Deck Permit in Aurora, Colorado

It depends

Sometimes, depending on the project

Before building or replacing any deck more than 30 inches above grade, and before building any deck attached to the house even if it sits lower than that.

Confirmed on official page Verified City of Aurora Building Division, Development Services Department (Building Permit Center)

By Mario Bailey, verified against official sources

Quick answer

Aurora splits decks at 30 inches above grade. A deck more than 30 inches above grade always needs a permit; a deck less than 30 inches above grade needs one only if it is attached to the house, which leaves a low freestanding deck as the one case the city does not permit. Either way a permitted deck takes a plan submittal with a plot plan, reviewed for setbacks to property lines and utility easements, and a framing/structural inspection.

Typical threshold: deck height above grade at which a permit is required regardless of whether the deck is attached to the house.

Diagram of the 30 in above grade deck height above grade threshold for a deck permit in Aurora, Colorado
Threshold illustrated: 30 in above grade. Whether Aurora requires a permit above or below this measurement is stated in the verdict on this page, verified 2026-08-16.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?

When a permit is usually needed

Before building or replacing any deck more than 30 inches above grade, and before building any deck attached to the house even if it sits lower than that.

What a deck permit costs in Aurora

Line item
deck permitBy formulaOn the 2026 flat-rate schedule (Form #A175, footer "Flat-Rate Fee (Revised 08/2026)") the line item "Single Family Residential Deck" sits under the price heading "$402 EACH", so a residential deck permit is a flat $402.00 rather than a valuation calculation. City use tax on materials is collected separately: "The flat fee process has no effect on the calculation and collection of city use taxes.".
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Aurora compares in Colorado

JurisdictionPermit needed?Threshold
Aurorathis pageIt dependsdeck height above grade at which a permit is required regardless of whether the deck is attached to the house
DenverIt dependsuncovered decks under 12 in off the ground require no permit; 12 in or more requires a zoning permit; 30 in or more also requires a building permit
Jefferson CountyPermit requiredNo exemption by height or size: a Building Permit is required for new decks, deck expansions, replacement decks, and deck repairs. Only a ground-level concrete pad, rather than an elevated deck, avoids the permit.

Closest deck permit thresholds outside Colorado

Jurisdictions we cover whose limit sits nearest Aurora's 30 inches above grade.

  • Arlington, Texas, height of an uncovered deck above grade at any point
  • Clark County, Washington, Exempt only if the deck does not exceed 200 square feet, is not more than 30 inches above grade at any point, is not attached to a dwelling, does not serve a required exit door, and is not used for a hot tub or pool; all other decks require a permit.
  • Kansas City, Missouri, height of a platform or deck above grade at any point, where it is also not located over any basement or story below
  • Los Angeles County, California, height of the deck surface above grade; the exemption also requires the deck not to be over any basement or story below and not to be part of an accessible route

How to apply in Aurora

A residential deck permit application is a set of construction documents that show what will be built and prove it meets the IRC deck provisions. In practice that means a scaled site plan locating the deck and its setbacks, plus deck plans and structural details covering the footings, posts, beams, joists, ledger, guards, and stairs.

What most deck permit applications include:

  • A permit application identifying the work, the deck's size (square footage), and whether electrical work such as lights or receptacles is included, submitted for plan review before construction begins (IRC R106).
  • A scaled site plan (for example 1/4 inch to 1 foot) showing the new deck's location relative to the house, its overall length and width, and dimensioned distances from the deck to all property lines and other structures so required setbacks can be verified (IRC R106.1.1).
  • A deck plan drawn to scale showing overall dimensions and the framing layout: joist size, spacing, span, and species; beam size and span; post size and height; and footing or pier size and depth (IRC R507.4 posts, R507.5 beams, R507.6 joists, R507.3 footings).
  • A section or side elevation with connection details showing the ledger attachment to the house band joist with flashing, the fastener or bolt schedule, joist hangers, post-to-beam and post-to-footing connections, and the required lateral load connection (IRC R507.9 ledger connection, R507.9.2 lateral connection, R507.2.4 flashing).
  • Footing sizing derived from tributary area, the soil bearing value, and design loads per IRC Table R507.3.1, with footings shown bearing on undisturbed soil at the frost depth required by the jurisdiction (IRC R507.3).
  • Details for the guards required where the walking surface is more than 30 inches above grade, and for the stairs and handrails, showing guard height and opening limits, stair riser and tread dimensions, and handrail location (IRC R312 guards, R311.7 stairs and handrails).
  • For designs that fall outside the prescriptive R507 tables (for example multi-story or stacked decks, or a ledger attached to a cantilever), engineered and stamped structural plans are submitted in place of the prescriptive details (IRC R507.1 and R301).

General submittal guidance from IRC R106.1.1 (construction documents) and IRC R507 (exterior decks), 2021 IRC. Source. City of Aurora Building Division, Development Services Department (Building Permit Center) sets the exact checklist for Aurora.

Where to apply in Aurora:

City of Aurora Building Division, Development Services Department (Building Permit Center)

Inspections and closing out your permit

Deck work is inspected in sequence as it is built: the footings before concrete is placed, the framing before the decking boards go down, and a final inspection once the deck is complete. Each stage checks the items that would be hidden or unsafe if missed.

