California / Contra Costa County

Electrical Permit in Contra Costa County, California

Permit required

Yes, a permit is required

Before running new electrical, upgrading an electrical panel, rewiring a house, or installing an EV charger. The county issues these permits itself; there is no handoff to a state agency or utility.

Confirmed on official page Verified Contra Costa County Department of Conservation and Development, Building Inspection Division

By Mario Bailey, verified against official sources

Quick answer

Contra Costa County's Building Inspection Division issues electrical permits directly, and its fee schedule states plainly that an electrical permit is required for all electrical work regulated by the Electrical Code. Where electrical work is performed in conjunction with a building permit the fee may be added to that permit and a separate electrical permit is not required. Panel upgrades and whole-house rewiring are applied for as a "Building - Residential Electrical" minor permit, which covers upgrading existing panels or rewiring only and not new circuits or receptacles; residential EV chargers use the same permit type and must state the location of installation and the amperage.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?

When a permit is usually needed

Before running new electrical, upgrading an electrical panel, rewiring a house, or installing an EV charger. The county issues these permits itself; there is no handoff to a state agency or utility.

What an electrical permit costs in Contra Costa County

Line item
electrical permitBy formulaLand Development Fee Schedule S-002 C.6, "Electrical Permit (Other) $75.00 minimum." Electrical inspection fees for an addition or alteration to a dwelling unit start at $75.00 plus $0.14 for each additional $1,000 above $2,000 of improvement value; work not covered by the listed tiers is calculated from the S-002 A.1 Building Permit valuation table. Fee schedule adopted May 24, 2022, effective August 10, 2022.
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Contra Costa County compares in California

No California jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.

JurisdictionPermit needed?Typical fee
Alameda CountyPermit requiredBuilding Inspection Department Service Fee Schedule (Schedule A, effective...
Contra Costa Countythis pagePermit requiredLand Development Fee Schedule S-002 C.6, "Electrical Permit (Other) $75.00...
Fresno CountyPermit requiredSection 2511 Electrical Code Fees, FY 2026-27: Issuing permits $42.77 each
Los AngelesPermit requiredItemized per installed item per the LADBS Electrical Permit Fee Schedule (rev...
Los Angeles CountyPermit requiredElectrical Code Fee Schedule (Title 27 of the County of Los Angeles Code, Ord...
Orange CountyPermit requiredElectrical Permit Application Flat Fee, 1 to 75 fixtures: $340 for FY 2024-25...
Riverside CountyPermit requiredResidential Electrical (BEL-RELE): $448.20 fixed fee

How to apply in Contra Costa County

In most US jurisdictions, the property owner or a licensed electrician applies for an electrical permit before work starts, describing the scope of work and the property and typically attaching plans. Some minor, like-for-like electrical repairs are commonly exempt, and once issued the permit is kept on site until the job is finished.

What most electrical permit applications include:

  • Before any electrical work begins, the owner or an authorized agent must first apply to the building official and obtain the required permit (IRC R105.1).
  • The written application must identify and describe the electrical work covered by the permit and describe the property, such as by street address, well enough to locate the job (IRC R105.3).
  • The application must be accompanied by construction documents (plans) and any other information the permit office requires, and must be signed by the applicant or an authorized agent (IRC R105.3).
  • Certain minor or like-for-like electrical jobs, such as replacing a branch-circuit breaker of the required capacity in the same location, are commonly exempt from needing a separate permit (IRC R105.2).
  • Once issued, the building permit or a copy of it must be kept at the job site until the project is complete (IRC R105.7).

General submittal guidance from International Residential Code (IRC), Section R105, Permits (2015 and 2021 editions, as locally adopted). Source. Contra Costa County Department of Conservation and Development, Building Inspection Division sets the exact checklist for Contra Costa County.

Where to apply in Contra Costa County:

Contra Costa County Department of Conservation and Development, Building Inspection Division

Inspections and closing out your permit

Electrical work under a permit is inspected at least twice: a rough-in inspection of the wiring before it is covered by drywall or insulation, and a final inspection once all devices, panels, and labeling are complete. Inspectors also check specific safety items along the way, such as GFCI and AFCI protection, panel circuit directories, and the service disconnect location.

