California / Los Angeles

Shed Permit in Los Angeles, California

By Mario Bailey Last checked 2026-06-17 · 2 official sources

Verified against official sources Based on building code

It depends

Quick answer

One-story detached sheds under 120 square feet and under 12 feet in height are exempt from a building permit in Los Angeles if they have no electrical or plumbing. Sheds at or above 120 sq ft or 12 ft in height require a building permit. Adding utilities to any shed also requires separate trade permits.

Typical threshold: one-story shed under 120 sq ft and under 12 ft in height with no electrical or plumbing does not require a permit.

120 sq ftfootprint
Threshold illustrated: 120 sq ft. Whether Los Angeles requires a permit above or below this measurement is stated in the verdict on this page, verified 2026-06-17.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?
Want a pro to handle this permit? Request free help

Tell us where your project stands. Free to ask; no obligation.

Where we have a vetted local pro who handles permits in Los Angeles, we connect you; otherwise we reply with the exact steps and office links for your situation. PermitNotebook is not a government agency and does not file permits. This is a free referral request; we may earn a fee if you hire a pro we introduce. Partners never influence our permit data. Privacy policy.

When a permit is usually needed

Before building a shed that exceeds the exempt threshold

What shed permit costs in Los Angeles

No shed-specific valuation multiplier printed; a shed requiring a permit takes the valuation-based building permit fee per LAMC 91.113 Table 1-A off declared project valuation, posted base $65 for valuation $100.01 to $2,000.

Official fee schedule

How Los Angeles compares in California

JurisdictionPermit needed?Threshold
Los Angelesthis pageIt dependsone-story shed under 120 sq ft and under 12 ft in height with no electrical or plumbing does not require a permit
SacramentoIt dependsdetached storage shed under 120 sq ft without electrical or plumbing does not require a permit
San DiegoIt dependsone-story detached accessory structure under 120 sq ft used as non-habitable storage does not require a permit
San JoseIt dependsshed under 120 sq ft without electrical or plumbing does not require a permit

Closest shed permit thresholds outside California

Jurisdictions we cover whose limit sits nearest Los Angeles's 120 sq ft.

  • Boston, Massachusetts, one-story detached accessory sheds used for tools or storage are exempt if floor area does not exceed 120 sq ft
  • Chandler, Arizona, One-story detached accessory structures (storage sheds, open-air ramadas) with floor area of 120 sq ft or less and height of 7 ft or less (up to 9 ft with 2 additional feet of setback per additional foot of height) are exempt if not connected to any electrical, gas, or water utility; exceeding either limit or connecting a utility requires a building permit.
  • Houston, Texas, one-story detached accessory structure under 120 sq ft does not require a permit
  • Jefferson County, Colorado, Sheds, mini-structures, and shipping containers 120 sq ft or less that sit at least 10 feet from any occupied structure and are no more than 14 feet tall need only a Miscellaneous Permit; anything larger, taller, or closer than 10 feet to an occupied structure needs a full Building Permit instead. Some permit is required at every size.

How to apply in Los Angeles

A residential shed permit application, once the shed is large enough to require one, is a set of construction documents that show what will be built and prove it meets the adopted residential code. In practice that means a written permit application, a scaled site plan locating the shed and its distances to the property lines, and construction documents covering the shed's foundation or anchoring system and its framing.

What most shed permit applications include:

  • A written permit application identifying the proposed work and describing the property by its address or legal description, filed with the building department before construction begins (IRC R105.3).
  • A scaled site plan showing the shed's size and location and its dimensioned distances to all property lines so required setbacks can be verified before the permit is issued (IRC R106.2).
  • Construction documents showing the shed's foundation: freestanding accessory structures at or under the code's small-structure size and eave-height limits (600 square feet and a 10 foot eave height in the model code) are exempt from continuous footings but must still be shown supported on undisturbed soil or engineered fill and anchored to resist wind-induced uplift and overturning (IRC R403.1).
  • Where the shed does sit on a continuous foundation with a wood sill plate, anchor bolt or approved strap details tying the sill plate to the foundation (IRC R403.1.6).
  • Roof framing details showing the rafter-to-wall or truss-to-wall connections, since even a shed exempt from continuous footings must be anchored to resist wind-induced uplift and overturning (IRC R403.1; R802.11).

General submittal guidance from IRC R105.3 (permit application), R106.2 (site plan), R403.1 (footings and anchorage for accessory structures), and R403.1.6 (sill anchorage), 2021 IRC. Source. Los Angeles Department of Building and Safety sets the exact checklist for Los Angeles.

Where to apply in Los Angeles:

Los Angeles Department of Building and Safety

  • 201 N. Figueroa St., Los Angeles, CA 90012
  • Phone: (213) 473-3231

Inspections and closing out your permit

A permitted shed is inspected in stages as it goes up: the foundation or the anchors that hold it down before they are covered, the framing before it is enclosed, and a final inspection once the shed is finished. Each stage checks the items that would be hidden or unsafe if skipped.

