HVAC Permit in Aurora, Colorado
It depends
Sometimes, depending on the project
Before replacing or installing a furnace, boiler, central air conditioner, evaporative (swamp) cooler or rooftop unit, and before any gas piping work. A plug-in window air conditioner needs no permit unless it is hard-wired.
By Mario Bailey, verified against official sources
Quick answer
Aurora requires a mechanical permit for essentially all fixed heating and cooling work: central air conditioning, furnace replacements, evaporative coolers, boilers and gas piping are all listed as 'Always'. The exceptions are narrow and specific, namely a window air conditioner, which needs no permit unless it is hard-wired, and humidifier installations, which need none at all. Most of this equipment needs no plan submittal but does draw mechanical and electrical inspections.
Who is pulling this permit?
Apply yourself
Hire it out
Before you sign, ask the contractor:
- Who pulls the permit, you or me, and is the permit fee included in the bid?
- Which inspections will this job need, and who meets the inspector on site?
- Is your contractor license active in this locality, and under which business name?
When a permit is usually needed
Before replacing or installing a furnace, boiler, central air conditioner, evaporative (swamp) cooler or rooftop unit, and before any gas piping work. A plug-in window air conditioner needs no permit unless it is hard-wired.
What an HVAC permit costs in Aurora
How Aurora compares in Colorado
No Colorado jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.
| Jurisdiction | Permit needed? | Typical fee |
|---|---|---|
| Aurorathis page | It depends | On the 2026 flat-rate schedule (Form #A175, footer "Flat-Rate Fee (Revised... |
| Denver | Permit required | Valuation-based fee per CPD Table 1 with a $20 minimum |
| Jefferson County | Permit required | Mechanical permits not tied to an active building permit bill on the... |
How to apply in Aurora
A residential HVAC (mechanical) permit application must identify the covered equipment and scope of work, since installing, altering, or replacing a heating or cooling system is regulated work that cannot start until the application is submitted and the permit issued. The equipment itself must be picked by a real sizing calculation rather than a rule of thumb.
What most HVAC permit applications include:
- A mechanical permit is required before anyone may install, alter, repair, remove, convert, or replace a heating, ventilating, or air conditioning system regulated by the code, and the work may not begin until the application is submitted and the permit is issued (IRC R105.1).
- The application identifies the specific equipment being installed, such as a furnace, heat pump, or air conditioner, since the unit must be installed according to its listing and the manufacturer's installation instructions (IRC M1401.1).
- The proposed equipment location must leave the clearances needed to clean coils and replace filters, blowers, motors, and controls after installation (IRC M1401.2).
- The application carries the equipment sizing basis: ACCA Manual J building loads and Manual S equipment selection, or another approved sizing method, not a rule of thumb (IRC M1401.3).
- For a split system, the work covered by the permit includes refrigerant suction line insulation, since the piping is inspected against that standard once installed (IRC M1411.6).
General submittal guidance from International Residential Code (IRC), 2021 edition, Chapter 1 (Permits) and Chapter 14 (Heating and Cooling Equipment and Appliances). Source. City of Aurora Building Division, Development Services Department (Building Permit Center) sets the exact checklist for Aurora.
Where to apply in Aurora:
City of Aurora Building Division, Development Services Department (Building Permit Center)
- 15151 E. Alameda Parkway, Suite 2400, Aurora, CO 80012
- Phone: 303-739-7420
- Email: permitcounter@auroragov.org
Inspections and closing out your permit
Mechanical work gets a rough in inspection after the ductwork, refrigerant lines, and gas piping are in but before they are covered or concealed, followed by a final inspection that confirms the equipment operates correctly and its clearances, combustion air, and condensate disposal are in place. A straight equipment changeout with no new ductwork commonly gets a single final inspection instead of a separate rough in trip.
- Rough inspection of the mechanical and gas systems must be made before the work is covered or concealed, before fixtures or appliances are set or installed, and before the framing inspection (IRC R109.1.2).
