Building permits in Fresno County, California
Of the 10 common home projects we have verified in Fresno County, 7 need a permit outright and 3 depend on size or scope. Click any project for the full rule, fee, and how to apply.
By Mario Bailey Last checked · 2 official sources
Verified against official sources- Project types verified
- 10
- in Fresno County
Department of Public Works and Planning, Development Services and Capital Projects Division, Building and Safety
- 2220 Tulare Street, Suite A, Fresno, CA 93721 (Development Services and Capital Projects Division; the offices are in Annex A and Annex B of the Fresno County Plaza at Tulare and M streets)
- Phone: 559-600-4570 (plan check and permit information); 559-600-4560 (building inspection); 559-600-4131 (24 hour inspection request line)
- Email: PlanCheckBuildingCode2@fresnocountyca.gov
- Official permit page
- Permit portal
- Official fee schedule
Look up a permit in Fresno County
Fresno County runs an online permit portal. Many local portals let you check application status, search permit records, and view inspection results without calling the office.
What needs a permit in Fresno County
Of the 10 common home projects we have verified in Fresno County, 7 need a permit outright and 3 depend on size or scope. Click any project for the full rule, fee, and how to apply.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | Permit required | Not specified | No flat deck permit fee is published. |
| Electrical Permit | Permit required | Not specified | Section 2511 Electrical Code Fees, FY 2026-27: Issuing permits $42.77 each |
| Fence Permit | It depends | Fences not over 7 feet high are on the county's published list of work exempt from a building permit | The Master Schedule of Fees publishes no flat fence permit fee. |
| HVAC Permit | Permit required | Not specified | Section 2510 Mechanical Code Fees, FY 2026-27: Issuing each permit $42.77 |
| Patio Permit | Permit required | Not specified | No flat patio permit fee is published. |
| Plumbing Permit | Permit required | Not specified | Section 2512 Plumbing Code Fees, FY 2026-27: Alteration, repair or addition of a drain... |
| Pool Permit | It depends | Prefabricated pools accessory to a Group R-3 occupancy are exempt from a building permit only when they are less than 24 inches deep, hold not more than 5,000 gallons, and are installed entirely above ground | Special Services Fees item 21, 'Installation of private swimming pool or spa includes... |
| Roof Replacement Permit | Permit required | Not specified | Special Services Fees item 16, 'Re-roofing of existing buildings including pre-roof... |
| Shed Permit | It depends | One-story detached accessory structures used as tool and storage sheds, playhouses and similar uses are exempt from a building permit when the floor area is not greater than 120 square feet | For a shed between 120 and 240 square feet the county charges for the Item No. |
| Solar Permit | Permit required | Not specified | The Master Schedule of Fees has no solar or photovoltaic line item anywhere in Section... |
Planning a project in Fresno County?
Hire it out
Before you sign, ask the contractor:
- Who pulls the permit, you or me, and is the permit fee included in the bid?
- Which inspections will this job need, and who meets the inspector on site?
- Is your contractor license active in this locality, and under which business name?
Planning several things at once? Check your whole project