  1. Foundation or anchor inspection: called after any required footings, piers, or ground anchors are set and any forms or reinforcing steel are in place, but before concrete is placed, so the foundation or anchoring system can be verified before it is covered (IRC R109.1.1).
  2. Frame inspection: after the shed is framed, sheathed, and braced, the inspector checks the framing, bracing, fasteners, and the roof connections that resist wind uplift, before those elements are covered (IRC R109.1.4 frame inspection; R403.1 anchorage).
  3. Final inspection: made after the permitted work is complete and before the shed is used; work may not proceed past any inspection stage without the building official's approval (IRC R109.1.6 final inspection; R109.4 approval required).
  4. For a pre-fabricated or kit shed, the manufacturer's installation instructions must be on site at the time of inspection so the inspector can confirm the anchoring and assembly match the design (IRC R106.1.2).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Los Angeles permit portal or by phone at (213) 473-3231.

Inspection sequence from IRC R109.1.1 (foundation inspection), R109.1.4 (frame inspection), R109.1.6 (final inspection), and R106.1.2 (manufacturer's instructions on site), 2021 IRC. Source. An open permit left un-inspected can surface later in a title search or home sale.

First-time inspection pass rates in Los Angeles

Measured from Los Angeles's own inspection event log: how often each inspection type passes on the first visit.

  • Final: 62% pass first time (n=80,069)
  • Smoke Detectors: 90% pass first time (n=38,441)
  • Floor/Roof Diaphrgm/Shear Wall: 61% pass first time (n=33,475)
  • Interior/Exterior Lathing: 50% pass first time (n=23,574)
  • Footing/Foundation/Slab: 58% pass first time (n=21,651)

2023-07-26 to 2026-07-26. Source: City of Los Angeles building and safety inspections (open data). Full study.

Permitting activity in Los Angeles

In 2024, Los Angeles authorized permits for 10,488 new residential housing units (3,041 single-family, 7,447 in multi-family buildings), valued at $1.6B, down from13,154 the year before. That works out to about 2.6 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2024 annual data · population 3,970,219.

About Los Angeles

Los Angeles has about 1,537,034 housing units. The median home is valued at $879,500, against a median household income of $80,366. About 36% of homes are owner-occupied, and the typical home was built around 1964.

Source: U.S. Census Bureau, American Community Survey 2023 5-year.

Frequently asked questions

Do you need a shed permit in Los Angeles?
One-story detached sheds under 120 square feet and under 12 feet in height are exempt from a building permit in Los Angeles if they have no electrical or plumbing. Sheds at or above 120 sq ft or 12 ft in height require a building permit. Adding utilities to any shed also requires separate trade permits. One-story shed under 120 sq ft and under 12 ft in height with no electrical or plumbing does not require a permit. Always confirm with the office before starting.
How much does a shed permit cost in Los Angeles?
No shed-specific valuation multiplier printed; a shed requiring a permit takes the valuation-based building permit fee per LAMC 91.113 Table 1-A off declared project valuation, posted base $65 for valuation $100.01 to $2,000. See the official fee schedule for current amounts.
Where do you apply for a shed permit in Los Angeles?
You can apply through the Los Angeles permit portal or contact the Los Angeles Department of Building and Safety directly. The links are listed on this page.

From the Library

What else needs a permit in Los Angeles

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredNot specifiedBuilding permit fee is graduated by declared project valuation per LAMC 91.113 Table 1-...
Electrical PermitPermit requiredNot specifiedItemized per installed item per the LADBS Electrical Permit Fee Schedule (rev 12/2016):...
Fence PermitIt dependsmasonry or concrete fence up to 6 ft in height may be built without a permit if it meets LADBS construction specifications in IB-P-BC2014-080; a solid masonry infill panel between pilasters may not exceed 3 ft 6 in with lightweight open material filling the remaining height; non-masonry fence height threshold not confirmed from official pageValuation-based building permit per LAMC 91.113 Table 1-A;
HVAC PermitPermit requiredNot specifiedItemized per piece of equipment per LADBS Fee Sch.3 (7/2017), for example a gas furnace...
Patio PermitPermit requiredNot specifiedValuation-based building permit per LAMC 91.113 Table 1-A;
Plumbing PermitPermit requiredNot specifiedItemized per fixture per LADBS Fee Sch.5 (7/2017), for example a toilet at $23 and a wa...
Pool PermitPermit requiredNot specifiedThe pool shell takes a valuation-based building permit with the LADBS Valuation Table p...
Roof Replacement PermitPermit requiredNot specifiedValuation-based building permit per LAMC 91.113 Table 1-A;
Solar PermitPermit requiredNot specifiedResidential rooftop PV is an electrical permit with itemized per-component fees per the...

Shed Permit in other California localities

Official sources

Verified by a person against the sources above on 2026-06-17, not confirmed with Los Angeles Department of Building and Safety. Rules change; confirm before you build. How we verify.

Last checked: 2026-06-17Report an error on this page

Compare Shed Permit requirements across California localities