  1. A rough-in inspection of the electrical wiring is required before it is covered or concealed by insulation, drywall, or other finish material, and before fixtures or appliances are set (IRC R109.1.2).
  2. The framing inspection cannot proceed until the plumbing, mechanical, and electrical rough-in inspections have all been approved (IRC R109.1.4).
  3. Ground-fault circuit-interrupter (GFCI) protection is checked at receptacles in bathrooms, kitchens, garages, basements, crawl spaces, outdoors, and other damp or wet locations (NEC 210.8(A)).
  4. Arc-fault circuit-interrupter (AFCI) protection is verified on branch circuits serving bedrooms, living areas, and most other habitable rooms (NEC 210.12(A)).
  5. Panelboards must carry a circuit directory that legibly and specifically identifies the purpose of each circuit, not a vague label (NEC 408.4).
  6. The service disconnect must be installed in a readily accessible location, either outside the structure or just inside the point where the service conductors enter (NEC 230.70).
  7. A final inspection is made only after all permitted electrical work is complete, and the wiring cannot be used or the space occupied until it passes (IRC R109.1.6).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Contra Costa County permit portal or by phone at 925-655-2700.

Inspection sequence from International Residential Code (IRC), Section R109, Required Inspections, and NFPA 70 National Electrical Code (NEC), 2020 and 2023 editions. Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need an electrical permit in Contra Costa County?
Contra Costa County's Building Inspection Division issues electrical permits directly, and its fee schedule states plainly that an electrical permit is required for all electrical work regulated by the Electrical Code. Where electrical work is performed in conjunction with a building permit the fee may be added to that permit and a separate electrical permit is not required. Panel upgrades and whole-house rewiring are applied for as a "Building - Residential Electrical" minor permit, which covers upgrading existing panels or rewiring only and not new circuits or receptacles; residential EV chargers use the same permit type and must state the location of installation and the amperage. Always confirm with the Contra Costa County Department of Conservation and Development, Building Inspection Division before starting.
How much does an electrical permit cost in Contra Costa County?
Land Development Fee Schedule S-002 C.6, "Electrical Permit (Other) $75.00 minimum." Electrical inspection fees for an addition or alteration to a dwelling unit start at $75.00 plus $0.14 for each additional $1,000 above $2,000 of improvement value; work not covered by the listed tiers is calculated from the S-002 A.1 Building Permit valuation table. Fee schedule adopted May 24, 2022, effective August 10, 2022. See the official fee schedule for current amounts.
Where do you apply for an electrical permit in Contra Costa County?
You can apply through the Contra Costa County permit portal or contact the Contra Costa County Department of Conservation and Development, Building Inspection Division directly. The links are listed on this page.
Can a homeowner pull an electrical permit themselves in Contra Costa County?
Under California law (Business & Professions Code 7044(a)-(b); Business & Professions Code 7031.5): California exempts an owner-builder from contractor licensing when the owner personally performs the work, or uses only wage employees, on their own property and does not intend the improvements for sale. A homeowner may also directly hire licensed trade contractors for up to four single-family residences a year, or improve their own principal residence without a general contractor's license, as long as they have actually lived there for the 12 months before the work is finished. Selling a self-built structure within one year of completion creates a rebuttable presumption that it was built for sale, which defeats the exemption, and selling five or more structures within a year makes that presumption conclusive. Separately, every city or county that requires a building permit must also require the applicant to file a signed statement giving their contractor license number or the basis of their claimed exemption; a false or missing statement carries a $500 civil penalty. Confirm how Contra Costa County applies this before you apply.

From the Library

What else needs a permit in Contra Costa County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsarea of a deck that is also no more than 30 inches above grade at any point, is not attached to a dwelling, and does not serve a code-required exit doorNo deck-specific flat fee is published.
Fence PermitIt dependsheight of a fence, with concrete and masonry walls treated as walls rather than fencesLand Development Fee Schedule item 13, "Fences Greater than 7ft": Building Permit /...
HVAC PermitPermit requiredNot specifiedLand Development Fee Schedule S-002 D.6, "Mechanical Permit (Other) $75.00 minimum."...
Patio PermitIt dependsroof area of a trellis, arbor, or pergola accessory to a residence, treated by the county as a one-story detached accessory structureThe Building Valuation Data Supplement values a "Patio cover (includes pre-fab types...
Plumbing PermitPermit requiredNot specifiedLand Development Fee Schedule S-002 E.6, "Plumbing Permit (Other) $75.00 minimum."...
Pool PermitIt dependsdepth of a prefabricated pool accessory to a one or two family dwelling that is installed entirely above ground and holds no more than 5,000 gallonsThe Building Valuation Data Supplement sets a "Swimming pool, lump sum of: $39,514.98"...
Roof Replacement PermitPermit requiredNot specifiedLand Development Fee Schedule item 14, "Re-Roofs - Residential": Building Permit /...
Shed PermitIt dependsfloor area of a one-story detached accessory structureNo shed-specific flat fee is published.
Solar PermitPermit requiredNot specifiedLand Development Fee Schedule item 7, "Residential solar energy systems - roof mount and...

Electrical Permit in other California localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not Contra Costa County documents; the office above sets the local rules.

Verified by a person against the sources above on , not confirmed with Contra Costa County Department of Conservation and Development, Building Inspection Division. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page