

How the Fresno County pages were verified. 10 permit types, 4 distinct official sources, most recently checked . Every rule is read from Department of Public Works and Planning, Development Services and Capital Projects Division, Building and Safety or the applicable code and cited on its page; anything we could not confirm for Fresno County is marked rather than estimated. How we verify.

Permitting activity in Fresno County

In 2025, Fresno County authorized permits for 2,271 new residential housing units (2,002 single-family, 269 in multi-family buildings), valued at $734M , down from 2,439 the year before. That works out to about 2.2 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 1,035,456.

From the Library

Other permit offices in California