California / Orange County

Electrical Permit in Orange County, California

Permit required

Yes, a permit is required

Before installing electrical equipment, wiring, a service panel upgrade or any alteration or addition to existing electrical equipment in unincorporated Orange County

Confirmed on official page Verified OC Public Works, OC Development Services (Building & Safety)

By Mario Bailey, verified against official sources

Quick answer

Orange County adopted the 2025 California Electrical Code by Ordinance No. 25-021 on November 4, 2025 and added Section 90-16, which bars any electrical installation, alteration or addition in the unincorporated area without a permit from the Building Official, subject to 17 listed exempt classes of work. The exemptions cover minor repair work such as replacing lamps and plugging in portable equipment, like-for-like repair or replacement of fixed motors, transformers, appliances, switches, overcurrent devices and sign electrodes, temporary decorative lighting, taping joints, removing wiring, and equipment operating at less than 25 volts and not capable of supplying more than 50 watts. This applies to unincorporated Orange County only; the county's 34 incorporated cities run their own building departments.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?

When a permit is usually needed

Before installing electrical equipment, wiring, a service panel upgrade or any alteration or addition to existing electrical equipment in unincorporated Orange County

What an electrical permit costs in Orange County

Line item
electrical permitBy formulaElectrical Permit Application Flat Fee, 1 to 75 fixtures: $340 for FY 2024-25, $356 for FY 2025-26, $362 for FY 2026-27; 76 or more fixtures: $531, $558 and $569 across the same three fiscal years. The flat fee covers receptacles, switches, lighting outlets and fixtures, residential and non-residential appliances, service panels and panel upgrades up to 400 amps. Stand Alone Electrical permit for individual appliances: $174, $182 and $185. Electric Vehicle Charging Station, up to 2 stations: $298, $314 and $320. Energy Storage System (ESS): $330, $346 and $353. Electrical Plan Check is 20% of the building permit fee for residential over 3,000 square feet or all non-residential projects as determined by the Building Official. From the OC Development Services Fee Schedule 2024-2027, fees effective July 21, 2024.
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Orange County compares in California

No California jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.

JurisdictionPermit needed?Typical fee
Alameda CountyPermit requiredBuilding Inspection Department Service Fee Schedule (Schedule A, effective...
Contra Costa CountyPermit requiredLand Development Fee Schedule S-002 C.6, "Electrical Permit (Other) $75.00...
Fresno CountyPermit requiredSection 2511 Electrical Code Fees, FY 2026-27: Issuing permits $42.77 each
Los AngelesPermit requiredItemized per installed item per the LADBS Electrical Permit Fee Schedule (rev...
Los Angeles CountyPermit requiredElectrical Code Fee Schedule (Title 27 of the County of Los Angeles Code, Ord...
Orange Countythis pagePermit requiredElectrical Permit Application Flat Fee, 1 to 75 fixtures: $340 for FY 2024-25...
Riverside CountyPermit requiredResidential Electrical (BEL-RELE): $448.20 fixed fee

How to apply in Orange County

In most US jurisdictions, the property owner or a licensed electrician applies for an electrical permit before work starts, describing the scope of work and the property and typically attaching plans. Some minor, like-for-like electrical repairs are commonly exempt, and once issued the permit is kept on site until the job is finished.

What most electrical permit applications include:

  • Before any electrical work begins, the owner or an authorized agent must first apply to the building official and obtain the required permit (IRC R105.1).
  • The written application must identify and describe the electrical work covered by the permit and describe the property, such as by street address, well enough to locate the job (IRC R105.3).
  • The application must be accompanied by construction documents (plans) and any other information the permit office requires, and must be signed by the applicant or an authorized agent (IRC R105.3).
  • Certain minor or like-for-like electrical jobs, such as replacing a branch-circuit breaker of the required capacity in the same location, are commonly exempt from needing a separate permit (IRC R105.2).
  • Once issued, the building permit or a copy of it must be kept at the job site until the project is complete (IRC R105.7).

General submittal guidance from International Residential Code (IRC), Section R105, Permits (2015 and 2021 editions, as locally adopted). Source. OC Public Works, OC Development Services (Building & Safety) sets the exact checklist for Orange County.

Where to apply in Orange County:

OC Public Works, OC Development Services (Building & Safety)

  • 601 N. Ross Street, Santa Ana, CA 92701 (mailing: P.O. Box 4048, Santa Ana, CA 92702-4048)
  • Phone: 714-667-8888
  • Email: OCPWPermitting@ocpw.ocgov.com

Inspections and closing out your permit

Electrical work under a permit is inspected at least twice: a rough-in inspection of the wiring before it is covered by drywall or insulation, and a final inspection once all devices, panels, and labeling are complete. Inspectors also check specific safety items along the way, such as GFCI and AFCI protection, panel circuit directories, and the service disconnect location.

