California / San Jose

Shed Permit in San Jose, California

It depends

We could not confirm this

Before building a shed at or above 120 sq ft or adding utilities to any shed

Based on building code Verified

Issued byCity of San Jose Building Division (Planning Building and Code Enforcement)

By Mario Bailey, verified against official sources

Quick answer

Detached accessory structures under 120 square feet without electrical or plumbing are exempt from a building permit in San Jose. Sheds of 120 square feet or larger require a permit. Any shed with electrical or plumbing work also requires the appropriate trade permit regardless of size.

Typical threshold: shed under 120 sq ft without electrical or plumbing does not require a permit.

Diagram of the 120 sq ft footprint area threshold for a shed permit in San Jose, California
Threshold illustrated: 120 sq ft. Whether San Jose requires a permit above or below this measurement is stated in the verdict on this page, verified 2026-06-17.

Who is pulling this permit?

Hire it out

Sponsored

If a contractor builds or places your shed, they usually handle any required permit. Compare a few bids before you commit.

Compare contractor quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

When a permit is usually needed

Before building a shed at or above 120 sq ft or adding utilities to any shed

Shed size, height and setback rules in San Jose

By Mario Bailey Last checked · 2 official sources

Size limit
In the residential districts, all accessory buildings and accessory structures on a property may total at most 650 square feet (cumulative), and only a special use permit allows more; space entirely below grade does not count. library.municode.com: code of ordinances
Height limit
In the residential districts, an accessory building may be up to 12 feet high and one story; in the R-1, R-2 and R-M districts one with a sloped roof may go higher if the height halfway up the roof slope is no more than twelve feet and no part exceeds sixteen feet. library.municode.com: code of ordinances
Setback
In the residential districts, an accessory building has no minimum side or rear setback, except that on a corner lot it must stay at least ten feet from the side property line next to a street, and on a corner lot that abuts a residential key lot it must be at least four feet from the rear lot line; fire and life safety rules may require more. library.municode.com: code of ordinances
Setback
In the residential districts, an accessory building must be at least 60 feet from the front property line; a detached garage no longer than twenty feet that keeps a five-foot side setback may be 45 feet back, and a detached garage on a lot with two intersecting front property lines 25 feet back. library.municode.com: code of ordinances
Also required
An accessory building must be at least six feet from the walls of any other building on the property, including other accessory buildings; eaves may be closer if they meet the building code. library.municode.com: code of ordinances
Also required
Accessory buildings and structures (not counting built-in swimming pools) may cover at most 40% of the rear yard, and accessory buildings alone at most 30%; eaves projecting up to two feet are not counted. library.municode.com: code of ordinances
Also required
An accessory building may not contain living space or sleeping quarters, is limited to two plumbing connections serving an appliance or fixture, and must be unconditioned space. library.municode.com: code of ordinances

What a shed permit costs in San Jose

Line item
shed permitBy formulaBase permit issuance $227 plus base plan review $325 plus base inspection $367 for a shed needing a permit; sheds 120 sq ft or less without wiring need no permit, per the FY2025-26 Building Division Fee Schedule.
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How San Jose compares in California

JurisdictionPermit needed?Threshold
Alameda CountyIt dependsFloor area of a one-story detached tool or storage shed accessory to a house, at which the building permit exemption stops
Contra Costa CountyIt dependsfloor area of a one-story detached accessory structure
Fresno CountyIt dependsOne-story detached accessory structures used as tool and storage sheds, playhouses and similar uses are exempt from a building permit when the floor area is not greater than 120 square feet
Los AngelesIt dependsone-story shed under 120 sq ft and under 12 ft in height with no electrical or plumbing does not require a permit
Los Angeles CountyIt dependsgross floor area of a one-story detached accessory building; the exemption also requires the height not to exceed 12 feet and the maximum roof projection not to exceed 24 inches
Orange CountyIt dependsOne-story detached accessory buildings used as tool and storage sheds, play houses and similar uses are exempt from a building permit only when the floor area does not exceed 120 square feet and the structure sits at least 3 feet from the property line and 6 feet from other buildings on the same property
San Josethis pageIt dependsshed under 120 sq ft without electrical or plumbing does not require a permit

Closest shed permit thresholds outside California

Jurisdictions we cover whose limit sits nearest San Jose's 120 sq ft.

