California / Los Angeles County

Electrical Permit in Los Angeles County, California

Permit required

Yes, a permit is required

Before installing, extending, altering, or replacing electrical wiring, devices, panels, services, or fixed appliances, including main service panel upgrades and EV charger outlets.

Quick answer

An electrical permit is required in unincorporated Los Angeles County for new, expanded, or replaced electrical items. Title 27, Article 82 exempts only minor repair work such as replacing lamps, switches, receptacles, devices and sockets or plugging portable motors and appliances into permanently installed receptacles, temporary theater or stage wiring, wiring operating at less than 25 volts and not capable of supplying more than 50 watts, low-energy power, control, and signal circuits limited to 30 volts and 1000 volt-amperes, temporary decorative lighting, temporary testing wiring, replacement of over-current devices of the same type and rating, cord-and-plug portable equipment, and small private telephone, intercom, sound and communication systems, whose power supplies still need a permit. The Express Electrical Permit type covers any residential project that does not require an electrical plan check, including main panel upgrades and EV charger outlets, and is self-issued through EPIC-LA.

Issued by
Los Angeles County Public Works, Building and Safety Division
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

Electrical permits are usually pulled by the licensed electrician doing the job. If you are still choosing one, compare a few quotes first.

Compare electrician quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What an electrical permit costs in Los Angeles County

Fee schedule in force
Official scheduleRead .
Published in
Electrical Code Fee Schedule (Title 27 of the County of Los Angeles Code, Ord No. 2013-0049), effective July 1, 2026:
  • $41.35 for issuing permits, each.
  • New single and two-family residential buildings are charged $0.23 per square foot, not including garages, carports, and other minor accessory buildings built at the same time.
  • Alterations and additions to existing residential buildings use the branch circuit or unit fee schedule: $25.96 for each of the first 10 branch circuits of 15 or 20 ampere 120 volt lighting or general use receptacles, $21.59 for circuits 11 through 40, $19.30 above 40;
  • or by unit, $3.22 for each of the first 20 receptacles, switches, lighting or other outlets and $2.18 for additional ones, $15.97 for each fixed residential appliance of three horsepower or less, $58.35 for a service, switchboard, motor control center or panelboard of 600 volts or less and not over 399 amperes, $114.29 from 400 to 1,000 amperes.
  • A new private residential inground swimming pool system is $121.52.
  • Investigation fee for work done without a required permit is not less than $504.47, or $252.23 for one or two family dwellings when the work is performed by an owner-builder.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Los Angeles County compares in California

No California jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.

JurisdictionPermit needed?Typical fee
Alameda CountyPermit requiredSee schedule
Contra Costa CountyPermit requiredSee schedule
Fresno CountyPermit requiredSee schedule
Los AngelesPermit requiredSee schedule
Los Angeles Countythis pagePermit requiredSee schedule
Orange CountyPermit requiredElectrical Permit Application Flat Fee, 1 to 75 fixtures: $340 for FY 2024-25, $356 for FY 2025-26, $362 for FY 2026-27
Riverside CountyPermit requiredResidential Electrical (BEL-RELE): $448.20 fixed fee

How to apply in Los Angeles County

General guide, not specific to this office

What an electrical permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how an electrical permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

Los Angeles County Public Works, Building and Safety Division

  • Los Angeles County Public Works, Building and Safety Division, 3rd Floor, 900 S. Fremont Avenue, Alhambra, CA 91803
  • Phone: 626-458-3173

Permitting activity in Los Angeles County

In 2025, Los Angeles County authorized permits for 22,250 new residential housing units (10,106 single-family, 12,144 in multi-family buildings), valued at $4.6B, up from 19,809 the year before. That works out to about 2.3 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 9,694,934.

