Across the 15 California jurisdictions we have verified, none of the 152 project rules is a flat "no permit", 68 turn on a size or scope condition the jurisdiction publishes, and 84 require a permit regardless. Fence work is where the answer most often comes with a published condition rather than a flat yes: 15 of the 15 jurisdictions that answer publish one. The numbers are not statewide: fence thresholds alone run from 6 to 10 feet depending on the jurisdiction.
Jurisdictions read
15
Rules with an answer
152
No permit needed
0
Depends on size or scope
68
Permit always required
84
How to read this page
"No permit" means the jurisdiction publishes that the work needs no building permit. "Depends" means
it publishes a size, height, depth, cost or scope condition that decides the answer, quoted in its own
words in the last column; the number beside it is the figure that condition turns on, and which side of
the number is exempt is stated by the condition, not by us. Exempt from a building permit is not exempt
from zoning, setbacks, height limits, flood rules, an HOA, or a separate electrical, plumbing or
mechanical permit, and several of the conditions below say exactly that.
All 15 make the fence answer turn on a size or scope condition the jurisdiction publishes, and the 15 that state a number publish figures from 6 to 10 feet.
a building permit is required for masonry or concrete fences over 3 ½ feet high, other fences over 10 feet high, and all swimming pool barriers; a fence wall only partially built of masonry or concrete needs no permit when no portion exceeds 6 feet and it follows the LADBS bulletin.
height of a fence or freestanding block wall measured from the lowest adjacent grade; a masonry or concrete fence must also be set back from a public way at least a distance equal to its height to stay exempt.
Fences and freestanding walls over six feet in height require a building permit; fences not over six feet are exempt unless a permit was required as a condition of project approval.
fence height, measured from the grade on the right-of-way side when the fence sits within 5 feet of the public right-of-way and otherwise from the highest grade on either side.
Fences and freestanding masonry walls over 6 feet in height need a building permit; open fences up to 8 feet are also exempt if the uppermost two feet is only barbed or razor wire on angled supports.
One-story detached accessory structures used as tool and storage sheds, playhouses and similar uses are exempt from a building permit when the floor area is not greater than 120 square feet.
one-story detached tool or storage shed with floor area not greater than 120 square feet, not located in Fire District No. 1, with no heating, plumbing or electrical installation, and located where the zoning code allows, is outside the building code and needs no building permit.
gross floor area of a one-story detached accessory building; the exemption also requires the height not to exceed 12 feet and the maximum roof projection not to exceed 24 inches.
One-story detached accessory buildings used as tool and storage sheds, play houses and similar uses are exempt from a building permit only when the floor area does not exceed 120 square feet and the structure sits at least 3 feet from the property line and 6 feet from other buildings on the same property.
one-story detached accessory buildings supported on the ground and used as tool and storage sheds are exempt when the projected roof area is 120 square feet or less.
accessory buildings or structures of 120 sq. ft. or less need no permit unless they include electricity or plumbing; larger ones need a building permit.
12 of 15 make the deck answer turn on a size or scope condition the jurisdiction publishes, and the 7 that state a number publish figures from 120 to 200 sq ft. Fresno County, Los Angeles and Orange County require a permit for deck work regardless of size.
Height of a raised deck above adjacent grade at which the building permit exemption stops, and only where the deck is not over a basement or story below and is not part of an accessible route.
area of a deck that is also no more than 30 inches above grade at any point, is not attached to a dwelling, and does not serve a code-required exit door.
height of the deck surface above grade; the exemption also requires the deck not to be over any basement or story below and not to be part of an accessible route.
A deck is exempt only if it is 200 square feet or less in area, no more than 30 inches above grade at any point, not attached to a dwelling or townhouse, and does not serve the required exit door.
a deck is exempt only if it does not exceed 200 square feet, is not more than 30 inches above grade at any point, is not attached to a dwelling and does not serve the required exit door; any other deck needs a building permit.
deck area, where the deck is also no more than 30 inches above grade at any point, is not attached to a dwelling, and does not serve a required exit door.
A deck needs a building permit when it is more than 30 inches above adjacent grade, or sits over a basement or story below, or forms part of an accessible route.
Fresno County's published answer to 'When is a building permit required?' states the general rule that permits are required for construction of any building or structure and then lists the exemptions, and no deck exemption appears anywhere on that list or in the county's own Title 15 additions to it.
the code exempts platforms not more than 30 inches above grade and not over any basement or story below; confirm with LADBS whether a low deck qualifies.
OC Development Services lists decks under the residential improvements that typically require a building permit, and the county's fee schedule prices decks together with patio covers, balconies and enclosures rather than as a separate permit type.
11 of 15 make the pool answer turn on a size or scope condition the jurisdiction publishes, and the 9 that state a number publish figures from 18 to 24 inches. 4 require a permit for pool work regardless of size.
Depth of a prefabricated pool at which the building permit exemption stops; the exemption also requires the pool to hold no more than 5,000 gallons and to be installed entirely above ground.
Prefabricated pools accessory to a Group R-3 occupancy are exempt from a building permit only when they are less than 24 inches deep, hold not more than 5,000 gallons, and are installed entirely above ground.
depth of a prefabricated pool or other body of water accessory to a one- or two-family (Group R-3) home; the same exemption also reaches pools that do not exceed 5,000 gallons and are installed entirely above adjacent grade.
A prefabricated swimming pool less than 24 inches deep is exempt from a building permit; the department's handout adds that it must be above ground, hold no more than 5,000 gallons, and be at a single-family property.
prefabricated swimming pools accessory to a Group R, Division 3 occupancy are exempt when supported directly upon grade, with pool walls entirely above the adjacent grade, and capacity not over 5,000 gallons.