- Where a cooling coil is added to an existing warm air furnace, the rough in confirms the coil is not installed upstream of the heat exchanger unless the furnace is listed for it, and that the blower can handle the added static pressure (IRC M1411.2).
- The rough in and final both confirm the appliance access opening and working space are large enough to service the unit (IRC M1305.1).
- At final inspection, the inspector verifies the equipment has adequate combustion air, with openings kept clear for the distance the code requires (IRC M1402.3).
- Final inspection also checks that the condensate line drains to an approved point of disposal with the required slope and does not create a nuisance (IRC M1411.3).
- For a straight equipment changeout with no new ductwork, many permit offices require only a single final inspection, while a new installation still gets a rough in inspection before the final (common local inspection practice).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Aurora permit portal or by phone at 303-739-7420.
Inspection sequence from International Residential Code (IRC), 2021 edition, Section R109 (Required Inspections) and Chapter 14 (Heating and Cooling Equipment and Appliances). Source. An open permit left un-inspected can surface later in a title search or home sale.
Your HVAC Permit checklist for Aurora
- Confirm the requirement. Sometimes, depending on the project. Usually needed: Before replacing or installing a furnace, boiler, central air conditioner, evaporative (swamp) cooler or rooftop unit, and before any gas piping work. A plug-in window air conditioner needs no permit unless it is hard-wired.
- Budget the fee. On the 2026 flat-rate schedule (Form #A175, footer "Flat-Rate Fee (Revised 08/2026)"), "Air Conditioner Replacement", "Evaporative Cooler Replacement" and "Furnace Replacement" sit under the price heading "$201 EACH"; "Boiler Replacement" and "Furnace and Air Conditioner Replacement" under "$300 EACH"; "Rooftop Unit Replacement" and "Furnace, Air Conditioner and Water Heater Replacement" under "$336 EACH"; "Furnace and Water Heater Replacement" at "$292"; and "Gas Pipe Installation or Modification" under "$99 EACH". City use tax on materials is collected separately: "The flat fee process has no effect on the calculation and collection of city use taxes.". Official fee schedule.
- Apply. A residential HVAC (mechanical) permit application must identify the covered equipment and scope of work, since installing, altering, or replacing a heating or cooling system is regulated work that cannot start until the application is submitted and the permit issued. The equipment itself must be picked by a real sizing calculation rather than a rule of thumb. Start at the Aurora permit portal.
- Keep the office details handy. City of Aurora Building Division, Development Services Department (Building Permit Center). Phone: 303-739-7420. Address: 15151 E. Alameda Parkway, Suite 2400, Aurora, CO 80012.
- Plan for inspections. Mechanical work gets a rough in inspection after the ductwork, refrigerant lines, and gas piping are in but before they are covered or concealed, followed by a final inspection that confirms the equipment operates correctly and its clearances, combustion air, and condensate disposal are in place. A straight equipment changeout with no new ductwork commonly gets a single final inspection instead of a separate rough in trip.
Compiled from the official sources on this page. Last checked .
Frequently asked questions
- Do you need an HVAC permit in Aurora?
- Aurora requires a mechanical permit for essentially all fixed heating and cooling work: central air conditioning, furnace replacements, evaporative coolers, boilers and gas piping are all listed as 'Always'. The exceptions are narrow and specific, namely a window air conditioner, which needs no permit unless it is hard-wired, and humidifier installations, which need none at all. Most of this equipment needs no plan submittal but does draw mechanical and electrical inspections. Always confirm with the City of Aurora Building Division, Development Services Department (Building Permit Center) before starting.
- How much does an HVAC permit cost in Aurora?
