California / Los Angeles

Electrical Permit in Los Angeles, California

By Mario Bailey Last checked 2026-06-17 · 2 official sources

Verified against official sources Confirmed on official page

Permit required

Quick answer

An electrical permit is required in Los Angeles for new wiring, panel upgrades, and service work. Electrical installations under 600 volts up to 400 amps qualify for an Express Permit. EV charging (up to 400 amp service) and smoke/CO detector installation are also express-eligible. A licensed electrician is typically required for permitted work.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?
Want a pro to handle this permit? Request free help

Tell us where your project stands. Free to ask; no obligation.

Where we have a vetted local pro who handles permits in Los Angeles, we connect you; otherwise we reply with the exact steps and office links for your situation. PermitNotebook is not a government agency and does not file permits. This is a free referral request; we may earn a fee if you hire a pro we introduce. Partners never influence our permit data. Privacy policy.

When a permit is usually needed

For all new wiring circuits panels and electrical service work

What electrical permit costs in Los Angeles

Itemized per installed item per the LADBS Electrical Permit Fee Schedule (rev 12/2016): minimum $55 for one item under $55 or $90 for two or more items, plus a 3% D.S.C.S. surcharge and a 6% Systems Surcharge each with a $1 minimum.

Official fee schedule

How Los Angeles compares in California

No California jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.

JurisdictionPermit needed?Typical fee
Los Angelesthis pagePermit requiredItemized per installed item per the LADBS Electrical Permit Fee Schedule (rev...
SacramentoPermit requiredFlat $105 permit fee for one-trade minor electrical work such as a panel chan...
San DiegoPermit requiredBilled per circuit or panel under IB-103 Table 2 effective May 2026: circuits...
San JosePermit requiredGreater of $315 per hour of required inspection time or an itemized fixture-b...

How to apply in Los Angeles

In most US jurisdictions, the property owner or a licensed electrician applies for an electrical permit before work starts, describing the scope of work and the property and typically attaching plans. Some minor, like-for-like electrical repairs are commonly exempt, and once issued the permit is kept on site until the job is finished.

What most electrical permit applications include:

  • Before any electrical work begins, the owner or an authorized agent must first apply to the building official and obtain the required permit (IRC R105.1).
  • The written application must identify and describe the electrical work covered by the permit and describe the property, such as by street address, well enough to locate the job (IRC R105.3).
  • The application must be accompanied by construction documents (plans) and any other information the permit office requires, and must be signed by the applicant or an authorized agent (IRC R105.3).
  • Certain minor or like-for-like electrical jobs, such as replacing a branch-circuit breaker of the required capacity in the same location, are commonly exempt from needing a separate permit (IRC R105.2).
  • Once issued, the building permit or a copy of it must be kept at the job site until the project is complete (IRC R105.7).

General submittal guidance from International Residential Code (IRC), Section R105, Permits (2015 and 2021 editions, as locally adopted). Source. Los Angeles Department of Building and Safety sets the exact checklist for Los Angeles.

Where to apply in Los Angeles:

Los Angeles Department of Building and Safety

  • 201 N. Figueroa St., Los Angeles, CA 90012
  • Phone: (213) 473-3231

Inspections and closing out your permit

Electrical work under a permit is inspected at least twice: a rough-in inspection of the wiring before it is covered by drywall or insulation, and a final inspection once all devices, panels, and labeling are complete. Inspectors also check specific safety items along the way, such as GFCI and AFCI protection, panel circuit directories, and the service disconnect location.

  1. A rough-in inspection of the electrical wiring is required before it is covered or concealed by insulation, drywall, or other finish material, and before fixtures or appliances are set (IRC R109.1.2).
  2. The framing inspection cannot proceed until the plumbing, mechanical, and electrical rough-in inspections have all been approved (IRC R109.1.4).
  3. Ground-fault circuit-interrupter (GFCI) protection is checked at receptacles in bathrooms, kitchens, garages, basements, crawl spaces, outdoors, and other damp or wet locations (NEC 210.8(A)).
  4. Arc-fault circuit-interrupter (AFCI) protection is verified on branch circuits serving bedrooms, living areas, and most other habitable rooms (NEC 210.12(A)).
  5. Panelboards must carry a circuit directory that legibly and specifically identifies the purpose of each circuit, not a vague label (NEC 408.4).
  6. The service disconnect must be installed in a readily accessible location, either outside the structure or just inside the point where the service conductors enter (NEC 230.70).
  7. A final inspection is made only after all permitted electrical work is complete, and the wiring cannot be used or the space occupied until it passes (IRC R109.1.6).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Los Angeles permit portal or by phone at (213) 473-3231.