  1. A rough-in inspection of the electrical wiring is required before it is covered or concealed by insulation, drywall, or other finish material, and before fixtures or appliances are set (IRC R109.1.2).
  2. The framing inspection cannot proceed until the plumbing, mechanical, and electrical rough-in inspections have all been approved (IRC R109.1.4).
  3. Ground-fault circuit-interrupter (GFCI) protection is checked at receptacles in bathrooms, kitchens, garages, basements, crawl spaces, outdoors, and other damp or wet locations (NEC 210.8(A)).
  4. Arc-fault circuit-interrupter (AFCI) protection is verified on branch circuits serving bedrooms, living areas, and most other habitable rooms (NEC 210.12(A)).
  5. Panelboards must carry a circuit directory that legibly and specifically identifies the purpose of each circuit, not a vague label (NEC 408.4).
  6. The service disconnect must be installed in a readily accessible location, either outside the structure or just inside the point where the service conductors enter (NEC 230.70).
  7. A final inspection is made only after all permitted electrical work is complete, and the wiring cannot be used or the space occupied until it passes (IRC R109.1.6).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Orange County permit portal or by phone at 714-667-8888.

Inspection sequence from International Residential Code (IRC), Section R109, Required Inspections, and NFPA 70 National Electrical Code (NEC), 2020 and 2023 editions. Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need an electrical permit in Orange County?
Orange County adopted the 2025 California Electrical Code by Ordinance No. 25-021 on November 4, 2025 and added Section 90-16, which bars any electrical installation, alteration or addition in the unincorporated area without a permit from the Building Official, subject to 17 listed exempt classes of work. The exemptions cover minor repair work such as replacing lamps and plugging in portable equipment, like-for-like repair or replacement of fixed motors, transformers, appliances, switches, overcurrent devices and sign electrodes, temporary decorative lighting, taping joints, removing wiring, and equipment operating at less than 25 volts and not capable of supplying more than 50 watts. This applies to unincorporated Orange County only; the county's 34 incorporated cities run their own building departments. Always confirm with the OC Public Works, OC Development Services (Building & Safety) before starting.
How much does an electrical permit cost in Orange County?
Electrical Permit Application Flat Fee, 1 to 75 fixtures: $340 for FY 2024-25, $356 for FY 2025-26, $362 for FY 2026-27; 76 or more fixtures: $531, $558 and $569 across the same three fiscal years. The flat fee covers receptacles, switches, lighting outlets and fixtures, residential and non-residential appliances, service panels and panel upgrades up to 400 amps. Stand Alone Electrical permit for individual appliances: $174, $182 and $185. Electric Vehicle Charging Station, up to 2 stations: $298, $314 and $320. Energy Storage System (ESS): $330, $346 and $353. Electrical Plan Check is 20% of the building permit fee for residential over 3,000 square feet or all non-residential projects as determined by the Building Official. From the OC Development Services Fee Schedule 2024-2027, fees effective July 21, 2024. See the official fee schedule for current amounts.
Where do you apply for an electrical permit in Orange County?
You can apply through the Orange County permit portal or contact the OC Public Works, OC Development Services (Building & Safety) directly. The links are listed on this page.
Can a homeowner pull an electrical permit themselves in Orange County?
Under California law (Business & Professions Code 7044(a)-(b); Business & Professions Code 7031.5): California exempts an owner-builder from contractor licensing when the owner personally performs the work, or uses only wage employees, on their own property and does not intend the improvements for sale. A homeowner may also directly hire licensed trade contractors for up to four single-family residences a year, or improve their own principal residence without a general contractor's license, as long as they have actually lived there for the 12 months before the work is finished. Selling a self-built structure within one year of completion creates a rebuttable presumption that it was built for sale, which defeats the exemption, and selling five or more structures within a year makes that presumption conclusive. Separately, every city or county that requires a building permit must also require the applicant to file a signed statement giving their contractor license number or the basis of their claimed exemption; a false or missing statement carries a $500 civil penalty. Confirm how Orange County applies this before you apply.

From the Library

What else needs a permit in Orange County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredNot specifiedDecks are priced under the patio line items in the OC Development Services Fee Schedule...
Fence PermitIt dependsFences and freestanding walls over six feet in height require a building permit; fences not over six feet are exempt unless a permit was required as a condition of project approvalFences (over 6'): valuation-based, per the OC Development Services Fee Schedule...
HVAC PermitPermit requiredNot specifiedMechanical Permit Application Flat Fee: $400 for FY 2024-25, $420 for FY 2025-26, $429...
Patio PermitPermit requiredNot specifiedPatio, Standard: Covers, Decks, Balconies, Enclosures: $768 for FY 2024-25, $803 for FY...
Plumbing PermitPermit requiredNot specifiedPlumbing Permit Application Flat Fee: $363 for FY 2024-25, $383 for FY 2025-26, $391 for...
Pool PermitPermit requiredNot specifiedPool/Spa - New: valuation-based.
Roof Replacement PermitPermit requiredNot specifiedReroof: $342 for FY 2024-25, $362 for FY 2025-26, $370 for FY 2026-27.
Shed PermitIt dependsOne-story detached accessory buildings used as tool and storage sheds, play houses and similar uses are exempt from a building permit only when the floor area does not exceed 120 square feet and the structure sits at least 3 feet from the property line and 6 feet from other buildings on the same propertyThe OC Development Services Fee Schedule 2024-2027 (effective July 21, 2024) publishes...
Solar PermitPermit requiredNot specifiedSolar Permits, Roof-Mounted (includes County Standard Plan): $428 for FY 2024-25, $448...

Electrical Permit in other California localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not Orange County documents; the office above sets the local rules.

Verified by a person against the sources above on , not confirmed with OC Public Works, OC Development Services (Building & Safety). Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page