- On the 2026 flat-rate schedule (Form #A175, footer "Flat-Rate Fee (Revised 08/2026)"), "Air Conditioner Replacement", "Evaporative Cooler Replacement" and "Furnace Replacement" sit under the price heading "$201 EACH"; "Boiler Replacement" and "Furnace and Air Conditioner Replacement" under "$300 EACH"; "Rooftop Unit Replacement" and "Furnace, Air Conditioner and Water Heater Replacement" under "$336 EACH"; "Furnace and Water Heater Replacement" at "$292"; and "Gas Pipe Installation or Modification" under "$99 EACH". City use tax on materials is collected separately: "The flat fee process has no effect on the calculation and collection of city use taxes.". See the official fee schedule for current amounts.
- Where do you apply for an HVAC permit in Aurora?
- You can apply through the Aurora permit portal or contact the City of Aurora Building Division, Development Services Department (Building Permit Center) directly. The links are listed on this page.
- Can a homeowner pull an HVAC permit themselves in Aurora?
- Under Colorado law (C.R.S. 12-115-116(2); C.R.S. 12-115-120(11)(c); C.R.S. 12-155-118(2); C.R.S. 12-155-120(11)(c)): Colorado's state electrical law has a homeowner exception: under C.R.S. 12-115-116(2), you do not need an electrician's license to do electrical work on your own property or residence, as long as all the work, other than maintenance or repair of existing systems, is inspected under the state law. The exception does not apply if the property is intended for sale or resale by someone in the construction or remodeling business, is rental property, or is generally open to the public. A homeowner performing work on the homeowner's home is a qualified applicant who may pull the state electrical permit under C.R.S. 12-115-120(11)(c), and plumbing mirrors this: C.R.S. 12-155-118(2) allows unlicensed plumbing work on your own property or residence with the same carve-outs, and C.R.S. 12-155-120(11)(c) lets a homeowner pull the state plumbing permit. The State Electrical and Plumbing Boards at DORA require that the homeowner personally perform the work, that it be inspected before cover and again at completion, and that it meet the National Electrical Code or the adopted plumbing codes. Colorado has no statewide general contractor license: Title 12 licenses electricians and plumbers at the state level, and general building contractors are licensed, if at all, by the individual city or county. Confirm how Aurora applies this before you apply.
From the Library
What else needs a permit in Aurora
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | deck height above grade at which a permit is required regardless of whether the deck is attached to the house | On the 2026 flat-rate schedule (Form #A175, footer "Flat-Rate Fee (Revised 08/2026)")... |
| Electrical Permit | It depends | Not specified | On the 2026 flat-rate schedule (Form #A175, footer "Flat-Rate Fee (Revised 08/2026)")... |
| Fence Permit | It depends | fence height at which a building permit is required | There is no fence line item on the 2026 flat-rate schedule (Form #A175, footer... |
| Patio Permit | It depends | height above grade of an uncovered concrete patio at which a permit is required | On the 2026 flat-rate schedule (Form #A175, footer "Flat-Rate Fee (Revised 08/2026)")... |
| Plumbing Permit | It depends | Not specified | On the 2026 flat-rate schedule (Form #A175, footer "Flat-Rate Fee (Revised 08/2026)")... |
| Pool Permit | It depends | pool depth at which a building permit is required | There is no swimming pool or spa line item on the 2026 flat-rate schedule (Form #A175... |
| Roof Replacement Permit | Permit required | Not specified | On the 2026 flat-rate schedule (Form #A175, footer "Flat-Rate Fee (Revised 08/2026)")... |
| Shed Permit | It depends | shed floor area at which a building permit is required | There is no storage-shed line item on the 2026 flat-rate schedule (Form #A175, footer... |
| Solar Permit | Permit required | Not specified | On the 2026 flat-rate schedule (Form #A175, footer "Flat-Rate Fee (Revised 08/2026)")... |
HVAC Permit in other Colorado localities
Everything above, sourced
Code references
National and state model-code sections the general guidance on this page is drawn from. They are not Aurora documents; the office above sets the local rules.
Verified by a person against the sources above on , not confirmed with City of Aurora Building Division, Development Services Department (Building Permit Center). Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page
Permit office
City of Aurora Building Division, Development Services Department (Building Permit Center)
303-739-7420Permit portalCompare