Quick answer

Aurora requires a building permit for a detached storage shed only once it exceeds 120 square feet of floor area. Below that size the city asks for no building permit, but the shed still has to comply with Aurora's zoning regulations on placement, so setbacks and easements still bind. A shed over the threshold takes a plan submittal including a plot plan and a framing/structural inspection.

Typical threshold: shed floor area at which a building permit is required.

Diagram of the 120 sq ft footprint area threshold for a shed permit in Aurora, Colorado
Threshold illustrated: 120 sq ft. Whether Aurora requires a permit above or below this measurement is stated in the verdict on this page, verified 2026-08-16.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?

When a permit is usually needed

Before building a detached shed larger than 120 square feet of floor area. Smaller sheds need no building permit but still have to meet the city's zoning rules on where they may sit.

What a shed permit costs in Aurora

Line item
shed permitBy formulaThere is no storage-shed line item on the 2026 flat-rate schedule (Form #A175, footer "Flat-Rate Fee (Revised 08/2026)"), so a shed over 120 square feet is priced by the Permit Center rather than from a published flat fee. Aurora links a permit fee calculator from its Building Fees page.
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Aurora compares in Colorado

Across the Colorado jurisdictions we have verified, the same threshold runs from 120 to 200, so a project that is exempt here may still need a permit one county over.

JurisdictionPermit needed?Threshold
Aurorathis pageIt dependsshed floor area at which a building permit is required
DenverIt dependssheds up to 200 sq ft with 8 ft top plate and 14 ft max height do not require a building permit but may require a zoning permit in some zone districts
Jefferson CountyPermit requiredSheds, mini-structures, and shipping containers 120 sq ft or less that sit at least 10 feet from any occupied structure and are no more than 14 feet tall need only a Miscellaneous Permit; anything larger, taller, or closer than 10 feet to an occupied structure needs a full Building Permit instead. Some permit is required at every size.

Closest shed permit thresholds outside Colorado

Jurisdictions we cover whose limit sits nearest Aurora's 120 sq ft.

  • Alameda County, California, Floor area of a one-story detached tool or storage shed accessory to a house, at which the building permit exemption stops
  • Baltimore County, Maryland, accessory structure floor area
  • Boston, Massachusetts, one-story detached accessory sheds used for tools or storage are exempt if floor area does not exceed 120 sq ft
  • Chandler, Arizona, One-story detached accessory structures (storage sheds, open-air ramadas) with floor area of 120 sq ft or less and height of 7 ft or less (up to 9 ft with 2 additional feet of setback per additional foot of height) are exempt if not connected to any electrical, gas, or water utility; exceeding either limit or connecting a utility requires a building permit.

How to apply in Aurora

A residential shed permit application, once the shed is large enough to require one, is a set of construction documents that show what will be built and prove it meets the adopted residential code. In practice that means a written permit application, a scaled site plan locating the shed and its distances to the property lines, and construction documents covering the shed's foundation or anchoring system and its framing.

What most shed permit applications include:

  • A written permit application identifying the proposed work and describing the property by its address or legal description, filed with the building department before construction begins (IRC R105.3).
  • A scaled site plan showing the shed's size and location and its dimensioned distances to all property lines so required setbacks can be verified before the permit is issued (IRC R106.2).
  • Construction documents showing the shed's foundation: freestanding accessory structures at or under the code's small-structure size and eave-height limits (600 square feet and a 10 foot eave height in the model code) are exempt from continuous footings but must still be shown supported on undisturbed soil or engineered fill and anchored to resist wind-induced uplift and overturning (IRC R403.1).
  • Where the shed does sit on a continuous foundation with a wood sill plate, anchor bolt or approved strap details tying the sill plate to the foundation (IRC R403.1.6).
  • Roof framing details showing the rafter-to-wall or truss-to-wall connections, since even a shed exempt from continuous footings must be anchored to resist wind-induced uplift and overturning (IRC R403.1; R802.11).

General submittal guidance from IRC R105.3 (permit application), R106.2 (site plan), R403.1 (footings and anchorage for accessory structures), and R403.1.6 (sill anchorage), 2021 IRC. Source. City of Aurora Building Division, Development Services Department (Building Permit Center) sets the exact checklist for Aurora.

Where to apply in Aurora:

City of Aurora Building Division, Development Services Department (Building Permit Center)

Inspections and closing out your permit

A permitted shed is inspected in stages as it goes up: the foundation or the anchors that hold it down before they are covered, the framing before it is enclosed, and a final inspection once the shed is finished. Each stage checks the items that would be hidden or unsafe if skipped.

