California / Los Angeles County

HVAC Permit in Los Angeles County, California

Permit required

Yes, a permit is required

Before installing, altering, relocating, or replacing a furnace, heater, boiler, air conditioner, refrigeration compressor, air handling unit, evaporative cooler (other than portable), ventilation system, or appliance vent.

Quick answer

Los Angeles County requires a mechanical permit for new, expanded, or replaced mechanical items in unincorporated areas. Title 29, Section 111.1 exempts only a narrow list: any portable heating appliance, portable ventilating equipment, portable cooling unit, portable evaporative cooler, steam, hot, or chilled water piping within regulated heating or cooling equipment, replacement of a component part or assembly of an appliance that does not alter its original approval, refrigerating equipment that is part of already-permitted equipment, and any unit refrigerating system. A straightforward residential changeout that needs no plan review can be self-issued online as an Express Mechanical Permit through EPIC-LA, which is issued automatically once fees are paid.

Issued by
Los Angeles County Public Works, Building and Safety Division
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

HVAC contractors usually pull this permit as part of the job. If you have not picked one yet, compare a few quotes before you commit.

Compare HVAC contractor quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What an HVAC permit costs in Los Angeles County

Fee schedule in force
Official scheduleRead .
Published in
Mechanical Code Fee Schedule (Title 29 of the County of Los Angeles Code, Ord No. 2013-0051), effective July 1, 2026:
  • $41.35 for the issuance of each permit;
  • $40.66 for the installation, alteration or relocation of each refrigeration compressor or absorption unit and for each fuel burning furnace, heater, boiler and vented decorative appliance including vents attached thereto up to and including 100,000 BTU ($78.33 for more than 100,000 up to and including 500,000 BTU, $196.18 above that);
  • $19.30 for each air handling unit up to and including 2,000 CFM for the first 10 units;
  • $6.32 for each air inlet and air outlet served by an air-conditioning system, or $55.71 per 1,000 square feet of conditioned area where the count is unknown;
  • $19.30 for each appliance vent not included in an appliance permit;
  • $40.66 for alteration of an existing duct system.
  • The investigation fee for work done without a required permit equals the permit fee, but is not less than $504.47 ($252.23 for one or two family dwellings when the work is performed by an owner-builder).

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Los Angeles County compares in California

No California jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.

JurisdictionPermit needed?Typical fee
Alameda CountyPermit requiredSee schedule
Contra Costa CountyPermit requiredSee schedule
Fresno CountyPermit requiredSection 2510 Mechanical Code Fees, FY 2026-27: Issuing each permit $42.77
Los AngelesPermit requiredSee schedule
Los Angeles Countythis pagePermit requiredSee schedule
Orange CountyPermit requiredMechanical Permit Application Flat Fee: $400 for FY 2024-25, $420 for FY 2025-26, $429 for FY 2026-27; the schedule has the rest
Riverside CountyPermit requiredResidential Mechanical (BME-RMEC): $274.30 fixed fee; the schedule has the rest

How to apply in Los Angeles County

General guide, not specific to this office

What an HVAC permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how an HVAC permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

Los Angeles County Public Works, Building and Safety Division

  • Los Angeles County Public Works, Building and Safety Division, 3rd Floor, 900 S. Fremont Avenue, Alhambra, CA 91803
  • Phone: 626-458-3173

Permitting activity in Los Angeles County

In 2025, Los Angeles County authorized permits for 22,250 new residential housing units (10,106 single-family, 12,144 in multi-family buildings), valued at $4.6B, up from 19,809 the year before. That works out to about 2.3 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 9,694,934.

What else needs a permit in Los Angeles County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsheight of the deck surface above grade; the exemption also requires the deck not to be over any basement or story below and not to be part of an accessible routeSee schedule
Electrical PermitPermit requiredAny sizeSee schedule
Fence PermitIt dependsheight of a fence or freestanding block wall measured from the lowest adjacent grade; a masonry or concrete fence must also be set back from a public way at least a distance equal to its height to stay exemptSee schedule
Patio PermitIt dependsBefore building a patio cover, a carport, an enclosed patio, or any patio work that...See schedule
Plumbing PermitPermit requiredAny sizePlumbing Code Fee Schedule (Title 28 of the Los Angeles Code, Ord. No. 2013-0050), effective July 1, 2026: $41.35 for issuing each permit
Pool PermitIt dependsdepth of a prefabricated pool or other body of water accessory to a one- or two-family (Group R-3) home; the same exemption also reaches pools that do not exceed 5,000 gallons and are installed entirely above adjacent gradeThe building portion is priced from the valuation-based Table 1-A Building Permit Fees plus the $41.35 permit issuance fee; the schedule has the rest
Roof Replacement PermitPermit requiredAny sizeSee schedule
Shed PermitIt dependsgross floor area of a one-story detached accessory building; the exemption also requires the height not to exceed 12 feet and the maximum roof projection not to exceed 24 inchesSee schedule
Solar PermitPermit requiredAny sizeSee schedule

Frequently asked questions

Do you need an HVAC permit in Los Angeles County?
Yes, before installing, altering, relocating, or replacing a furnace, heater, boiler, air conditioner, refrigeration compressor, air handling unit, evaporative cooler (other than portable), ventilation system, or appliance vent. If you are unsure how that applies to your project, call the Los Angeles County Public Works, Building and Safety Division at 626-458-3173 before you start.
How much does an HVAC permit cost in Los Angeles County?
The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Nov 2026. For the figure on your own project, call the Los Angeles County Public Works, Building and Safety Division at 626-458-3173.
How long does an HVAC permit take in Los Angeles County?
Express Mechanical Permits are self-issued online: the building permit is automatically issued after all required fees are successfully paid. Times can vary by workload and project scope, so confirm with the office.
Where do you apply for an HVAC permit in Los Angeles County?
You can apply through the Los Angeles County permit portal or contact the Los Angeles County Public Works, Building and Safety Division directly. The links are listed on this page.
Can a homeowner pull an HVAC permit themselves in Los Angeles County?
Under California law (Business & Professions Code 7044(a)-(b); Business & Professions Code 7031.5): California exempts an owner from contractor licensing under section 7044 when they personally perform all the work on their own property, or any work they do not perform themselves is done by their own employees paid only wages, and none of the improvements are intended or offered for sale. It also exempts an owner who directly contracts with licensed contractors for each trade, as long as no more than four of the single-family residential structures involved are intended or offered for sale in a calendar year; this route does not apply if the owner instead contracts with a general contractor for the construction. A homeowner may also improve their own principal residence without a license, as long as the work is done before any sale, they have actually resided there for the 12 months before completion, and they have not used this exemption on more than two structures more than once in any three-year period. Selling a self-built structure within one year of completion creates a rebuttable presumption that it was built for sale, which defeats the exemption, and selling five or more structures within a year makes that presumption conclusive. Separately, every city or county that requires a permit must also require the applicant to file a signed statement giving their contractor license number or the basis of their claimed exemption; a false or missing statement carries a civil penalty of up to $500. Confirm how Los Angeles County applies this before you apply.

From the Library

HVAC Permit in other California localities

Everything above, sourced

How this HVAC permit page for Los Angeles County was verified. 2 official sources: dpw.lacounty.gov, dpw.lacounty.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Los Angeles County Public Works, Building and Safety Division. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Permit required
Check my project