California

Building permits in Riverside County, California

Of the 10 common home projects we have verified in Riverside County, 5 need a permit outright and 5 depend on size or scope. Click any project for the full rule, fee, and how to apply.

By Mario Bailey Last checked · 2 official sources

Verified against official sources
Project types verified
10
in Riverside County

Riverside County Building and Safety Department (Transportation and Land Management Agency)

Look up a permit in Riverside County

Riverside County runs an online permit portal. Many local portals let you check application status, search permit records, and view inspection results without calling the office.

Search the Riverside County permit portal

What needs a permit in Riverside County

Of the 10 common home projects we have verified in Riverside County, 5 need a permit outright and 5 depend on size or scope. Click any project for the full rule, fee, and how to apply.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsA deck is exempt only if it is 200 square feet or less in area, no more than 30 inches above grade at any point, not attached to a dwelling or townhouse, and does not serve the required exit doorDeck County Standard (BPT-DEKCS): $586.60 fixed fee
Electrical PermitPermit requiredNot specifiedResidential Electrical (BEL-RELE): $448.20 fixed fee
Fence PermitIt dependsFences 7 feet or less in height are exempt from a building permit, except block walls, which are exempt only up to 4 feet in heightFences Over 7' (BXX-FENC): $635.40 fixed fee, per Appendix A to Ordinance No.
HVAC PermitPermit requiredNot specifiedResidential Mechanical (BME-RMEC): $274.30 fixed fee, per Appendix A to Ordinance No.
Patio PermitPermit requiredNot specifiedLattice Patio Cover County Standard (BPT-LPAT): $411.90 fixed fee
Plumbing PermitPermit requiredNot specifiedResidential Plumbing (BPL-RPLU): $274.30 fixed fee, per Appendix A to Ordinance No.
Pool PermitIt dependsA prefabricated swimming pool less than 24 inches deep is exempt from a building permit; the department's handout adds that it must be above ground, hold no more than 5,000 gallons, and be at a single-family propertyResidential Pool/Spa (BSP-RES): $999.30 fixed fee
Roof Replacement PermitIt dependsRoof repairs or replacements covering less than 25 percent of the legally existing roof area are exempt, provided the work does not involve the underlying framing and does not occur more than once in a 12-month periodRoofing and/or Deck Replacement (BRR-RROO): $335.50 fixed fee, per Appendix A to...
Shed PermitIt dependsA one-story detached accessory structure with a floor area of 120 square feet or less is exempt from a building permit, other than a storm shelterAccessory Building 1,000 SQ FT (BAS-ACB1): $1,628.78 deposit
Solar PermitPermit requiredNot specifiedRoof Mount Solar Residential (BEL-RSLRR), described in the schedule as 'Mandated by AB...

Planning a project in Riverside County?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?

Planning several things at once? Check your whole project

From the Library

Other permit offices in California