  1. Foundation or anchor inspection: called after any required footings, piers, or ground anchors are set and any forms or reinforcing steel are in place, but before concrete is placed, so the foundation or anchoring system can be verified before it is covered (IRC R109.1.1).
  2. Frame inspection: after the shed is framed, sheathed, and braced, the inspector checks the framing, bracing, fasteners, and the roof connections that resist wind uplift, before those elements are covered (IRC R109.1.4 frame inspection; R403.1 anchorage).
  3. Final inspection: made after the permitted work is complete and before the shed is used; work may not proceed past any inspection stage without the building official's approval (IRC R109.1.6 final inspection; R109.4 approval required).
  4. For a pre-fabricated or kit shed, the manufacturer's installation instructions must be on site at the time of inspection so the inspector can confirm the anchoring and assembly match the design (IRC R106.1.2).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Aurora permit portal or by phone at 303-739-7420.

Inspection sequence from IRC R109.1.1 (foundation inspection), R109.1.4 (frame inspection), R109.1.6 (final inspection), and R106.1.2 (manufacturer's instructions on site), 2021 IRC. Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need a shed permit in Aurora?
Aurora requires a building permit for a detached storage shed only once it exceeds 120 square feet of floor area. Below that size the city asks for no building permit, but the shed still has to comply with Aurora's zoning regulations on placement, so setbacks and easements still bind. A shed over the threshold takes a plan submittal including a plot plan and a framing/structural inspection. Shed floor area at which a building permit is required. Always confirm with the office before starting.
How much does a shed permit cost in Aurora?
There is no storage-shed line item on the 2026 flat-rate schedule (Form #A175, footer "Flat-Rate Fee (Revised 08/2026)"), so a shed over 120 square feet is priced by the Permit Center rather than from a published flat fee. Aurora links a permit fee calculator from its Building Fees page. See the official fee schedule for current amounts.
Where do you apply for a shed permit in Aurora?
You can apply through the Aurora permit portal or contact the City of Aurora Building Division, Development Services Department (Building Permit Center) directly. The links are listed on this page.
Can a homeowner pull a shed permit themselves in Aurora?
Under Colorado law (C.R.S. 12-115-116(2); C.R.S. 12-115-120(11)(c); C.R.S. 12-155-118(2); C.R.S. 12-155-120(11)(c)): Colorado's state electrical law has a homeowner exception: under C.R.S. 12-115-116(2), you do not need an electrician's license to do electrical work on your own property or residence, as long as all the work, other than maintenance or repair of existing systems, is inspected under the state law. The exception does not apply if the property is intended for sale or resale by someone in the construction or remodeling business, is rental property, or is generally open to the public. A homeowner performing work on the homeowner's home is a qualified applicant who may pull the state electrical permit under C.R.S. 12-115-120(11)(c), and plumbing mirrors this: C.R.S. 12-155-118(2) allows unlicensed plumbing work on your own property or residence with the same carve-outs, and C.R.S. 12-155-120(11)(c) lets a homeowner pull the state plumbing permit. The State Electrical and Plumbing Boards at DORA require that the homeowner personally perform the work, that it be inspected before cover and again at completion, and that it meet the National Electrical Code or the adopted plumbing codes. Colorado has no statewide general contractor license: Title 12 licenses electricians and plumbers at the state level, and general building contractors are licensed, if at all, by the individual city or county. Confirm how Aurora applies this before you apply.

From the Library

What else needs a permit in Aurora

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsdeck height above grade at which a permit is required regardless of whether the deck is attached to the houseOn the 2026 flat-rate schedule (Form #A175, footer "Flat-Rate Fee (Revised 08/2026)")...
Electrical PermitIt dependsNot specifiedOn the 2026 flat-rate schedule (Form #A175, footer "Flat-Rate Fee (Revised 08/2026)")...
Fence PermitIt dependsfence height at which a building permit is requiredThere is no fence line item on the 2026 flat-rate schedule (Form #A175, footer...
HVAC PermitIt dependsNot specifiedOn the 2026 flat-rate schedule (Form #A175, footer "Flat-Rate Fee (Revised 08/2026)")...
Patio PermitIt dependsheight above grade of an uncovered concrete patio at which a permit is requiredOn the 2026 flat-rate schedule (Form #A175, footer "Flat-Rate Fee (Revised 08/2026)")...
Plumbing PermitIt dependsNot specifiedOn the 2026 flat-rate schedule (Form #A175, footer "Flat-Rate Fee (Revised 08/2026)")...
Pool PermitIt dependspool depth at which a building permit is requiredThere is no swimming pool or spa line item on the 2026 flat-rate schedule (Form #A175...
Roof Replacement PermitPermit requiredNot specifiedOn the 2026 flat-rate schedule (Form #A175, footer "Flat-Rate Fee (Revised 08/2026)")...
Solar PermitPermit requiredNot specifiedOn the 2026 flat-rate schedule (Form #A175, footer "Flat-Rate Fee (Revised 08/2026)")...

Shed Permit in other Colorado localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not Aurora documents; the office above sets the local rules.

Verified by a person against the sources above on , not confirmed with City of Aurora Building Division, Development Services Department (Building Permit Center). Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Compare Shed Permit requirements across Colorado localities

It depends
Get quotes