California / Los Angeles

Electrical Permit in Los Angeles, California

Permit required

Yes, a permit is required

For all new wiring circuits panels and electrical service work

Confirmed on official page Verified

Issued byLos Angeles Department of Building and Safety

By Mario Bailey, verified against official sources

Typical job value
$7,200
declared valuation

Quick answer

An electrical permit is required in Los Angeles for new wiring, panel upgrades, and service work. Electrical installations under 600 volts up to 400 amps qualify for an Express Permit. EV charging (up to 400 amp service) and smoke/CO detector installation are also express-eligible. A licensed electrician is typically required for permitted work.

Who is pulling this permit?

Hire it out

Sponsored

Electrical permits are usually pulled by the licensed electrician doing the job. If you are still choosing one, compare a few quotes first.

Compare electrician quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

When a permit is usually needed

For all new wiring circuits panels and electrical service work

What an electrical permit costs in Los Angeles

Line item
electrical permitBy formulaItemized per installed item per the LADBS Electrical Permit Fee Schedule (rev 12/2016): minimum $55 for one item under $55 or $90 for two or more items, plus a 3% D.S.C.S. surcharge and a 6% Systems Surcharge each with a $1 minimum.
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Los Angeles compares in California

No California jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.

JurisdictionPermit needed?Typical fee
Alameda CountyPermit required...permit scope, 'Electrical Permit 20% of Building Permit Fees, $140.00...
Contra Costa CountyPermit requiredLand Development Fee Schedule S-002 C.6, "Electrical Permit (Other) $75.00...
Fresno CountyPermit requiredSection 2511 Electrical Code Fees, FY 2026-27: Issuing permits $42.77 each
Los Angelesthis pagePermit required...per the LADBS Electrical Permit Fee Schedule (rev 12/2016): minimum $55...
Los Angeles CountyPermit required...of Los Angeles Code, Ord No. 2013-0049), effective July 1, 2026: $41.35...
Orange CountyPermit requiredElectrical Permit Application Flat Fee, 1 to 75 fixtures: $340 for FY 2024-25...
Riverside CountyPermit requiredResidential Electrical (BEL-RELE): $448.20 fixed fee

How to apply in Los Angeles

In Los Angeles, in most US jurisdictions, the property owner or a licensed electrician applies for an electrical permit before work starts, describing the scope of work and the property and typically attaching plans. Some minor, like-for-like electrical repairs are commonly exempt, and once issued the permit is kept on site until the job is finished.

What most electrical permit applications include:

  • Before any electrical work begins, the owner or an authorized agent must first apply to the building official and obtain the required permit (IRC R105.1).
  • For Los Angeles, the written application must identify and describe the electrical work covered by the permit and describe the property, such as by street address, well enough to locate the job (IRC R105.3).
  • For Los Angeles, the application must be accompanied by construction documents (plans) and any other information the permit office requires, and must be signed by the applicant or an authorized agent (IRC R105.3).
  • Certain minor or like-for-like electrical jobs, such as replacing a branch-circuit breaker of the required capacity in the same location, are commonly exempt from needing a separate permit (IRC R105.2).
  • Once issued, the building permit or a copy of it must be kept at the job site until the project is complete (IRC R105.7).

General submittal guidance from International Residential Code (IRC), Section R105, Permits (2015 and 2021 editions, as locally adopted). Source. Los Angeles Department of Building and Safety sets the exact checklist for Los Angeles.

Where to apply in Los Angeles:

Los Angeles Department of Building and Safety

  • 201 N. Figueroa St., Los Angeles, CA 90012
  • Phone: (213) 473-3231

Electrical Permit in Los Angeles compared with nearby California localities

LocalityPermit needed?ThresholdWhat each California schedule saysVerified
Los AngelesPermit requiredAny size...item per the LADBS Electrical Permit Fee Schedule (rev 12/2016): minimum $55 for...
Alameda CountyPermit requiredAny size...of a building permit scope, 'Electrical Permit 20% of Building Permit Fees, $140.00...
Contra Costa CountyPermit requiredAny sizeLand Development Fee Schedule S-002 C.6, "Electrical Permit (Other) $75.00 minimum."...
Fresno CountyPermit requiredAny sizeSection 2511 Electrical Code Fees, FY 2026-27: Issuing permits $42.77 each
Los Angeles CountyPermit requiredAny size...the County of Los Angeles Code, Ord No. 2013-0049), effective July 1, 2026: $41.35...

Inspections and closing out your permit

In Los Angeles, electrical work under a permit is inspected at least twice: a rough-in inspection of the wiring before it is covered by drywall or insulation, and a final inspection once all devices, panels, and labeling are complete. Inspectors also check specific safety items along the way, such as GFCI and AFCI protection, panel circuit directories, and the service disconnect location.

  1. In Los Angeles: a rough-in inspection of the electrical wiring is required before it is covered or concealed by insulation, drywall, or other finish material, and before fixtures or appliances are set (IRC R109.1.2).
  2. In Los Angeles: the framing inspection cannot proceed until the plumbing, mechanical, and electrical rough-in inspections have all been approved (IRC R109.1.4).
  3. In Los Angeles: ground-fault circuit-interrupter (GFCI) protection is checked at receptacles in bathrooms, kitchens, garages, basements, crawl spaces, outdoors, and other damp or wet locations (NEC 210.8(A)).
  4. In Los Angeles: arc-fault circuit-interrupter (AFCI) protection is verified on branch circuits serving bedrooms, living areas, and most other habitable rooms (NEC 210.12(A)).
  5. In Los Angeles: panelboards must carry a circuit directory that legibly and specifically identifies the purpose of each circuit, not a vague label (NEC 408.4).
  6. In Los Angeles: the service disconnect must be installed in a readily accessible location, either outside the structure or just inside the point where the service conductors enter (NEC 230.70).
  7. In Los Angeles: a final inspection is made only after all permitted electrical work is complete, and the wiring cannot be used or the space occupied until it passes (IRC R109.1.6).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Los Angeles permit portal or by phone at (213) 473-3231.