The only exempt pool is a prefabricated pool accessory to a one- or two-family dwelling that is less than 18 inches deep, holds no more than 5,000 gallons, and sits entirely above ground; everything else needs a permit.
Orange County requires a building permit for pool and spa construction and runs a dedicated pool and spa plan check track: the applicant submits a Building Permit Application and a Pool/Spa Questionnaire through myOCeServices along with a site plan showing proposed pool safety fencing, cross sections, structural details and, in some cases, a soil report.
A Pool and Spa permit is required before construction of a pool or spa in unincorporated San Bernardino County, with no size or depth threshold published for the permit itself.
any pool or structure with water over 18 inches deep needs a building permit; the city exemption list covers prefabricated above-ground pools less than 24 inches deep that hold a maximum of 5,000 gallons at a single-family property.
9 of 14 make the patio answer turn on a size or scope condition the jurisdiction publishes, and the 6 that state a number publish figures from 120 to 300 sq ft. 5 require a permit for patio work regardless of size. 1 publishes no answer we could verify.
Total area of each sunshade structure, including any roofed area, at which the building permit exemption stops; the exemption also requires an average height of not more than 10 feet.
Los Angeles County requires a building permit to construct patio covers and carport structures, and separately states that a building permit is required to enlarge or alter any dwelling including an attached patio.
Decks and patio covers are listed as needing a building permit. Sidewalks and driveways are listed as exempt, as are decks not exceeding 200 square feet that are not more than 30 inches above grade at any point, are not attached to a dwelling and do not serve the required exit door. The exemptions do not apply within a design review or preservation district or to a historic landmark.
floor area of a detached, not fully enclosed patio cover, pergola, arbor or trellis that is also no taller than 12 feet and stands 5 feet or more from the property line.
patio cover structures attached to or detached from single dwelling units in the RS and RX zones are exempt when the projected roof area is 300 square feet or less, the structure does not encroach into any yard, and it is 12 feet or less above grade; not in the appealable area of the Coastal Overlay Zone or in Planned Developments.
a detached accessory structure of 120 sq. ft. or less with no electricity or plumbing needs no permit; larger structures and additions to the house need a building permit.
Santa Clara County's adopted work-exempt-from-permit list under California Residential Code Section R105.2 has eleven items and none of them covers a patio cover, patio enclosure, trellis or carport; the closest entry exempts only a window awning supported by an exterior wall that projects not more than 54 inches and needs no additional support.
Fresno County treats a residential patio cover as permitted construction: no patio exemption appears on the county's published list of work exempt from a building permit, the county publishes a dedicated F421 Patio Guideline Sheet labeled 'For Residential Patios Only' showing required rafter spans, beam overhangs, clearances and site plan contents, and the fee schedule carries separate construction valuation lines for frame patios and metal patio covers.
OC Development Services names patios among the residential improvements that typically require a building permit, and the county publishes standard drawings (Typical Lattice Patio Cover and Typical Roofed Patio Cover, both revised 4/2025) that an applicant can fill in and submit in place of custom plans.
Patio covers are not on Riverside County's list of work exempt from permits, and the county's FAQ names 'Decks and patio covers' among its examples of when a permit is required.
The county's published list of items requiring a permit names "Patio Covers (Solid and Lattice)" and "Enclosed Patios" as separate line items with no size threshold attached, so both need a building permit regardless of area.
5 of 15 make the roof replacement answer turn on a size or scope condition the jurisdiction publishes, and the 3 that state a number all publish 25 percent. 10 require a permit for roof replacement work regardless of size.
Roof repairs or replacements covering less than 25 percent of the legally existing roof area are exempt, provided the work does not involve the underlying framing and does not occur more than once in a 12-month period.
renewal of roof covering without structural changes is generally exempt; permit required if structural work is needed or roof weight increases above 6 lbs per sq ft.
a building permit is required when 25 percent or more of the roof is reroofed in any 12-month period; less than 25 percent is a repair and needs no permit.
Contra Costa County requires a permit for every re-roof installation and every roof repair, obtained before work begins, with no published small-job exemption.
A re-roof is a permitted alteration in unincorporated Fresno County and the fee schedule prices it as a flat per-structure Special Services fee that includes the pre-roof inspection.
Orange County's residential permit handout states plainly that building permits are required for re-roofing, and the county's fee schedule carries a flat Reroof line item plus a discounted rate for each detached garage or structure re-roofed with the main permit.
San Bernardino County requires a ReRoof permit before any re-roofing activity, and "Re-roofing" appears on the county's published list of items requiring a permit with no size or square-footage threshold.
Santa Clara County's adopted work-exempt-from-permit list under California Residential Code Section R105.2 contains eleven items covering sheds, fences, retaining walls, water tanks, sidewalks and driveways, finish work, shallow prefabricated pools, playground equipment, window awnings, small detached decks and hoop structures.
San Francisco requires an electrical permit to install, alter or modify any part of a property's electrical system for EV supply equipment, but no permit to install a residential plug-in charger into a previously approved receptacle outlet.
If the work is already built
California makes it a criminal misdemeanor to violate the State Housing Law or the State Building Standards Code provisions adopted under it, which covers construction, alteration, or maintenance of a building without required permits. The state ceiling is a fine up to $1,000, up to six months in jail, or both.
1 of the 153 rules we hold for California are unresolved because the jurisdiction publishes
no answer; they are counted nowhere above.
The 152 answered rules come from 98 official sources, each linked from the permit page
behind every jurisdiction name. See the full picture for the state on the
California permit requirements page.
This page compiles what each California jurisdiction publishes, with a last checked date. It is not legal
advice, and a project that is exempt from a building permit can still need zoning approval or a trade
permit. Confirm with the office linked from the jurisdiction's page before you build.