Permit records

Aurora permit search

Aurora permit records are public. The county publishes them through Aurora4Biz, and searching does not require an account.

Project types verified
10
in Aurora
Search verified
8 Sep 2026
we opened it ourselves

How to search

  1. Open the Aurora permit record search.
  2. Enter an address.
  3. Open a result to see the permit's status, inspection history, and issue date.

If the permit does not turn up

Older permits are often missing from online records, and a permit filed under a contractor's name will not surface in an address search that expects the owner. City of Aurora Building Division, Development Services Department (Building Permit Center) can check the paper file.

What needs a permit in Aurora

Every project type we have verified in Aurora, with the rule, the threshold, and the fee that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsdeck height above grade at which a permit is required regardless of whether the deck is attached to the houseSee schedule
Electrical PermitIt dependsBefore any electrical service change and before modifying or extending the electrical...See schedule
Fence PermitIt dependsfence height at which a building permit is requiredThere is no fence line item on the 2026 flat-rate schedule (Form #A175, footer "Flat-Rate Fee (Revised 08/2026)"); the schedule has the rest
HVAC PermitIt dependsBefore replacing or installing a furnace, boiler, central air conditioner, evaporative...On the 2026 flat-rate schedule (Form #A175, footer "Flat-Rate Fee (Revised 08/2026)"), "Air Conditioner Replacement"; the schedule has the rest
Patio PermitIt dependsheight above grade of an uncovered concrete patio at which a permit is requiredSee schedule
Plumbing PermitIt dependsBefore replacing a water heater, before modifying the plumbing system, and before any...On the 2026 flat-rate schedule (Form #A175, footer "Flat-Rate Fee (Revised 08/2026)"); the schedule has the rest
Pool PermitIt dependspool depth at which a building permit is requiredThere is no swimming pool or spa line item on the 2026 flat-rate schedule (Form #A175, footer "Flat-Rate Fee (Revised 08/2026)"); the schedule has the rest
Roof Replacement PermitPermit requiredAny sizeSee schedule
Shed PermitIt dependsshed floor area at which a building permit is requiredThere is no storage-shed line item on the 2026 flat-rate schedule (Form #A175, footer "Flat-Rate Fee (Revised 08/2026)"); the schedule has the rest
Solar PermitPermit requiredAny sizeSee schedule

Everything we have verified about permits in Aurora