How to apply in San Jose

In San Jose, a residential shed permit application, once the shed is large enough to require one, is a set of construction documents that show what will be built and prove it meets the adopted residential code. In practice that means a written permit application, a scaled site plan locating the shed and its distances to the property lines, and construction documents covering the shed's foundation or anchoring system and its framing.

What most shed permit applications include:

  • For San Jose, a written permit application identifying the proposed work and describing the property by its address or legal description, filed with the building department before construction begins (IRC R105.3).
  • For San Jose, a scaled site plan showing the shed's size and location and its dimensioned distances to all property lines so required setbacks can be verified before the permit is issued (IRC R106.2).
  • Construction documents showing the shed's foundation: freestanding accessory structures at or under the code's small-structure size and eave-height limits (600 square feet and a 10 foot eave height in the model code) are exempt from continuous footings but must still be shown supported on undisturbed soil or engineered fill and anchored to resist wind-induced uplift and overturning (IRC R403.1).
  • Where the shed does sit on a continuous foundation with a wood sill plate, anchor bolt or approved strap details tying the sill plate to the foundation (IRC R403.1.6).
  • Roof framing details showing the rafter-to-wall or truss-to-wall connections, since even a shed exempt from continuous footings must be anchored to resist wind-induced uplift and overturning (IRC R403.1; R802.11).

General submittal guidance from IRC R105.3 (permit application), R106.2 (site plan), R403.1 (footings and anchorage for accessory structures), and R403.1.6 (sill anchorage), 2021 IRC. Source. City of San Jose Building Division (Planning Building and Code Enforcement) sets the exact checklist for San Jose.

Where to apply in San Jose:

City of San Jose Building Division (Planning Building and Code Enforcement)

Shed Permit in San Jose compared with nearby California localities

LocalityPermit needed?ThresholdWhat each California schedule saysVerified
San JoseIt dependsshed under 120 sq ft without electrical or plumbing does not require a permitBase permit issuance $227 plus base plan review $325 plus base inspection $367 for a...
Alameda CountyIt dependsFloor area of a one-story detached tool or storage shed accessory to a house, at which the building permit exemption stops...and the Schedule B square-foot valuation table, with a stated minimum of '$140.00...
Contra Costa CountyIt dependsfloor area of a one-story detached accessory structureNo shed-specific flat fee is published
Fresno CountyIt dependsOne-story detached accessory structures used as tool and storage sheds, playhouses and similar uses are exempt from a building permit when the floor area is not greater than 120 square feet...application, not a building permit: 'The cost for the permit will be $153.44 (a...
Los AngelesIt dependsone-story shed under 120 sq ft and under 12 ft in height with no electrical or plumbing does not require a permitNo shed-specific valuation multiplier printed

Inspections and closing out your permit

In San Jose, a permitted shed is inspected in stages as it goes up: the foundation or the anchors that hold it down before they are covered, the framing before it is enclosed, and a final inspection once the shed is finished. Each stage checks the items that would be hidden or unsafe if skipped.

  1. Foundation or anchor inspection in San Jose: called after any required footings, piers, or ground anchors are set and any forms or reinforcing steel are in place, but before concrete is placed, so the foundation or anchoring system can be verified before it is covered (IRC R109.1.1).
  2. Frame inspection in San Jose: after the shed is framed, sheathed, and braced, the inspector checks the framing, bracing, fasteners, and the roof connections that resist wind uplift, before those elements are covered (IRC R109.1.4 frame inspection; R403.1 anchorage).
  3. Final inspection in San Jose: made after the permitted work is complete and before the shed is used; work may not proceed past any inspection stage without the building official's approval (IRC R109.1.6 final inspection; R109.4 approval required).
  4. In San Jose: for a pre-fabricated or kit shed, the manufacturer's installation instructions must be on site at the time of inspection so the inspector can confirm the anchoring and assembly match the design (IRC R106.1.2).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the San Jose permit portal or by phone at 408-535-3555.

Inspection sequence from IRC R109.1.1 (foundation inspection), R109.1.4 (frame inspection), R109.1.6 (final inspection), and R106.1.2 (manufacturer's instructions on site), 2021 IRC. Source. An open permit left un-inspected can surface later in a title search or home sale.