What else needs a permit in Los Angeles County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsheight of the deck surface above grade; the exemption also requires the deck not to be over any basement or story below and not to be part of an accessible routeSee schedule
Fence PermitIt dependsheight of a fence or freestanding block wall measured from the lowest adjacent grade; a masonry or concrete fence must also be set back from a public way at least a distance equal to its height to stay exemptSee schedule
HVAC PermitPermit requiredAny sizeMechanical Code Fee Schedule (Title 29 of the County of Los Angeles Code, Ord No. 2013-0051), effective July 1, 2026: $41.35 for the issuance of each permit
Patio PermitIt dependsBefore building a patio cover, a carport, an enclosed patio, or any patio work that...See schedule
Plumbing PermitPermit requiredAny sizePlumbing Code Fee Schedule (Title 28 of the Los Angeles Code, Ord. No. 2013-0050), effective July 1, 2026: $41.35 for issuing each permit
Pool PermitIt dependsdepth of a prefabricated pool or other body of water accessory to a one- or two-family (Group R-3) home; the same exemption also reaches pools that do not exceed 5,000 gallons and are installed entirely above adjacent gradeThe building portion is priced from the valuation-based Table 1-A Building Permit Fees plus the $41.35 permit issuance fee; the schedule has the rest
Roof Replacement PermitPermit requiredAny sizeSee schedule
Shed PermitIt dependsgross floor area of a one-story detached accessory building; the exemption also requires the height not to exceed 12 feet and the maximum roof projection not to exceed 24 inchesSee schedule
Solar PermitPermit requiredAny sizeSee schedule

Frequently asked questions

Do you need an electrical permit in Los Angeles County?
Yes, before installing, extending, altering, or replacing electrical wiring, devices, panels, services, or fixed appliances, including main service panel upgrades and EV charger outlets. If you are unsure how that applies to your project, call the Los Angeles County Public Works, Building and Safety Division at 626-458-3173 before you start.
How much does an electrical permit cost in Los Angeles County?
The fee wording from the official schedule is in the cost table on this page, as we read it on 15 Aug 2026. For the figure on your own project, call the Los Angeles County Public Works, Building and Safety Division at 626-458-3173.
How long does an electrical permit take in Los Angeles County?
Express Electrical Permits are self-issued online: the building permit is automatically issued after all required fees are successfully paid. Times can vary by workload and project scope, so confirm with the office.
Where do you apply for an electrical permit in Los Angeles County?
You can apply through the Los Angeles County permit portal or contact the Los Angeles County Public Works, Building and Safety Division directly. The links are listed on this page.
Can a homeowner pull an electrical permit themselves in Los Angeles County?
Under California law (Business & Professions Code 7044(a)-(b); Business & Professions Code 7031.5): California exempts an owner from contractor licensing under section 7044 when they personally perform all the work on their own property, or any work they do not perform themselves is done by their own employees paid only wages, and none of the improvements are intended or offered for sale. It also exempts an owner who directly contracts with licensed contractors for each trade, as long as no more than four of the single-family residential structures involved are intended or offered for sale in a calendar year; this route does not apply if the owner instead contracts with a general contractor for the construction. A homeowner may also improve their own principal residence without a license, as long as the work is done before any sale, they have actually resided there for the 12 months before completion, and they have not used this exemption on more than two structures more than once in any three-year period. Selling a self-built structure within one year of completion creates a rebuttable presumption that it was built for sale, which defeats the exemption, and selling five or more structures within a year makes that presumption conclusive. Separately, every city or county that requires a permit must also require the applicant to file a signed statement giving their contractor license number or the basis of their claimed exemption; a false or missing statement carries a civil penalty of up to $500. Confirm how Los Angeles County applies this before you apply.

From the Library

Electrical Permit in other California localities

Everything above, sourced

dpw.lacounty.gov: faqread

How this electrical permit page for Los Angeles County was verified. 2 official sources: dpw.lacounty.gov, dpw.lacounty.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Los Angeles County Public Works, Building and Safety Division. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Permit required
Check my project