  1. Footing or pier inspection: after the holes are dug and any forms or reinforcing are set but before concrete is placed, the inspector checks footing depth and diameter, a flat undisturbed bearing surface, and that the holes are free of water (IRC R109.1.1 foundation inspection; R507.3 footings).
  2. Framing inspection: after the deck is framed but before the decking conceals it, the inspector verifies the ledger attachment and its flashing, the fastener and bolt schedule, joist hangers and metal connectors, post-to-beam and post-to-footing connections, and the lateral load connection; call it before decking is installed (IRC R109.1.4 frame inspection; R507.9 ledger and flashing).
  3. Final inspection: after the deck is complete and before it is used, the inspector confirms guard height and opening limits (a 4 inch sphere must not pass, 4 3/8 inch at stairs), stair riser and tread dimensions, handrail height and graspability where there are 4 or more risers, stair landings, and required stair lighting (IRC R109.1.6 final inspection; R312 guards, R311.7 stairs and handrails).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Aurora permit portal or by phone at 303-739-7420.

Inspection sequence from IRC R109 (inspections: R109.1.1 footing before concrete, R109.1.4 frame, R109.1.6 final), 2021 IRC. Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need a deck permit in Aurora?
Aurora splits decks at 30 inches above grade. A deck more than 30 inches above grade always needs a permit; a deck less than 30 inches above grade needs one only if it is attached to the house, which leaves a low freestanding deck as the one case the city does not permit. Either way a permitted deck takes a plan submittal with a plot plan, reviewed for setbacks to property lines and utility easements, and a framing/structural inspection. Deck height above grade at which a permit is required regardless of whether the deck is attached to the house. Always confirm with the office before starting.
How much does a deck permit cost in Aurora?
On the 2026 flat-rate schedule (Form #A175, footer "Flat-Rate Fee (Revised 08/2026)") the line item "Single Family Residential Deck" sits under the price heading "$402 EACH", so a residential deck permit is a flat $402.00 rather than a valuation calculation. City use tax on materials is collected separately: "The flat fee process has no effect on the calculation and collection of city use taxes.". See the official fee schedule for current amounts.
Where do you apply for a deck permit in Aurora?
You can apply through the Aurora permit portal or contact the City of Aurora Building Division, Development Services Department (Building Permit Center) directly. The links are listed on this page.
Can a homeowner pull a deck permit themselves in Aurora?
Under Colorado law (C.R.S. 12-115-116(2); C.R.S. 12-115-120(11)(c); C.R.S. 12-155-118(2); C.R.S. 12-155-120(11)(c)): Colorado's state electrical law has a homeowner exception: under C.R.S. 12-115-116(2), you do not need an electrician's license to do electrical work on your own property or residence, as long as all the work, other than maintenance or repair of existing systems, is inspected under the state law. The exception does not apply if the property is intended for sale or resale by someone in the construction or remodeling business, is rental property, or is generally open to the public. A homeowner performing work on the homeowner's home is a qualified applicant who may pull the state electrical permit under C.R.S. 12-115-120(11)(c), and plumbing mirrors this: C.R.S. 12-155-118(2) allows unlicensed plumbing work on your own property or residence with the same carve-outs, and C.R.S. 12-155-120(11)(c) lets a homeowner pull the state plumbing permit. The State Electrical and Plumbing Boards at DORA require that the homeowner personally perform the work, that it be inspected before cover and again at completion, and that it meet the National Electrical Code or the adopted plumbing codes. Colorado has no statewide general contractor license: Title 12 licenses electricians and plumbers at the state level, and general building contractors are licensed, if at all, by the individual city or county. Confirm how Aurora applies this before you apply.

From the Library

What else needs a permit in Aurora

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Electrical PermitIt dependsNot specifiedOn the 2026 flat-rate schedule (Form #A175, footer "Flat-Rate Fee (Revised 08/2026)")...
Fence PermitIt dependsfence height at which a building permit is requiredThere is no fence line item on the 2026 flat-rate schedule (Form #A175, footer...
HVAC PermitIt dependsNot specifiedOn the 2026 flat-rate schedule (Form #A175, footer "Flat-Rate Fee (Revised 08/2026)")...
Patio PermitIt dependsheight above grade of an uncovered concrete patio at which a permit is requiredOn the 2026 flat-rate schedule (Form #A175, footer "Flat-Rate Fee (Revised 08/2026)")...
Plumbing PermitIt dependsNot specifiedOn the 2026 flat-rate schedule (Form #A175, footer "Flat-Rate Fee (Revised 08/2026)")...
Pool PermitIt dependspool depth at which a building permit is requiredThere is no swimming pool or spa line item on the 2026 flat-rate schedule (Form #A175...
Roof Replacement PermitPermit requiredNot specifiedOn the 2026 flat-rate schedule (Form #A175, footer "Flat-Rate Fee (Revised 08/2026)")...
Shed PermitIt dependsshed floor area at which a building permit is requiredThere is no storage-shed line item on the 2026 flat-rate schedule (Form #A175, footer...
Solar PermitPermit requiredNot specifiedOn the 2026 flat-rate schedule (Form #A175, footer "Flat-Rate Fee (Revised 08/2026)")...

Deck Permit in other Colorado localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not Aurora documents; the office above sets the local rules.

Verified by a person against the sources above on , not confirmed with City of Aurora Building Division, Development Services Department (Building Permit Center). Rules change; confirm before you build. How we verify.