Permitting activity in San Jose

In 2025, San Jose authorized permits for 3,313 new residential housing units (613 single-family, 2,700 in multi-family buildings), valued at $381M, up from 1,998 the year before. That works out to about 3.3 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 1,013,616.

About San Jose

San Jose has about 343,058 housing units. The median home is valued at $1,187,800, against a median household income of $141,565. About 56% of homes are owner-occupied, and the typical home was built around 1975.

Source: U.S. Census Bureau, American Community Survey 2023 5-year.

Frequently asked questions

Do you need a shed permit in San Jose?
Detached accessory structures under 120 square feet without electrical or plumbing are exempt from a building permit in San Jose. Sheds of 120 square feet or larger require a permit. Any shed with electrical or plumbing work also requires the appropriate trade permit regardless of size. Shed under 120 sq ft without electrical or plumbing does not require a permit. Always confirm with the office before starting.
How much does a shed permit cost in San Jose?
Base permit issuance $227 plus base plan review $325 plus base inspection $367 for a shed needing a permit; sheds 120 sq ft or less without wiring need no permit, per the FY2025-26 Building Division Fee Schedule. See the official fee schedule for current amounts.
Where do you apply for a shed permit in San Jose?
You can apply through the San Jose permit portal or contact the City of San Jose Building Division (Planning Building and Code Enforcement) directly. The links are listed on this page.
Can a homeowner pull a shed permit themselves in San Jose?
Under California law (Business & Professions Code 7044(a)-(b); Business & Professions Code 7031.5): California exempts an owner from contractor licensing under section 7044 when they personally perform all the work on their own property, or any work they do not perform themselves is done by their own employees paid only wages, and none of the improvements are intended or offered for sale. It also exempts an owner who directly contracts with licensed contractors for each trade, as long as no more than four of the single-family residential structures involved are intended or offered for sale in a calendar year; this route does not apply if the owner instead contracts with a general contractor for the construction. A homeowner may also improve their own principal residence without a license, as long as the work is done before any sale, they have actually resided there for the 12 months before completion, and they have not used this exemption on more than two structures more than once in any three-year period. Selling a self-built structure within one year of completion creates a rebuttable presumption that it was built for sale, which defeats the exemption, and selling five or more structures within a year makes that presumption conclusive. Separately, every city or county that requires a permit must also require the applicant to file a signed statement giving their contractor license number or the basis of their claimed exemption; a false or missing statement carries a civil penalty of up to $500. Confirm how San Jose applies this before you apply.

From the Library

What else needs a permit in San Jose

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsdeck over 200 sq ft or over 30 inches above grade or attached to dwelling or serving required exit requires a permitBase permit issuance $227 plus base plan review $325 plus base inspection $367, rising...
Electrical PermitPermit requiredAny sizeGreater of $315 per hour of required inspection time or an itemized fixture-based...
Fence PermitIt dependsfence over 7 feet in rear or side yard or over 3 feet in front yard requires a permitNot published
HVAC PermitPermit requiredAny sizeBilled as a Mechanical Permit: greater of $315 per hour of actual inspection time or an...
Patio PermitPermit requiredAny size...residential exterior/site-alterations bucket charges base permit issuance $227...
Plumbing PermitPermit requiredAny sizeGreater of $315 per hour of actual inspection time or an itemized fixture-based...
Pool PermitPermit requiredAny sizeBase permit issuance $227 plus base plan review $325 plus base inspection $367, rising...
Roof Replacement PermitPermit requiredAny sizeResidential re-roof: permit issuance $113, inspections $236 for up to 2 visits plus $157...
Solar PermitPermit requiredAny sizeBilled as an Electrical Permit: greater of $315 per hour of required inspection time or...

Shed Permit in other California localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not San Jose documents; the office above sets the local rules.

How this shed permit page for San Jose was verified. 2 official sources: sanjoseca.gov, sanjoseca.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of San Jose Building Division (Planning Building and Code Enforcement). Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Compare Shed Permit requirements across California localities

Shed permit rules nationwide

Look up an existing San Jose permit record

It depends
Get quotes