Inspection sequence from International Residential Code (IRC), Section R109, Required Inspections, and NFPA 70 National Electrical Code (NEC), 2020 and 2023 editions. Source. An open permit left un-inspected can surface later in a title search or home sale.

First-time inspection pass rates in Los Angeles

Measured from Los Angeles's own inspection event log: how often each inspection type passes on the first visit.

  • Final: 62% pass first time (n=80,069)
  • Smoke Detectors: 90% pass first time (n=38,441)
  • Floor/Roof Diaphrgm/Shear Wall: 61% pass first time (n=33,475)
  • Interior/Exterior Lathing: 50% pass first time (n=23,574)
  • Footing/Foundation/Slab: 58% pass first time (n=21,651)

to . Source: City of Los Angeles building and safety inspections (open data). Full study.

Permitting activity in Los Angeles

In 2025, Los Angeles authorized permits for 11,211 new residential housing units (3,848 single-family, 7,363 in multi-family buildings), valued at $1.9B, up from 10,488 the year before. That works out to about 2.8 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 3,970,219.

About Los Angeles

Los Angeles has about 1,537,034 housing units. The median home is valued at $879,500, against a median household income of $80,366. About 36% of homes are owner-occupied, and the typical home was built around 1964.

Source: U.S. Census Bureau, American Community Survey 2023 5-year.

Frequently asked questions

Do you need an electrical permit in Los Angeles?
An electrical permit is required in Los Angeles for new wiring, panel upgrades, and service work. Electrical installations under 600 volts up to 400 amps qualify for an Express Permit. EV charging (up to 400 amp service) and smoke/CO detector installation are also express-eligible. A licensed electrician is typically required for permitted work. Always confirm with the Los Angeles Department of Building and Safety before starting.
How much does an electrical permit cost in Los Angeles?
Itemized per installed item per the LADBS Electrical Permit Fee Schedule (rev 12/2016): minimum $55 for one item under $55 or $90 for two or more items, plus a 3% D.S.C.S. surcharge and a 6% Systems Surcharge each with a $1 minimum. See the official fee schedule for current amounts.
Where do you apply for an electrical permit in Los Angeles?
You can apply through the Los Angeles permit portal or contact the Los Angeles Department of Building and Safety directly. The links are listed on this page.
Can a homeowner pull an electrical permit themselves in Los Angeles?
Under California law (Business & Professions Code 7044(a)-(b); Business & Professions Code 7031.5): California exempts an owner from contractor licensing under section 7044 when they personally perform all the work on their own property, or any work they do not perform themselves is done by their own employees paid only wages, and none of the improvements are intended or offered for sale. It also exempts an owner who directly contracts with licensed contractors for each trade, as long as no more than four of the single-family residential structures involved are intended or offered for sale in a calendar year; this route does not apply if the owner instead contracts with a general contractor for the construction. A homeowner may also improve their own principal residence without a license, as long as the work is done before any sale, they have actually resided there for the 12 months before completion, and they have not used this exemption on more than two structures more than once in any three-year period. Selling a self-built structure within one year of completion creates a rebuttable presumption that it was built for sale, which defeats the exemption, and selling five or more structures within a year makes that presumption conclusive. Separately, every city or county that requires a permit must also require the applicant to file a signed statement giving their contractor license number or the basis of their claimed exemption; a false or missing statement carries a civil penalty of up to $500. Confirm how Los Angeles applies this before you apply.

From the Library

What else needs a permit in Los Angeles

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredAny size...graduated by declared project valuation per LAMC 91.113 Table 1-A, posted base $65...
Fence PermitIt dependsmasonry or concrete fence up to 6 ft in height may be built without a permit if it meets LADBS construction specifications in IB-P-BC2014-080; a solid masonry infill panel between pilasters may not exceed 3 ft 6 in with lightweight open material filling the remaining height; non-masonry fence height threshold not confirmed from official pageValuation-based building permit per LAMC 91.113 Table 1-A
HVAC PermitPermit requiredAny size...piece of equipment per LADBS Fee Sch.3 (7/2017), for example a gas furnace at $19...
Patio PermitPermit requiredAny sizeValuation-based building permit per LAMC 91.113 Table 1-A
Plumbing PermitPermit requiredAny sizeItemized per fixture per LADBS Fee Sch.5 (7/2017), for example a toilet at $23 and a...
Pool PermitPermit requiredAny size...building permit with the LADBS Valuation Table pricing a concrete pool at $43 per...
Roof Replacement PermitPermit requiredAny sizeValuation-based building permit per LAMC 91.113 Table 1-A
Shed PermitIt dependsone-story shed under 120 sq ft and under 12 ft in height with no electrical or plumbing does not require a permitNo shed-specific valuation multiplier printed
Solar PermitPermit requiredAny size...with itemized per-component fees per the LADBS Electrical Permit Fee Schedule: $6...

Electrical Permit in other California localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not Los Angeles documents; the office above sets the local rules.

How this electrical permit page for Los Angeles was verified. 2 official sources: dbs.lacity.gov, dbs.lacity.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Los Angeles Department of Building and Safety. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page