Inspection sequence from International Residential Code (IRC), Section R109, Required Inspections, and NFPA 70 National Electrical Code (NEC), 2020 and 2023 editions. Source. An open permit left un-inspected can surface later in a title search or home sale.

First-time inspection pass rates in Los Angeles

Measured from Los Angeles's own inspection event log: how often each inspection type passes on the first visit.

  • Final: 62% pass first time (n=80,069)
  • Smoke Detectors: 90% pass first time (n=38,441)
  • Floor/Roof Diaphrgm/Shear Wall: 61% pass first time (n=33,475)
  • Interior/Exterior Lathing: 50% pass first time (n=23,574)
  • Footing/Foundation/Slab: 58% pass first time (n=21,651)

2023-07-26 to 2026-07-26. Source: City of Los Angeles building and safety inspections (open data). Full study.

Permitting activity in Los Angeles

In 2024, Los Angeles authorized permits for 10,488 new residential housing units (3,041 single-family, 7,447 in multi-family buildings), valued at $1.6B, down from13,154 the year before. That works out to about 2.6 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2024 annual data · population 3,970,219.

About Los Angeles

Los Angeles has about 1,537,034 housing units. The median home is valued at $879,500, against a median household income of $80,366. About 36% of homes are owner-occupied, and the typical home was built around 1964.

Source: U.S. Census Bureau, American Community Survey 2023 5-year.

Frequently asked questions

Do you need a electrical permit in Los Angeles?
An electrical permit is required in Los Angeles for new wiring, panel upgrades, and service work. Electrical installations under 600 volts up to 400 amps qualify for an Express Permit. EV charging (up to 400 amp service) and smoke/CO detector installation are also express-eligible. A licensed electrician is typically required for permitted work. Always confirm with the Los Angeles Department of Building and Safety before starting.
How much does a electrical permit cost in Los Angeles?
Itemized per installed item per the LADBS Electrical Permit Fee Schedule (rev 12/2016): minimum $55 for one item under $55 or $90 for two or more items, plus a 3% D.S.C.S. surcharge and a 6% Systems Surcharge each with a $1 minimum. See the official fee schedule for current amounts.
Where do you apply for a electrical permit in Los Angeles?
You can apply through the Los Angeles permit portal or contact the Los Angeles Department of Building and Safety directly. The links are listed on this page.

From the Library

What else needs a permit in Los Angeles

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredNot specifiedBuilding permit fee is graduated by declared project valuation per LAMC 91.113 Table 1-...
Fence PermitIt dependsmasonry or concrete fence up to 6 ft in height may be built without a permit if it meets LADBS construction specifications in IB-P-BC2014-080; a solid masonry infill panel between pilasters may not exceed 3 ft 6 in with lightweight open material filling the remaining height; non-masonry fence height threshold not confirmed from official pageValuation-based building permit per LAMC 91.113 Table 1-A;
HVAC PermitPermit requiredNot specifiedItemized per piece of equipment per LADBS Fee Sch.3 (7/2017), for example a gas furnace...
Patio PermitPermit requiredNot specifiedValuation-based building permit per LAMC 91.113 Table 1-A;
Plumbing PermitPermit requiredNot specifiedItemized per fixture per LADBS Fee Sch.5 (7/2017), for example a toilet at $23 and a wa...
Pool PermitPermit requiredNot specifiedThe pool shell takes a valuation-based building permit with the LADBS Valuation Table p...
Roof Replacement PermitPermit requiredNot specifiedValuation-based building permit per LAMC 91.113 Table 1-A;
Shed PermitIt dependsone-story shed under 120 sq ft and under 12 ft in height with no electrical or plumbing does not require a permitNo shed-specific valuation multiplier printed;
Solar PermitPermit requiredNot specifiedResidential rooftop PV is an electrical permit with itemized per-component fees per the...

Electrical Permit in other California localities

Official sources

Verified by a person against the sources above on 2026-06-17, not confirmed with Los Angeles Department of Building and Safety. Rules change; confirm before you build. How we verify.

Last checked: 2026-06-17Report an error on this page

Compare Electrical Permit requirements across California localities